Table

  1. PPTCPUS - Pentanes Plus
  2. UOTCPUS - Unfinished Oils
  3. FETCPUS - Petrochemical Feedstocks
  4. PCTCPUS - Petroleum Coke
  5. ARTCPUS - Asphalt and Road Oil
  6. SGTCPUS - Still Gas
  7. MZTCPUS - Miscellaneous Products


Related "Other" Petroleum Products Demand Model Documentation


Table 1. Pentanes Plus Demand, PPTCPUS (million barrels per day)
EquationDF ModelDF ErrorSSEMSE Root MSER-Square Adj R-SqDurbin-Watson
PPTCPUS151070.064660.0006040.024580.65370.60842.174
ParameterEstimateApprox. Std. Err.'T' RatioLabel
PPTC_B0-0.0117800.18891-0.06Constant Coefficient
PPTC_T 0.000724000.00010327.02TIME = 1 to n, where n = number of observation
PPTC_MG0.0910790.409090.22MGYLD, refinery yield of motor gasoline
PPTC_E1-0.004845570.0091850-0.53JAN = 1 if January, 0 otherwise
PPTC_E2-0.005390400.01075-0.50FEB = 1 if February, 0 otherwise
PPTC_E3-0.0217390.01194-1.82MAR = 1 if March, 0 otherwise
PPTC_E4-0.0222400.01184-1.88APR = 1 if April, 0 otherwise
PPTC_E5-0.0189010.01187-1.59MAY = 1 if May, 0 otherwise
PPTC_E6-0.0283920.01189-2.39JUN = 1 if June, 0 otherwise
PPTC_E7-0.0211830.01186-1.79JUL = 1 if July, 0 otherwise
PPTC_E8-0.0332830.01189-2.80AUG = 1 if August, 0 otherwise
PPTC_E9-0.008189490.01156-0.71SEP = 1 if September, 0 otherwise
PPTC_E100.0103370.011400.91OCT = 1 if October, 0 otherwise
PPTC_E110.0104420.00929961.12NOV = 1 if November, 0 otherwise
PPTCPUS_L10.3941070.093114.231st-order autocorrelation correction parameter
Method of estimation: OLS with 1st-order autocorrelation correction
Estimation period: January 1988 through February 1998


Table 2. Unfinished Oils Demand, UOTCPUS (million barrels per day)
EquationDF ModelDF ErrorSSEMSE Root MSER-Square Adj R-SqDurbin-Watson
UOTCPUS131570.754920.0048080.069340.24820.19071.633
ParameterEstimateApprox. Std. Err.'T' RatioLabel
UOTC_B00.0230720.032420.71Constant Coefficient
UOTC_RI-0.2315450.03777-6.13UORIPUS, refinery inputs unfinished oils
UOTC_E1-0.0658630.02836-2.32JAN = 1 if January, 0 otherwise
UOTC_E2-0.0577750.02869-2.01FEB = 1 if February, 0 otherwise
UOTC_E3-0.0758220.02987-2.54MAR = 1 if March, 0 otherwise
UOTC_E4-0.0282740.02747-1.03APR = 1 if April, 0 otherwise
UOTC_E5-0.0737210.02740-2.69MAY = 1 if May, 0 otherwise
UOTC_E6-0.0470140.02650-1.77JUN = 1 if June, 0 otherwise
UOTC_E7-0.0507630.02639-1.92JUL = 1 if July, 0 otherwise
UOTC_E8-0.0534050.02670-2.00AUG = 1 if August, 0 otherwise
UOTC_E9-0.0707750.02707-2.61SEP = 1 if September, 0 otherwise
UOTC_E10-0.0522980.02773-1.89OCT = 1 if October, 0 otherwise
UOTC_E11-0.0625790.02666-2.35NOV = 1 if November, 0 otherwise
Method of estimation: OLS
Estimation period: January 1984 through February 1998


