Diablo Canyon

The Diablo Canyon Nuclear Power Plant is located near San Luis Obispo, California. The operating license for Unit 1 was issued in November 1984 and it expires in September 2021. The operating license for Unit 2 was issued in August 1985 and expires in April 2025. Pacific Gas & Electric Company owns and operates the facility. In response to public interest, the NRC has established this web page to provide information on a variety of issues and topics.

For additional information, see our Reactor Oversight Process and plant performance Web page for Diablo Canyon 1 and Diablo Canyon 2, and our Facility Info Finder web pages for Diablo Canyon 1 and Diablo Canyon 2.

The following links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS). ADAMS documents are provided in either Adobe Portable Document Format (PDF) or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools. If you have problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Date Description
06/14/2005 Diablo Canyon 2004 Performance Assessment Meeting Summary
03/31/2005 Diablo Canyon Pilot Engineering Inspection Report
07/27/2004 Meeting Summary of July 27, 2004, Public Meeting
06/10/2004 End-of-Cycle Meeting Summary
06/09/2004 Transcript from the June 9, 2004, Town Hall Public Meeting with Diablo Canyon
06/09/2004 Town Hall Meeting Summary
06/09/2004 Agenda for June 9, 2004, Town Hall Meeting on San Luis Obispo, California
05/27/2004 Seismic Discussion with Pacific Gas and Electric
05/27/2004 Slides from May 27, 2004, Seismic Discussion with Pacific Gas and Electric
05/19/2004 Press Release of Two Public Meetings on Issues Regarding Diablo Canyon Power Plant
04/29/2004 Diablo Canyon Power Plant - NRC Intergrated Inspection Report 05000275/2004002 and 05000323/2004002
04/28/2004 Additional Responses to Questions and Issues of the Two February 4, 2004, Public Meetings Regarding Diablo Canyon Power Plant
02/04/2004 Transcript of February 4, 2004, Public Meeting with Pacific Gas and Electric
02-13-2004 Meeting Summary for the Two February 4, 2004, Public Meetings
01/30/2004 Diablo Canyon Power Plant - NRC Integrated Inspection Report 05000275/2003008 and 05000323/2003008
01-16-2004 Diablo Canyon Power Plant - Preliminary Result of NRC Event Followup for the December 22, 2003, San Simeon Earthquake