skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Reactor Pressure Boundary Integrity Issues for Pressurized Water Reactors
Overview
RPV Upper Head Issues
RPV Bottom Head Issues
Pressurizer Issues
Reactor Coolant System Weld Issues

RPV Bottom Head Issues

On April 12, 2003, during a visual examination of the instrument penetrations located at the reactor vessel lower head at South Texas Project Unit 1(STP-1), a small amount of white residue was discovered around the circumference of two instrument penetrations. Susbsequent analysis of this residue revealed the presence of boron and lithium, indicating that this residue had originated from the reactor coolant system. The licensee repaired the instrument penetrations and committed to implementing monitoring programs at STP-1. After reviewing the licensee’s activities, the NRC staff concluded that the licensee had taken all actions necessary to ensure a safe restart and operation of STP-1. The licensee has restarted STP-1.

As a result of the events at STP-1, the NRC staff issued Bulletin 2003-02, "Leakage from reactor pressure vessel lower head penetrations and reactor coolant pressure boundary integrity," on August 21, 2003.

 

 



Privacy Policy | Site Disclaimer
Tuesday, February 13, 2007