skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Mixed Oxide Fuel Facility
Licensing
Final Safety Evaluation
Construction Application
License Application
Hearing Process
Use of MOX Fuel in Power Reactors
Environmental Review
Quality Assurance Plan
Schedule
Public Involvement
Meetings
Contact Us
Related Information
Frequently Asked Questions
Mixed Oxide Fuel News
Standard Review Plan (NUREG-1718)
Backgrounder on Mixed Oxide Fuel

Hearing Process for the Mixed Oxide Fuel Fabrication Facility

For general information about the conduct of hearings, see our Adjudication (Hearings) pages. The hearing procedures in Subpart L of 10 CFR Part 2 are generally applicable to 10 CFR Part 70 licensees. However, hearings about the use of mixed oxide (MOX) fuel will have several specific requirements not covered in Subpart L: (1) a party to a hearing will identify its contentions with the Licensing Board , (2) limited discovery procedures will be available for the hearing, and (3) oral questioning of expert witnesses by the presiding officer on questions submitted by the parties involved may be used for the hearing.

On July 20, 2005, the Atomic Safety and Licensing Board issued an Order PDF Icon terminating the proceedings regarding the MOX fuel fabrication facility.

On March 15, 2007, the NRC published a notice of receipt of a License Application for the Possession and Use of Byproduct, Source, and Special Nuclear Materials for the Mixed Oxide Fuel Fabrication Facility Aiken, South Carolina, and Opportunity to Request a Hearing (72 FR 12204). The deadline for filing contentions was May 14, 2007.