Biological Assessments & Opinions | Environmental Assessments | Environmental Impact Statements | Federal Register Notices |
Findings of No Significant Impact | Records of Decision | Technical Reports | Public Meeting Materials | Adaptive Management Plans
Biological Assessments & Opinions
- 10-year Biological Opinion for Reclamation's Proposed Carlsbad Project Water Operations and Water Supply Conservation 2006 - 2016 (May 2006)
- Interim Biological Opinion for the Bureau of Reclamation's Proposed Pecos River Dam Operations (April 2006)
- Programmatic Biological Assessment of Bureau of Reclamation's Water and River Maintenance Operations, Army Corps of Engineers' Flood Control Operation, and Related Non-Federal Actions on the Middle Rio Grande, New Mexico (March 1, 2003 - February 28, 2005) - 4.4 MB
- Biological Opinion and Conference Report on U.S. Bureau of Reclamation's Amended Water Management Operations on the Middle Rio Grande through December 31st, 2002 - 637 KB
- Biological Assessment of Proposed Pecos River 2002 Irrigation Season Operations on the Pecos Bluntnose Shiner (April 2002) - 345 KB
- Initiation of Formal Consultation for the Pecos River 2002 Irrigation Season Water Operations, Biological Opinion (February 2002) - 58 KB
- Biological Assessment: Effects of LFCC Experimental Operations: Water Diversions from the Rio Grande and Parrot Feather Removal (March 2002) - 3.8 MB
- Biological Opinion on the Effects of Actions Associated with Reclamation's, Army Corps of Engineers', and Non-Federal Entities' Discretionary Actions Related to Water management on the Middle Rio Grande, New Mexico (June 2001) - 474 KB
- Biological Opinon on Reclamation's 2001 Discritionary Actions Related to Water Management on the Pecos River, New Mexico (May 2001) - 257 KB
- Biological Assessment for the Carlsbad Project Acquired Land Transfer Act (April 2001) - 93 KB
- Biological Assessment of Proposed Pecos River 2001 Interim Irrigation Season Operations on the Pecos Bluntnose Shiner (February 2001) - 205 KB
- Request for Endangered Species Consultation for Reclamation's Winter Operations Plan on the Pecos River for the Pecos Bluntnose Shiner, Biological Opinion (February 2001) - 309 KB
- Interim Programmatic Biological Assessment of Effects of Proposed Pecos River Winter Operations on the Pecos Bluntnose Shiner (November 2000) - 176 KB
- Interim Programmatic Biological Assessment of Proposed Pecos River Operations on the Listed Species of the Pecos River Basin - Draft (April 2000) - 401 KB
- Biological Opinion on the Biological Assessment of the 1999-2000 Winter Operations of Sumner Dam on Threatened, Endangered, and Proposed Species of the Pecos River Basin (March 2000) - 264 KB
- Biological Assessment of Proposed Pecos River 1999-2000 Winter Operations on Proposed, Threatened, and Endangered Species of the Pecos River Basin (January 2000) 159 KB
- Biological Assessment: Rio grande Restoration at Santa Ana Pueblo, Terrestrial Habitation Enhancement Plan, Rio Grande Silvery Minnow, Southwestern Willow Flycatcher, Bald Eagle (July 1999) - 1 MB
- Draft Environmental Assessment - Pecos River Channel Restoration at the Bitter Lake National Wildlife Refuge, Chaves County, New Mexico (September 2008)
- Final Environmental Assessment - Drought Emergency Well for Eunice, New Mexico (July 2008)
- Final Environmental Assessment - Drought Emergency Water Well for Hagerman, New Mexico (July 2008)
- Final Environmental Assessment - Drought Emergency Water Well for Carlsbad, New Mexico (May 2008)
- Draft Environmental Assessment for El Paso County Riverside Canal and Structure Improvement Project (March 2008)
- Environmental Assessment - Santo Domingo Tribe - Endangered Species Habitat Improvement Project - Phase III (March 2008)
- Draft Environmental Assessment of River Mile 111 Priority Site Project (February 2008)
- Draft Environmental Assessment - Pueblo of Sandia Rio Grande Bosque Rehabilitation Project (December 2007)
- Environmental Assessment - Pueblo of San Felipe Bosque Restoration Project (September 2007)
- Environmental Assessment - Perennial Rio Grande Silvery Minnow Refugia at Drain Outfalls (July 2007)
- Draft Environmental Assessment for the Cochiti Priority Sites Rivermile 231.3 and 228.9 (August 2007)
