../../exp_data/anatex results file: gbl2_001.txt Model variation: 001 Tracer number: 2 Station select: All ----------------------------------- 5482 Unaveraged data points for processing 0.00 Percentile input for zero measured 0.00 Zero measured concentration value 0.00 Correlation coefficient 0.09 T-value (|Slope|/Standard Error) 10.07 Average measured concentration 8.14 Average calculated concentration 0.81 Ratio of calculated/measured 76.38 Normalized mean square error 5482 Number of pairs analyzed -1.93 Average bias [(C-M)/N] -4.69 Lo 99 % confidence interval 0.83 Hi 99 % confidence interval -0.21 Fractional bias [2B/(C+M)] 29.19 Fig of merit in space (%) -30.34 Factor exceeding [N(C>M)/N-0.5] 3.92 Percent C/M ± 2 8.52 Percent C/M ± 5 16.11 Percent M>0 and C>0 25.99 Percent M>0 and C=0 57.90 Percent M=0 and C>0 37.60 Measured 95-th percentile 17.90 Measured 90-th percentile 3.60 Measured 75-th percentile 0.00 Measured 50-th percentile 30.60 Calculated 95-th percentile 10.30 Calculated 90-th percentile 0.50 Calculated 75-th percentile 0.00 Calculated 50-th percentile 56.00 Kolmogorov-Smirnov Parameter 1.63 Final rank (C,FB,FMS,KSP)