Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

List of Reports Under Review as of April 28, 2008

On this page:

AREVA NP, INC. Reports

TaskID (TAC No.) Title Application Date Acceptance Letter Date Draft Safety Evaluation Issuance Target Date Remarks (if applicable)

MC9767

AREVA - BAW-10255 (P), Rev. 2, “Cycle-Specific DIVOM Methodology using the RAMONA5-FA Code”

1/30/06

No AL issued before start of review.

 11/09/07
Revised 12/03/07*

 

MC9766

AREVA - ANP-10262 (P), Rev. 0, “Enhanced Option III Long Term Stability Solution”

1/31/06

No AL issued before start of review.

 11/9/07
Revised 12/3/07*

 

*= actual draft SE issuance

(To top of page)

Boiling Water Reactor Owners' Group (BWROG) Reports

TaskID (TAC No.) Title Application Date Acceptance Letter Date Draft Safety Evaluation Issuance Target Date Remarks (if applicable)

MD1764

NEDO-33163, High Burnup BWR Fuel Rod Gap Release Fractions

3/30/06

8/4/06

TBD -review on hold

RAI response received 5/22/07.

MD2693

NEDC-33178P, Rev. 0, GE Method for Development of Reactor Pressure Vessel P/T Curves

7/28/06

11/9/06

4/30/08
Delayed - waiting on Supp. RAI response.

RAI response received 11/15/07.

MD2917

NEDO-33148, Rev. 2, Separation of LOOP from LBLOCA

8/25/06

3/1/07

TBD after May 2008 meeting.

RAI response received 9/28/07

MD5743

NEDE-33213P, ODYSY Application for Stability Licensing Calculations

6/5/07

1/31/08

05/30/08

RAI response received 3/28/08.

MD6697

NEDO-33349, Revision 1, BWR Application to RG 1.97, Revision 4

8/30/2007

3/26/08

4/30/09

 

MD8146

NEDC-33347P Revision 0, Containment Overpressure Credit for Net Positive Suction Head (NPSH)

2/15/08

4/23/08

6/12/09

 

*= actual draft SE issuance

(To top of page)

Electric Power Research Institute (EPRI)/Nuclear Energy Institute (NEI) Reports

TaskID (TAC No.) Title Application Date Acceptance Letter Date Draft Safety Evaluation Issuance Target Date Remarks (if applicable)

MC9663

NEI 94-01, Rev. 1, “Extension of ILRT Interval”

12/19/05

5/10/06

12/05/07
Revised 4/30/08*

RAI response submitted on 05/25/07

MD3236

EPRI TR-103237, Motor-Operated Valve Performance Prediction Methodology Software, Addenda 3, 4, 5, 6 and 7

1/6/06

11/14/06

3/14/08

A revised Target Date TBD

1st round of RAIs (on the TR) issued 4/23/07.
1st round of RAI responses submitted on 9/27/07.

MD4229

WCAP-16308-NP, 10 CFR 50.69 Pilot Program - Categorization Process – Wolf Creek Generating Station

9/25/06

4/3/07

6/26/08

Fee waiver acceptance issued 12/26/06
RAIs issued on 8/27/07.
RAI responses provided on 10/22/07.

MD5134

NEI WCAP-16294-NP, Rev. 0, “Risk-Informed Evaluation of Changes to Technical Specification Required Endstates For Westinghouse NSSS PWRs”

9/9/05

 

3/28/08

Fee waiver acceptance issued 1/10/03

MD6111

NEI 04-10, Rev. 1, Risk-Informed Technical Specification Initiative 5B Risk-Informed Method for Control of Surveillance Frequencies

4/19/07

 

4/14/08

Final SE issued on 9/19/07.

MD8005

MRP-169, Technical Bases for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in PWRs

1/9/08

3/25/08

8/22/08

RAI’s issued on 4/7/08 - ML080940280

RAI responses expected by 4/30/08

*= actual draft SE issuance

(To top of page)

GE Hitachi Nuclear Energy Americas LLC (GHNE)/Global Nuclear Fuel (GNF)

TaskID (TAC No.) Title Application Date Acceptance Letter Date Draft Safety Evaluation Issuance Target Date Remarks (if applicable)

MD2569

NEDE-32906P, Supp. 3, Migration to TRACG04/PANAC11 from TRACG02/PANAC10 for TRACG AOO and ATWS Overpressure Transients

5/26/06

11/7/06

TBD once RAI responses received.

RAI response delayed.  Partial responses - received on 12/20/07.
Remaining responses expected 4/30/08.

MD3119

NEDE-33284P, Rev. 0, Marathon 5S Control Rod Assembly

9/27/06

6/13/07

TBD, staff evaluating RAI responses and revised LTR.

LTR revision and RAI responses received 11/19/07.

MD4114

NEDC-33256P, NEDC-33257P, and NEDC-33258P, The PRIME Model for Analysis of Fuel Rod Thermal-Mechanical Performance

1/19/07

6/13/07

7/31/08

Draft Partial RAIs responses sent 4/1/08, remaining draft responses expected by 4/18/08.

