skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Mixed Oxide Fuel Facility
Licensing
Final Safety Evaluation
Construction Application
License Application
Hearing Process
Use of MOX Fuel in Power Reactors
Environmental Review
Quality Assurance Plan
Schedule
Public Involvement
Meetings
Contact Us
Related Information
Frequently Asked Questions
Mixed Oxide Fuel News
Standard Review Plan (NUREG-1718)
Backgrounder on Mixed Oxide Fuel

Construction Application

* NRC recommends that users view the document from ADAMS because the files are large. The reliability of downloading PDF files using modems cannot be assured.

The following links on this page are to documents in Adobe Portable Document Format (PDF). See our Plugins, Viewers, and Other Tools page for more information. For successful viewing of PDF documents on our site please be sure to use the latest version of Adobe.

Date Correspondence and Other Information
02/09/05 Duke Cogema Stone & Webster Mixed Oxide (MOX) Fuel Fabrication Facility Construction Authorization Request Page Changes
01/27/05 Duke Cogema Stone & Webster Mixed Oxide (MOX) Fuel Fabrication Facility Construction Authorization Request Page Changes
11/30/04 November 2004 Monthly Open Item Status Report
09/08/04 Request for Additional Information - Mixed Oxide Fuel Fabrication Facility Revised Construction Authorization Request
06/10/04 Change Pages for the Mixed Oxide Fuel Fabrication Facility Construction Authorization Request
08/22/03 Schedule for Issuing the Final Environmental Impact Statement and the Final Safety Evaluation Report for the Mixed Oxide Fuel Fabrication Facility
07/28/03 Mixed Oxide Fuel Fabrication Facility, Construction Authorization Request Change Pages & Revised Response to AP-03
04/10/03 Mixed Oxide (MOX) Fuel Fabrication Facility Construction Authorization Request Change Pages
04/01/03 Mixed Oxide (MOX) Fuel Fabrication Facility Construction Authorization Request Change Pages
02/18/03 Responses to Financial Qualification, Fire Safety, Chemical Safety, Aqueous Processing, Material Processing and Ventilation Open Items/Additional NRC Questions on Construction Authorization Request (CAR) Revision
10/31/02 Mixed Oxide Fuel Fabrication Facility Construction Authorization Request Revision Cover letter
Table of Contents through Figure 1.3.2-2
Section 1.3.3 through Table 1.3.5.1
Figures page: 1.3.5-51 through Figure 4-2
Section 5 through Table 5.5-27
Section 5.6 through Table 5A-14
Section 6 through Figure 7-25
Section 8 through Figure 10-11
Section 11.0 through Section 11.2.7
Figure 11.2-1 through Section 11.3.7
Table11.3-1 through Figure 11.4-14
Section 11.5 through Figure 11.9-33
Sections 11.10 through Section 15.8.9
03/08/02 DCS Construction Authorization Request (CAR), Clarification of Response to NRC Request for Additional Information
02/11/02 DCS CAR, Clarification of Response to NRC Request for Additional Information
01/07/02 DCS CAR, Clarification of Response to NRC Request for Additional Information
12/05/01 DCS CAR, Clarification of Response to NRC Request for Additional Information
11/02/01 DCS CAR, Clarification of Response to NRC Request for Additional Information
08/31/01 DCS CAR, Response to NRC Request for Additional Information Parts 1, 2, 3, and 4
08/31/01 DCS MOX Fuel Fabrication Facility Financial Information
08/10/01 DCS MOX Fuel Fabrication Facility Geotechnical Report
06/21/01 Mixed Oxide Fuel Fabrication Facility Construction Application Authorization Request - Request for Additional Information
03/28/01 MOX Construction Application Acceptance Letter
12/15/00 DCS Report on choice of MOX Fuel Fabrication Facility Process Glovebox Window Material


Privacy Policy | Site Disclaimer
Tuesday, February 13, 2007