Skip to Search Skip to Left Navigation U.S. Department of Transportation (US DOT) Research and Innovative Technology Administration (RITA) Bureau of Transportation Statistics (BTS)Bureau of Transportation Statistics (BTS) - Research and Innovative Technology Administration (RITA) - United States Department of Transportation (USDOT, US DOT or DOT)
  ABOUT RITA | CONTACT US | PRESS ROOM | CAREERS | SITE MAP
Bureau of Transportation Statistics
Data and Statistics
Bookstore
Programs
About BTS
Upcoming Press Releases
External Links
Intelligent Transportation Systems
National Transportation Library
Research, Development and Technology
Transportation Safety Institute
University Transportation Centers
Volpe National Transportation Systems Center
Printable Version

4-13
Amtrak On-Time Performance Trends and Hours of Delay by Cause: 2004-2007

Excel | CSV

  2004 2005 2006 2007
On-time performance        
Total (weighted) 70.7% 69.8% 67.8% 68.6%
Short distance (<400 miles)a 75.2% 73.6% 72.8% 72.2%
Long distance (>400 miles) 40.7% 42.1% 29.9% 39.5%
Hours of delay by cause        
Amtrakb R28,323 25,549 23,968 22,902
Host railroadc 61,256 64,097 71,387 72,565
Otherd R5,582 5,613 6,166 6,187
Totale 95,162 95,260 101,522 101,655

a Includes all Amtrak Northeast Corridor and Empire Service (New York State) trains.
b Includes all delays when operating on Amtrak-owned tracks and delays for equipment or engine failure, passenger handling, holding for connections, train servicing, and mail/baggage handling when on tracks of a host railroad. c Includes all operating delays not attributable to Amtrak when operating on tracks of a host railroad (e.g., track- and signal-related delays, power failures, freight and commuter train interference, routing delays). d Includes delays not attributable to Amtrak or host railroads (e.g., customs and immigration, law enforcement action, weather, or waiting for scheduled departure time). e Numbers may not add to totals due to rounding.

Key: R = revised.

Notes: All percentages are based on Amtrak's fiscal year (Oct. 1-Sept. 30). Host railroad is a freight or commuter railroad over which many Amtrak trains operate for all or part of their trips.

Amtrak trips are considered delayed based on the following chart:

Trip length (miles) Arrival time
delay (minutes)
0-250 10
251-350 15
351-450 20
451-550 25
> 551 30

Source: Amtrak, personal communication, October 2007.