MD6241

NEDO-32950, Revision 1, “Compilation of Improvements to GENE’s SAFER ECCS-LOCA Evaluation Model”

7/31/07

TBD

TBD

 

TBD

GESTAR II Amendment 31, Stability Analysis and SRLR Template Update

12/7/07

TBD

TBD

 

*= actual draft SE issuance

(To top of page)

HFC Controls Reports

TaskID (TAC No.) Title Application Date Acceptance Letter Date Draft Safety Evaluation Issuance Target Date Remarks (if applicable)

MD7682

HFC-6000, Safety Control System

 

 

 

 

*= actual draft SE issuance

(To top of page)

PWR Owners’ Group (formerly Westinghouse Owners’ Group - WOG) Reports

TaskID (TAC No.) Title Application Date Acceptance Letter Date Draft Safety Evaluation Issuance Target Date Remarks (if applicable)

MC9768

WCAP-16168-NP, Rev. 1, “Risk-Informed Extension of Reactor Vessel In-Service Inspection Interval”

1/26/06

9/19/06

3/6/08*

 

MD5891

WCAP-16793-NP, Rev. 0, Evaluation of Long-Term Cooling Considering Particulate, Fibrous, and Chemical Debris in Recirculating Fluid

6/4/07

9/7/07

3/7/08*

 

MD6206

WCAP-15830-P, Revision 1, “Staggered Integrated Engineered Safety Features and Loss of Offsite Power Testing at CE NSSS Plants”

7/31/07

11/15/07

5/31/08

 

MD7404

BAW-2374, Rev. 2, Risk Informed Assessment of OTSG loads due to breaks in RCS

1/4/07

--

--

--

MD8138

WCAP-16125-NP, Revision 1, "Justification for Risk-Informed Modifications to Selected Technical Specifications for Conditions Leading to Exigent Plant Shutdown"

1/7/08

TBD

TBD

 

*= actual draft SE issuance

(To top of page)

Sargent & Lundy Reports

TaskID (TAC No.) Title Application Date Acceptance Letter Date Draft Safety Evaluation Issuance Target Date Remarks (if applicable)

MD6887

SL-TR-1, Rev 20, “Nuclear QA Program”

9/21/07

TBD

6/9/08

 

*= actual draft SE issuance

(To top of page)

Westinghouse Vendor Reports

TaskID (TAC No.) Title Application Date Acceptance Letter Date Draft Safety Evaluation Issuance Target Date Remarks (if applicable)

MD2953

WCAP-16608, Westinghouse Containment Analysis Methodology

8/29/06

1/4/07

6/13/08

 

MD3959

WCAP-16081, Addendum 1, SVEA-96 Optima2 CPR Correlation (D4)

11/28/06

5/23/07

5/30/08

 

MD5258

WCAP-16747-P, Revision 0, POLCA-T: System Analysis Code with Three-Dimensional Core Model

4/26/07

9/10/07

6/30/08

 

MD6380

WCAP-16608-P, Addendum 1, Revision 0, “Appendix C – PWR LOCA Mass and Energy Release Input Calculational Methodology

7/31/07

10/26/07

6/6/08

Expect RAI response 4/25/08

MD6383

WCAP-16081-P, Addendum 2, Revision 0, “SVEA-96 OPTIMA2 CPR Correlation (D4):  Modified R-factors for part-length rods

7/31/07

11/15/2007

1/15/09

 

MD7230

WCAP-16766-P, “Westinghouse Next Generation Correlation (WNG-1) for Predicting Critical Heat Flux in Rod Bundles with Split Van Mixing Grids”

10/26/07

1/24/08

1/15/09

RAIs sent by tech branch 4/17/8

MD7734

WCAP-16865, BWR ECCS Methodology

12/20/07

9/30/08

3/31/09

 

MD7989

WCAP-16182, CR 99 Licensing Report

11/2/08*

2/15/08

1/16/09

AL in concurrence

MD8540

WCAP-16498, 17x17 NGF Ref Core Report

4/3/08

5/18/08

TBD

 

*= actual draft SE issuance

(To top of page)

Boiling Water Reactor Vessel and Internals Project (BWRVIP) Reports

TaskID (TAC No.) Title Application Date Acceptance Letter Date (Some reports are not applicable to this process) Draft Safety Evaluation Issuance Target Date Remarks (if applicable)

MA4468

BWRVIP-62, "Technical Basis for Inspection Relief for BWR Internal Components with Hydrogen Injection"

3/7/00

N/A

3/17/08

 

MB3948

BWRVIP-97, "Guidelines for Performing Weld Repairs to Irradiated BWR Internals"

11/29/01
ML013340594

N/A

8/31/08

 

MC2293

BWRVIP-03, Rev. 6, "BWR Vessel and Internals Project, Reactor Pressure Vessel and Internals Examination Guidelines"

1/6/04

N/A

5/30/08

 

MC7334

BWRVIP-139, “Steam Dryer Inspection and Flaw Evaluation Guidelines”

5/10/05

6/30/05

6/15/07 changed to 5/23/08
revised to
7/11/08

 

MC7448

BWRVIP-06-A, “Consideration of Loose Parts”

6/26/05

TBD

5/30/08 changed to 7/11/08

 

MD3618

BWRVIP-158, Flaw Proximity Rules for Assessment of BWR Internals

9/28/06

1/18/07 sent
2nd round 3/11/08

5/1/08

RAI dated 5/10/07

MD3762

BWRVIP Response to NRC SE of BWRVIP-84, Guidelines for Selection and Use of Materials for Repairs to BWR Internals

12/5/06

N/A`

8/30/08

 

MD4433

BWRVIP-76, BWR Core Shroud Inspection and Flaw Evaluation Guidelines for License Renewal Evaluation

7/27/06

N/A

8/30/08

 

MD6254

BWRVIP-59-A, Evaluation of Crack Growth in BWR Nickel Based Austenitic Alloys in RPV Internals

6/21/07

N/A

3/31/08

 

MD6255

BWRVIP-173, Evaluation of Chemistry Data for BWR Vessel Nozzle Forging Materials

7/19/07

10/12/07

2/20/09

 

MD7957

BWRVIP-183, Top Guide Grid Beam Inspection and Flaw Evaluation Guidelines

 

 

 

 