skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Operating Reactor Oversight
About Reactor Oversight
Inspection Basics
Performance Assessment Basics
Enforcement Basics
Detailed ROP Description
ROP Program Documents
Recent Results
Reactor Oversight Process (ROP)
Inspection Findings Summary
Performance Indicator Summary
Action Matrix Summary
Inspection Reports
Assessment Reports and Inspection Plan
Industry Trends
Background
Pilot Program
Initial Implementation Evaluation Panel

Reactor Performance Assessment Basics

On this page:

How does NRC assess the performance of a nuclear power plant?

The NRC uses inspection findings together with objective performance indicators (PI), which the licensees submit, to assess plant performance within a regulatory framework of seven cornerstones of safety: (1) initiating events, (2) mitigating systems, (3) integrity of barriers to release of radioactivity, (4) emergency preparedness, (5) occupational radiation safety, (6) public radiation safety, and (7) physical protection. Both PIs and inspection findings are evaluated and given a color designation based on their safety significance. Green inspection findings or PIs indicate a very low risk significance and therefore have little or no impact on safety. White, yellow, or red inspection findings or PIs each, respectively, represent a greater degree of safety significance.

To top of page

What is a performance indicator?

A performance indicator is a quantitative measure of a particular attribute of licensee performance that indicates how well a plant is performing when measured against established thresholds. Licensees submit this data quarterly, and the NRC regularly performs verification inspections of their submittals. As previously mentioned, the NRC uses its analysis of this data with its own inspection data for assessment of a plant's performance.

To top of page

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

How does NRC act on its assessment of a plant - what are the results?

Each region maintains an awareness of licensee performance at each site under their cognizance. On a quarterly basis, the NRC reviews PIs and inspection findings and determines the appropriate level of engagement as dictated by the Action Matrix.

More formal reviews are conducted at the mid-point and end of the 12-month assessment cycle. Each plant receives an assessment letter with an attached inspection plan as a result of these meetings.

Additionally, the regions maintain a continuous awareness of licensee performance. As discussed in the IMC 0305 "Operating Reactor Assessment Program," additional agency actions may be taken between quarterly reviews as declining performance information becomes available.

To top of page

Are these assessments available to the public?

The performance indicators, inspection findings, and the assessment letters describing plant performance are posted to the NRC Web site. For more information on assessment results, see Reactor Oversight Process.