Home > Site Help > Index A-Z > O Entries
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z
OIG Hotline, Frequently Asked Questions About the
Operating Reactors
Licensing
License Fees
License Renewal
License Transfers and Mergers
Power Uprates
Standard Technical Specifications
Operational Experience
Access Authorization Programs
Control Room Habitability
Davis-Besse Reactor Vessel Head Degradation
Fire Protection
Fitness-for-Duty Programs
Human Factors
Multiple/Repetitive Degraded Cornerstone Column
Operating Reactor Maintenance Effectiveness
PWR Sump Performance
Reactor Pressure Boundary Integrity Issues for Pressurized Water Reactors
Reactor Vessel Integrity
Steam Generator Action Plan
Oversight
Reactor Oversight Process (ROP)
About Reactor Oversight
Inspection Basics
Performance Assessment Basics
Enforcement Basics
Detailed ROP Description
ROP Program Documents
Background
Pilot Program
Initial Implementation Evaluation Panel
Recent Results
Inspection Findings Summary
Performance Indicator Summary
Action Matrix Summary
Inspection Reports
Assessment Reports and Inspection Plan
Industry Trends
Results of Licensee Survey
Regulations, Guidance, and Communications
Reactor Site Criteria (10 CFR Part 100)
Operator Licensing, Reactor
Contact Us About Operator Licensing
Generic Fundamentals Examinations
Boiling Water Reactor (BWR)
General Information
Pressurized Water Reactor (PWR)
Licensing Process
Operator Licensing Program Feedback
Oversight Program
Public Involvement
Operators' Licenses (10 CFR Part 55)
Related Documents and Other Resources
Organization Chart, NRC
Oversight Committees, NRC (See Congressional Affairs)
Privacy Policy | Site Disclaimer Tuesday, May 20, 2008