Department of Labor Seal photos representing the workforce - digital imagery© copyright 2001 photodisc, inc.
Department of Labor Seal www.osha.gov  [skip navigational links] Search    Advanced Search | A-Z Index
eTools Home : Lockout/Tagout Standard | Preamble | Directive | Interps | Case Law | Viewing / Printing Inst. | Credits
lock Lockout/Tagout
LOTO HomeTutorialHot TopicsInteractive Case StudiesAbout This Tool
 
 Links to other
 Web sites with
 information on
 LOTO
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Tutorial

Full Employee Protection

What are the requirements for the use of tagout devices when lockout devices are capable of being used?
  • The employer demonstrates that the tagout will provide protection at least as effective as locks and will assure full employee protection
    [ 29 CFR 1910.147(c)(3)(i)].
How does an employer demonstrate that the protection achieved using the tagout program is equivalent to the level of safety obtained by using a lockout program?

The employer must comply with all tagout-related provisions and also use additional safety measures that provide a level of safety equivalent to that obtained by using lockout. This might include removing and isolating a circuit element, blocking a controlling switch, opening an extra disconnecting device, or removing a valve handle to reduce the potential for any inadvertent energization while the tags are attached [29 CFR 1910.147(c)(3)(ii)].

Go Togray rule
bullet Overview
bullet Scope and Application
bullet Purpose
bullet Definitions
bullet Energy Control Program
bullet Energy Control Procedures
   - Documentation
bullet Energy Control Procedures
   - Required Content
bullet Periodic Inspection
bullet Employee Training and
   Communication
bullet Additional Training 
   (Tagout System)
  
bullet Employee Retraining
bullet Lockout/Tagout
bullet New or Modified Equipment
bullet Full Employee Protection
bullet Materials and Hardware
bullet Application of Energy Control
bullet Release from Lockout/Tagout
bullet Testing of Machines
bullet Outside Personnel (Contractors)
bullet Group Lockout/Tagout
   Requirements
bullet Shift & Personnel Changes

gray rule
  LOTO Home | Tutorial | Hot Topics | Case Studies | About This Tool | Credits

eTools Home : Lockout/Tagout Standard | Preamble | Directive | Interps | Case Law | Viewing / Printing Inst. | Credits

 
Back to TopBack to Top www.osha.gov www.dol.gov

Contact Us | Freedom of Information Act | Customer Survey
Privacy and Security Statement | Disclaimers
Occupational Safety & Health Administration
200 Constitution Avenue, NW
Washington, DC 20210
Page last updated: 03/17/2008