Fuel | UO2 pellet |
Cladding | Zr-4 |
Enrichment | Initial: 1.87/2.41 % Reload: 3.97 % |
Pellet Height | 10 mm |
Pellet Diameter | 8.3 mm |
Clad Thickness | 0.641 mm |
Pin Height | 4663 mm |
Pin Outside Diameter | 9.8 mm |
Maximum Clad Temperature | 347 deg C |
Maximum Centerline Temperature | 1749 deg C |
Number of Rods per Assembly | 236 |
Fuel Rod Pitch | 1.286 cm |
Total Number of Assemblies | 217 |
Fuel Assembly Pitch | 20.78 cm |
Geometry | 16x16 |
Active Core Height | 3.81 m |
Active Core Diameter | 3.45 m |
Fuel Inventory | 89.5 tHM |
Average Core Power Density | 94.9 kWt/liter |
Peak Core Power Density | 251.0 kWt/liter |
Average Assembly Discharge Burnup | 34800 MWd/tU |
Axial Blankets | no |
Axially Zoned Fuel | no |
Axially Zoned Burnable Poisons | no |
Average Linear Fuel Rating | 18.40 kW/m |
Peak Linear Fuel Rating | 45.60 kW/m |
Control Rod Material | B4C/Ag/In/Cd |
Control Rod Drive Type | magnetic jack |
Number of Coarse Control Rods | 49 full |
Number of Fine Control Rods | 8 part |
Number of Safety Rods | 42 |
Number of Rods Containing Burnable Poison | 2752 |
Burnable Poison Material | B4C |
Other Control Systems | chemical shim/burnable poison |
Coolant Material | H2O |
Weight in Primary Circuit | 309 t |
Pressure | 158.2 kg/sq cm |
Core Inlet Temperature | 289 deg C |
Core Outlet Temperature | 321.6 deg C |
Number of Primary Pumps | 4 |
Total Mass Flow | 16818 t/h |
Number of Loops | 2 |
Steam Generator Model/Series | U-tube |
Steam Generator Tube Material | Inconel-600 |
Water Chemistry | Water Chemistry Coordinated Li Hydrogen Injection |
Number of Turbines 1 Turbine Speed 1800 rev/min Turbine Rating 1181 MWe Stop Valve Pressure 83.3 kg/sq cm Stop Valve Temperature 278 deg C
Vessel Material SA 533 B/SA 508 Vessel Shape cylinder Height 13.22 m Inner Diameter 4.81 m Wall Thickness 219 mm Clad Thickness 3.18 mm Containment Type prestressed concrete/reinforced concrete Containment Design Pressure 4.22 kg/sq cm
Cycle Length 24 months Normal Planned Outage Length 60 days Fuel Loading 49.5 tHM/y Operational Strategy Low Leakage Fuel Management
Amount of Spent Fuel in Fuel Pool 710 tHM Original Capacity of Pool 800 tHM Pool Capacity Increase Strategy 52.0 Total Increase in Pool Capacity Reracking Pin Configuration %