Project Number | 59 |
Date of Summary | March 31, 1985 |
Subject | Foundation Stability of Jack-up Platforms |
Performing Activity | Det Norske Veritas |
Principal Investigator | Dr. Tore J. Kvalstad |
Contracting Agency | Minerals Management Service |
Estimated Completion | Complete |
Description | This was a joint industry-wide cooperative research project; it was composed of 15 different organizations. The general purpose of the project was to evaluate the safety against foundation failure for jack-up platforms. The research is being conducted to gain a better insight into the soil-structure stability phenomenon and how it related to the overall response of the structure. Current design procedures will be analyzed to define critical parameters and proposed measures to reduce risk and improve reliability. |
Progress | Completed. The proprietary period for the report has ended. |
Reports | |
AA | Kvalstad, T. J., Behrens, C., Foundation Stability of Jack-up Platforms, AA1: Evaluation of Previous Experience, Det Norske Veritas, Oslo, Norway, February 16, 1983. (out of print) |
AB | Kvalstad, T. J., Kristiansen, L. A., Foundation Stability of Jack- up Platforms, PP2: Analysis Methods with Appendices, Det Norske Veritas, Oslo, Norway. September 20, 1983. (out of print) |
AC | Kristiansen, L. A., Kvalstad, T. J., Ronold, K. O., Foundation Stability of Jack-up Platforms, PP3: Parametric Study with Appendices, Det Norske Veritas, Oslo, Norway, December 31, 1983. (out of print) |
AD | Ronold, K. O., Foundation Stability on Jack-up Platforms, PP4: Project Synthesis, Det Norske Veritas, Oslo, Norway, Final Report (Draft Version), December 31, 1983. (out of print) |
AE (776 pages)
![]() |
Ronold, K. O., Foundation Stability on Jack-up-Platforms, Final Report, Det Norske Veritas, Oslo, Norway, January 16, 1985. |