- Final Environmental Assessment - Long-Term Lease of Groundwater Rights, Pecos River near Ft. Sumner, New Mexico (July 2007)
- Environmental Assessment - Federal Rio Grande Project New Mexico-Texas Operating Procedures, Dona Ana, Sierra, and Socorro Counties, New Mexico and El Paso County, Texas (June 2007)
- Final Environmental Assessment - Santo Domingo Tribe - Endangered Species Habitat Improvement Project Phase II (April 2007)
- Environmental Assessment - Seven Rivers Pipeline, Pecos River, New Mexico (April 2007)
- Final Environmental Assessment - City of Albuquerque Habitat Restoration Project (February 2007)
- Environmental Assessment and FONSI for Integrated Pest Management in the Pecos River Basin [Sumner, Brantley, and Avalon Dams] (January 2007)
- Environmental Assessment - Middle Rio Grande Riverine Restoration Project Phase II (January 2007)
- Environmental Assessment - Pecos River Supplemental Water and Exchange
- Draft Environmental Assessment - For the Community of Chimayo Water System (September 2006)
- Final Environmental Assessment - Middle Rio Grande Project Sandia Priority Site (July 2006)
- Final Environmental Assessment - Middle Rio Grande Project Bernalillo Priority Site (July 2006)
- Supplement to the Rio Grande Supplemental Water Programmatic Environmental Assessment (May 2006)
- Environmental Assessment - San Juan-Chama Water Contract Amendments with City of Santa Fe, County of Santa Fe, County of Los Alamos, Town of Taos, Village of Taos Ski Valley, Village of Los Lunas, and City of EspaƱola (May 2006)
- Environmental Assessment - Santo Domingo Tribe - Habitat Restoration for the Endangered Rio Grande Silvery Minnow and Salt Cedar Removal Project (March 2006)
- Final Environmental Assessment - Middle Rio Grande Riverine Restoration Project (December 2005)
- Final Environmental Assessment - Rio Grande Silvery Minnow Sanctuary (November 2005)
- Draft Environmental Assessment - Espanola Dikes Cross-Drainage [Borregos Arroyo Project] (November 2005)
- Final Environmental Assessment - Jicarilla Apache Nation Water Subcontract to the city of Santa Fe (October 2005)
- Environmental Assessment - Drought Relief Well at Taos Pueblo (August 2005)
- Final Environmental Assessment - San Acacia Priority Sites, River Miles 114 and 113 (April 2005)
- Final Environmental Assessment / Biological Assessment - Pecos Saltcedar Control and Demonstration Project (Sept. 2004)
Environmental Impact Statements
- Final Environmental Impact Statement - Upper Rio Grande Basin Water Operations Review [ joint EIS] (April 2007)
- Final Environmental Impact Statement - Long-Term Miscellaneous Purposes Contract (July 2006)
- Final Environmental Impact Statement - Carlsbad Project Water Operations and Water Supply Conservation (June 2006)
- Draft Environmental Impact Statement - Carlsbad Project Water Operations & Water Supply Conservation (September 2005)
- Final Environmental Impact Statement - City Of Albuquerque Drinking Water Project (March 2004)
- Environmental Impact Statement - Carlsbad Miscellaneous Purposes Contract
- Notice of Availability for the Long-Term Miscellaneous Purposes Contract Final EIS (July 2006)
- Notice of Availability for the Carlsbad Project Water Operations and Water Supply Conservation (June 2006)
- Rio Grande and Low Flow Conveyance Channel Modifications Draft EIS Notice
- Rio Grande and Low Flow Conveyance Channel - Notice of Availability and Notice of Public Hearings for the Draft Environmental Impact Statement on the Rio Grande and Low Flow Conveyance Channel Modifications (Sept. 2000)
- Upper Rio Grande Basin Water Operations Review - Notice of Public Scoping Meetings on Development of a Draft Environmental Impact Statement for Upper Rio Grande Basin Water Operations (June 2000)
- Upper Rio Grande Basin Water Operations Review - Notice of Intent to Prepare an Environmental Impact Statement for Upper Rio Grande Basin Water Operations (March 2000)
Findings Of No Significant Impact
- Finding of No Significant Impact - Pecos River Channel Restoration at the Bitter Lake National Wildlife Refuge, Chaves County, New Mexico (September 2008)
- Finding of No Significant Impact - Drought Emergency Water Well for Hagerman, New Mexico (June 2008)