Table 3. Petrochemical Feedstocks Demand, FETCPUS (million barrels per day)
EquationDF ModelDF ErrorSSEMSE Root MSER-Square Adj R-SqDurbin-Watson
FETCPUS151550.294370.0018990.043580.83120.81602.181
ParameterEstimateApprox. Std. Err.'T' RatioLabel
FETC_B0-0.2560370.04803-5.33Constant Coefficient
FETC_ZO0.8469820.0525316.12ZO28IUS, Industrial production index, chemicals and products
FETC_PR-0.0793070.02843-2.79MGWHUUSX/PRTCUUS, motor gasoline price / propane price
FETC_E10.0215950.013901.55JAN = 1 if January, 0 otherwise
FETC_E20.0217760.016201.34FEB = 1 if February, 0 otherwise
FETC_E30.0578360.017303.34MAR = 1 if March, 0 otherwise
FETC_E40.0614870.018313.36APR = 1 if April, 0 otherwise
FETC_E50.0661230.019693.36MAY = 1 if May, 0 otherwise
FETC_E60.0851530.019874.28JUN = 1 if June, 0 otherwise
FETC_E70.0870470.019454.48JUL = 1 if July, 0 otherwise
FETC_E80.0605010.019143.16AUG = 1 if August, 0 otherwise
FETC_E90.0287430.018401.56SEP = 1 if September, 0 otherwise
FETC_E100.0110600.017110.65OCT = 1 if October, 0 otherwise
FETC_E110.0000671080.014330.00NOV = 1 if November, 0 otherwise
FETCPUS_L10.3756490.074375.051st-order autocorrelation correction parameter
Method of estimation: OLS with 1st-order autocorrelation correction
Estimation period: January 1984 through February 1998


Table 4. Petroleum Coke Demand, PCTCPUS (million barrels per day)
EquationDF ModelDF ErrorSSEMSE Root MSER-Square Adj R-SqDurbin-Watson
PCTCPUS131570.214380.0013660.036950.59630.56541.742
ParameterEstimateApprox. Std. Err.'T' RatioLabel
PCTC_B00.1618430.0151210.70Constant Coefficient
PCTC_T 0.000865920.0000578314.97TIME = 1 to n, where n = number of observation
PCTC_E10.001091460.013730.08JAN = 1 if January, 0 otherwise
PCTC_E2-0.005767240.01373-0.42FEB = 1 if February, 0 otherwise
PCTC_E30.001965310.013980.14MAR = 1 if March, 0 otherwise
PCTC_E4-0.0167470.01397-1.20APR = 1 if April, 0 otherwise
PCTC_E50.003935270.013970.28MAY = 1 if May, 0 otherwise
PCTC_E60.009519650.013970.68JUN = 1 if June, 0 otherwise
PCTC_E7-0.001984090.01397-0.14JUL = 1 if July, 0 otherwise
PCTC_E80.008569790.013970.61AUG = 1 if August, 0 otherwise
PCTC_E9-0.0115810.01397-0.83SEP = 1 if September, 0 otherwise
PCTC_E100.003596150.013970.26OCT = 1 if October, 0 otherwise
PCTC_E110.001276460.013970.09NOV = 1 if November, 0 otherwise
Method of estimation: OLS
Estimation period: January 1984 through February 1998


Table 5. Asphalt and Road Oil Demand, ARTCPUS (million barrels per day)
EquationDF ModelDF ErrorSSEMSE Root MSER-Square Adj R-SqDurbin-Watson
ARTCPUS161780.217020.0012190.034920.97440.97232.170
ParameterEstimateApprox. Std. Err.'T' RatioLabel
ARTC_B0-0.008670120.06003-0.14Constant Coefficient
ARTC_ZO0.1876690.102221.84ZOTOIUS, Industrial production index, total
ARTC_ZW-0.003578370.0013855-2.58ZWHDDUS/ZSAJQUS, heating degree-days deviation from normal, per day
ARTC_T 0.000211720.00024340.87TIME = 1 to n, where n = number of observation
ARTC_E1-0.0537760.01092-4.93JAN = 1 if January, 0 otherwise
ARTC_E2-0.0261170.01226-2.13FEB = 1 if February, 0 otherwise
ARTC_E30.0366590.012682.89MAR = 1 if March, 0 otherwise
ARTC_E40.1526730.0128011.93APR = 1 if April, 0 otherwise
ARTC_E50.2855830.0128122.29MAY = 1 if May, 0 otherwise
ARTC_E60.4320010.0128133.72JUN = 1 if June, 0 otherwise
ARTC_E70.4631330.0128136.16JUL = 1 if July, 0 otherwise
ARTC_E80.5114120.0127840.01AUG = 1 if August, 0 otherwise
ARTC_E90.4588790.0126936.15SEP = 1 if September, 0 otherwise
ARTC_E100.3726400.0123530.18OCT = 1 if October, 0 otherwise
ARTC_E110.1664730.0110215.11NOV = 1 if November, 0 otherwise
ARTCPUS_L10.2691580.072283.721st-order autocorrelation correction parameter
Method of estimation: OLS with 1st-order autocorrelation correction
Estimation period: January 1982 through February 1998


