Oklahoma-Texas
Area Office
5316 Highway 290 West, Suite 510 Area Manager:
|
Above: Oklahoma-Texas Area Office Map |
Texas:
The OTAO is responsible for Reclamation activities in all of Texas except for the area west of the Pecos River Basin. Much of the program emphasis is on municipal and industrial water, although irrigation is the primary purpose at the San Angelo Project. Reclamation projects provide municipal and industrial water to over one million people, flood protection, and numerous recreation sites. In 2003, these sites provided recreation opportunities for over 1.3 million visitors. The Nueces River Project provides municipal and industrial water to the Corpus Christi area. In addition to irrigation, the San Angelo Project provides for the integrated operation of Twin Buttes Reservoir with Lake Nasworthy to meet the municipal water requirements of the city of San Angelo. The project also provides fish and wildlife, recreation, and flood control benefits. The Canadian River Project provides municipal and industrial water to 11 cities in the Texas Panhandle including Amarillo and Lubbock. This project also provides flood control and recreation benefits to the area.
- Contact OTAO's Public Involvement Specialist
- Equus Beds Aquifer Recharge, Storage, and Recovery Program (ASR Project)
- Concluding Appraisal Report, Conveyance System Expansion, Fort Cobb Division, Washita Basin Project, Oklahoma
- Appraisal Report for the W.C. Austin Project Water Supply Augmentation Study (*optimized for faster download 3.5 mb)
- Appraisal Report for the W.C. Austin Project Water Supply Augmentation Study (same document as above, except higher quality, longer download, 7 mb)
- MORE PUBLIC INVOLVEMENT LINKS...