Project Number 212
Date of Summary December 31, 1993
Subject Deep Water Subsea Conceptual Studies, Phase 1
Performing Activity Texaco Inc.
Principal Investigator Mr. Curtis Burton
Contracting Agency Minerals Management Service
Estimated Completion Complete
Description To develop a generic cost effective subsea oil and gas production system design for deepwater operations in the Gulf of Mexico.
Progress Complete. A difficult economic environment and the technical uncertainties associated with Gulf of Mexico deepwater developments requires cost effective design. Texaco is developing a design for a generic system--a system with functional capabilities, production capacity, and economic restraints, that are adaptable to a range of operating conditions.
  This is a proprietary project, the reports may not be available for release, at this time.

Reports

AA Technical Report: CTR No. 205, Subsea Separation and Multiphase Pumping Technology Survey; INTEC Engineering, Inc., December 1992. (Proprietary Document, not for release outside MMS)
AB Technical Report: CTR No. 210, Transportation Options Study; INTEC Engineering, Inc., December 1992. (Proprietary Document, not for release outside MMS)
AC Technical Report: CTR No. 220, Pipeline Design and Installation; INTEC Engineering, Inc., December 1992. (Proprietary Document, not for release outside MMS)
AD Technical Reports: CTR No. 230, Control System; CTR No. 240, Chemical Injection System Study; CTR No. 250, Manifold/Template Strategy; INTEC Engineering, Inc., December 1992. (Proprietary Document, not for release outside MMS)
AE Technical Reports: CTR No. 260, ROV Intervention Capability Study; CTR No. 270, Safety Requirements; CTR No. 280, Diverless Installation, Inspection, Maintenance, and Repair Strategy; INTEC Engineering, Inc., December 1992. (Proprietary Document, not for release outside MMS)
AF Technical Report: CTR No. 300, Design Basis: Conceptual Design; INTEC Engineering, Inc., December 1992. (Proprietary Document, not for release outside MMS)
AG Technical Report: CTR No. 700, Final Report; INTEC Engineering, Inc., February 1993. (Proprietary Document, not for release outside MMS)

 