Table 6. Still Gas Demand, SGTCPUS (million barrels per day)
EquationDF ModelDF ErrorSSEMSE Root MSER-Square Adj R-SqDurbin-Watson
SGTCPUS161780.036840.0002070.014390.93590.93052.233
ParameterEstimateApprox. Std. Err.'T' RatioLabel
SGTC_B0-0.1596900.09437-1.69Constant Coefficient
SGTC_CO0.0372140.00413679.00CORIPUS, refinery inputs of crude oil
SGTC_MG0.5266530.153143.44MGYLD, refinery yield of motor gasoline
SGTC_D10.0620470.012325.04D86ON = 1 if January 1986 or later, 0 otherwise
SGTC_E1-0.002939380.0038919-0.76JAN = 1 if January, 0 otherwise
SGTC_E20.004629990.00526420.88FEB = 1 if February, 0 otherwise
SGTC_E30.002982660.00593450.50MAR = 1 if March, 0 otherwise
SGTC_E40.0139920.00613652.28APR = 1 if April, 0 otherwise
SGTC_E50.0171550.00657202.61MAY = 1 if May, 0 otherwise
SGTC_E60.0351190.00693915.06JUN = 1 if June, 0 otherwise
SGTC_E70.0373900.00680475.49JUL = 1 if July, 0 otherwise
SGTC_E80.0357170.00641825.56AUG = 1 if August, 0 otherwise
SGTC_E90.0206790.00591843.49SEP = 1 if September, 0 otherwise
SGTC_E10-0.005888130.0050412-1.17OCT = 1 if October, 0 otherwise
SGTC_E11-0.0102630.0036676-2.80NOV = 1 if November, 0 otherwise
SGTCPUS_L10.8743610.0404721.601st-order autocorrelation correction parameter
Method of estimation: OLS with 1st-order autocorrelation correction
Estimation period: January 1982 through February 1998


Table 7. Miscellaneous Petroleum Product Demand, MZTCPUS (million barrels per day)
EquationDF ModelDF ErrorSSEMSE Root MSER-Square Adj R-SqDurbin-Watson
MZTCPUS151550.149540.0009650.031060.77480.75441.850
ParameterEstimateApprox. Std. Err.'T' RatioLabel
MZTC_B00.2768210.036067.68Constant Coefficient
MZTC_ZO0.5649180.063208.94ZOMNIUS, Industrial production index, manufacturing
MZTC_ZW0.004147210.00137273.02ZWHDDUS/ZSAJQUS, heating degree-days deviation from normal, per day
MZTC_T -0.002314460.0001654-14.00TIME = 1 to n, where n = number of observation
MZTC_E10.0269190.011632.32JAN = 1 if January, 0 otherwise
MZTC_E20.0240060.011622.07FEB = 1 if February, 0 otherwise
MZTC_E30.004915280.011750.42MAR = 1 if March, 0 otherwise
MZTC_E4-0.0229420.01176-1.95APR = 1 if April, 0 otherwise
MZTC_E5-0.0263650.01177-2.24MAY = 1 if May, 0 otherwise
MZTC_E6-0.0434640.01176-3.70JUN = 1 if June, 0 otherwise
MZTC_E7-0.0547440.01177-4.65JUL = 1 if July, 0 otherwise
MZTC_E8-0.0336050.01176-2.86AUG = 1 if August, 0 otherwise
MZTC_E9-0.0393260.01177-3.34SEP = 1 if September, 0 otherwise
MZTC_E10-0.0237960.01177-2.02OCT = 1 if October, 0 otherwise
MZTC_E11-0.003119700.01185-0.26NOV = 1 if November, 0 otherwise
Method of estimation: OLS
Estimation period: January 1984 through February 1998


EIA Home Page

File last modified: June 6, 1998

Contact:
Tancred Lidderdale
Email: Tancred.Lidderdale@eia.doe.gov
Phone: (202) 586-7321
Fax: (202) 586-9753

This page's URL: http://www.eia.doe.gov/emeu/steo/pub/document/regrmi.html

If you are having technical problems with this site, please contact the EIA Webmaster at wmaster@eia.doe.gov.