NEPA Analysis

Project development necessary for implementation of land use plans (Resource Management Plans) requires analysis under the National Environmental Policy Act (NEPA). NEPA ensures that the BLM (and other Federal agencies) consider the impact of an action on the quality of the human environment before decisions are made and the action is taken. Two types of NEPA documents that are prepared and provide opportunity for public involvement are Environmental Impact Statements and Environmental Assessments.  There are certain actions which have been categorically excluded from further NEPA analysis because it has been determined that the actions have insignificant effects on the human environment.  These actions are documented in a Categorical Exclusion review.  Until recently, these types of actions were not subject to public review.  New categories of excluded actions, including fuels and forest health treatments, now provide for a public review period for those actions.

Project planning updates provide BLM a means to achieve public scoping by notifying the public of the status of projects in the process of planning and analysis for implementation in the near future or currently being implemented. These updates are produced annually for each district.

For additional search options, use the advanced search page.

For a list of state level plans, view the existing plans page.

Key Planning Efforts in Medford

Documents Currently Under Public Review (5 Most Recent)

The following list contains NEPA documents that are currently available for public review, protest, or appeal.

Project Name Start Date End Date Doc Type Resource Area
Turnberg O&C Right-of-Way Permit Categorical Exclusion & Decision Record9/08/08 10/08/08 Decision RecordGlendale
Mountaingrove Federal Land Policy and Management Act Water Right-of-Way Categorical Exclusion9/08/08 10/08/08 Decision RecordGlendale
Jilliana Hazardous Fuel Reduction Project Categorical Exclusion and Decision Record9/24/08 10/09/08 Decision RecordGrants Pass
Kiosk Installation on Bear Camp Road Categorical Exclusion and Decision Record9/24/08 10/24/08 Decision RecordGrants Pass
Verizon Sexton Mt. Communication Site Upgrade9/24/08 10/24/08 Decision RecordGrants Pass

Existing/Historic Documents (5 Most Recent)

The following list contains NEPA documents that have passed the public review period.

Project Name Date Doc Type Resource Area
Vigil CE9/29/2008Categorical Exclusion Review Grants Pass
Deer Willy Hazardous Fuels Reduction project9/29/2008Decision Record Grants Pass
Fawcett Fence Salvage9/24/2008Categorical Exclusion Review Butte Falls
Pleasant Blowdown Road Salvage9/24/2008Categorical Exclusion Review Butte Falls
Beaver Dam Creek Exclosure Tree Planting9/24/2008Categorical Exclusion Review Butte Falls

NEPA Document Library

Project Planning Updates