- Finding of No Significant Impact - Santo Domingo Tribe - Endangered Species Habitat Improvement Project Phase III (March 2008)
- Finding of No Significant Impact - Pueblo of San Felipe Bosque Restoration Project (September 2007)
- Finding of No Significant Impact - Perennial Rio Grande Silvery Minnow Refugia at Drain Outfalls (August 2007)
- Finding of No Significant Impact - for the Cochiti Priority Sites Rivermile 231.3 and 228.9 (August 2007)
- Finding of No Significant Impact - Long-Term Lease of Groundwater Rights, Pecos River near Ft. Sumner, New Mexico (June 2007)
- Finding of No Significant Impact - Federal Rio Grande Project New Mexico-Texas Operating Procedures, Dona Ana, Sierra, and Socorro Counties, New Mexico and El Paso County, Texas (June 2007)
- Finding of No Significant Impact - Santo Domingo Tribe - Endangered Species Habitat Improvement Project Phase II (April 2007)
- Finding of No Significant Impact - Seven Rivers Pipeline, Pecos River, New Mexico (April 2007)
- Finding of No Significant Impact - City of Albuquerque habitat Restoration Project (February 2007)
- Finding of No Significant Impact - Integrated Pest Management in the Pecos River Basin [Sumner, Brantley, and Avalon Dams] (January 2007)
- Finding of No Signifinant Impact - El Paso County Riverside Canal Structure Improvement Project (January 2007)
- Finding of No Significant Impact - Middle Rio Grande Riverine Restoration Project Phase II (January 2007)
- Finding of No Significant Impact - Middle Rio Grande Project - Sandia Priority Site (July 2006)
- Finding of No Significant Impact - Middle Rio Grande Project - Bernalillo Priority Site (July 2006)
- Finding of No Significant Impact - Supplement to the Rio Grande Supplemental Water Programmatic Environmental Assessment
- Finding of No Significant Impact - San Juan–Chama Water Contract Amendments with City of Santa Fe, County of Santa Fe, County of Los Alamos, Town of Taos, Village of Taos Ski Valley, Village of Los Lunas, and City of Española (May 2006)
- Finding of No Significant Impact - Middle Rio Grande Riverine Restoration Project (December 2005)
- Finding of No Significant Impact - Rio Grande Silvery Minnow Sanctuary (November 2005)
- Finding of No Significant Impact - Jicarilla Apache Nation Water Subcontract to the city of Santa Fe (Oct. 2005)
- Finding of No Significant Impact - Drought Relief Well at Taos Pueblo (August 2005)
- Final Environmental Assessment and Finding of No Significant Impact - Drought Relief Well at Taos Pueblo
- Final Environmental Assessment and Finding of No Significant Impact - San Juan-Chama Water Contracts with the Pueblo of San Juan
- Final Environmental Assessment and Finding of No Significant Impact - Non-Potable Water Reclamation and Reuse, Northeast Heights and Southeast Albuquerque
- Final Environmental Assessment and Finding of No Significant Impact - Programmatic Environmental Assessment: Rio Grande Supplemental Water Program
- Record of Decision - Upper Rio Grande Basin Water Operations Review [ joint EIS] (August 2007)
- Record of Decision - Carlsbad Miscellaneous Purposes Contract (August 2006)
- Carlsbad Project Water Operations & Water Supply Conservation Record of Decision (July 2006)
- Record Of Decision - City Of Albuquerque Drinking Water Project
- Record Of Decision - Elephant Butte And Caballo Reservoir Resource Management Plans
- Brantely and Avalon Dams Integrated Vegetation Management Plan (January 2007)
- 2006 Interior Least Tern Monitoring Results Report - Dec. 2006
- Accuracy of HEC-RAS to Calculate Flow Depths and Total Energy Loss with and without Bendway Weirs in a Meander Bend (December 2005)
- Sediment Plug - Computer Modeling Study, Tiffany Junction Reach Middle Rio Grande Project (Oct. 2005)
- Draft Adaptive Management Plan for the Taiban Constant Alternative - Carlsbad Project Water Operations and Water Supply Conservation Environmental Impact Statement (January 2006)
- 2006 Annual Adaptive Management Report for the Carlsbad Project Water Operations and Water Supply Conservation Environmental Impact Statement, Pecos River, New Mexico (March 2007)
- 2007 Annual Adaptive Management Rport for the Carlsbad Project Water Operations and Water Supply Conservation Environmental Impact Statement (April 2008)