La Salle 1

2Q/2008 Performance Indicators

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Unplanned scrams 0 0 0 0 0 0 0 0
Critical hours 2208.0 2209.0 2159.0 2184.0 2208.0 2209.0 1614.8 2184.0
                 
Indicator value 0.9 0.9 0 0 0 0 0 0


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Unplanned power changes 0 0 0 0 0 0 0 0
Critical hours 2208.0 2209.0 2159.0 2184.0 2208.0 2209.0 1614.8 2184.0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Scrams with complications   0 0 0 0 0 0 0
                 
                 
Indicator value         0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (BWR) 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Safety System Functional Failures 0 0 0 0 0 0 0 0
                 
Indicator value 1 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -1.50E-08 -1.50E-08 -1.50E-08 -3.20E-09 -3.50E-09 -9.20E-09 -9.10E-09 -3.10E-09
URI (ΔCDF) -1.00E-07 -9.90E-08 -9.50E-08 -2.50E-08 8.60E-08 2.30E-07 2.30E-07 1.00E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.15E-07 -1.14E-07 -1.10E-07 -2.82E-08 8.25E-08 2.21E-07 2.21E-07 9.69E-08

Licensee Comments:

2Q/08: Changed PRA Parameter(s). A new PRA model (2006C) was approved and implemented in the 1st Quarter of 2008. PRA coefficients were updated in CDE to reflect the new model, effective for the 2nd Quarter of 2008.






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 1.00E-07 1.00E-07 9.80E-08 2.80E-08 3.80E-08 6.60E-08 7.00E-08 3.30E-08
URI (ΔCDF) 4.90E-08 4.90E-08 5.30E-08 5.80E-08 7.70E-08 5.20E-08 5.00E-08 5.80E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 1.49E-07 1.49E-07 1.51E-07 8.60E-08 1.15E-07 1.18E-07 1.20E-07 9.10E-08

Licensee Comments:

2Q/08: Changed PRA Parameter(s). A new PRA model (2006C) was approved and implemented in the 1st Quarter of 2008. PRA coefficients were updated in CDE to reflect the new model, effective for the 2nd Quarter of 2008.






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -9.70E-09 -9.70E-09 -9.70E-09 -4.50E-09 -5.20E-09 -9.70E-09 -9.70E-09 -4.70E-09
URI (ΔCDF) -1.90E-08 -1.90E-08 -1.60E-08 -6.80E-09 -8.30E-09 -1.60E-08 -1.60E-08 -7.60E-09
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -2.87E-08 -2.87E-08 -2.57E-08 -1.13E-08 -1.35E-08 -2.57E-08 -2.57E-08 -1.23E-08

Licensee Comments:

2Q/08: Changed PRA Parameter(s). A new PRA model (2006C) was approved and implemented in the 1st Quarter of 2008. PRA coefficients were updated in CDE to reflect the new model, effective for the 2nd Quarter of 2008.






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -1.30E-07 -1.30E-07 -1.30E-07 -2.60E-09 -2.50E-09 -1.30E-07 -1.30E-07 -5.70E-08
URI (ΔCDF) -1.90E-07 -1.90E-07 -1.60E-07 -4.20E-09 -4.30E-09 -1.80E-07 -1.80E-07 -8.30E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -3.20E-07 -3.20E-07 -2.90E-07 -6.80E-09 -6.80E-09 -3.10E-07 -3.10E-07 -1.40E-07

Licensee Comments:

2Q/08: Changed PRA Parameter(s). A new PRA model (2006C) was approved and implemented in the 1st Quarter of 2008. PRA coefficients were updated in CDE to reflect the new model, effective for the 2nd Quarter of 2008.






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 4.50E-08 4.50E-08 4.10E-08 -3.50E-11 -3.50E-11 -1.70E-09 -1.70E-09 5.70E-08
URI (ΔCDF) -2.90E-07 -2.80E-07 -2.70E-07 -2.30E-08 -2.80E-08 -2.80E-07 -2.70E-07 -1.10E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -2.45E-07 -2.35E-07 -2.29E-07 -2.30E-08 -2.80E-08 -2.82E-07 -2.72E-07 -5.30E-08

Licensee Comments:

2Q/08: Changed PRA Parameter(s). A new PRA model (2006C) was approved and implemented in the 1st Quarter of 2008. PRA coefficients were updated in CDE to reflect the new model, effective for the 2nd Quarter of 2008.

2Q/06: An internal review identified a minor discrepancy in MSPI data submitted for April 2006. This discrepancy was corrected in the 2nd Quarter 2008 submittal, and did not result in a change in current or past indicator color. This occurrence has been entered into the plant's corrective action program.






Link to Notes

Reactor Coolant System Activity 7/06 8/06 9/06 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07
Maximum activity 0.000362 0.000345 0.000343 0.000348 0.000365 0.000381 0.000396 0.000402 0.000517 0.000593 0.000744 0.000973
Technical specification limit 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
                         
Indicator value 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.4 0.5
Reactor Coolant System Activity 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08
Maximum activity 0.000986 0.000958 0.000940 0.000769 0.000771 0.000574 0.000650 0.000605 0.000237 0.000270 0.000267 0.000260
Technical specification limit 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
                         
Indicator value 0.5 0.5 0.5 0.4 0.4 0.3 0.3 0.3 0.1 0.1 0.1 0.1

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 7/06 8/06 9/06 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07
Maximum leakage 3.600 3.600 3.900 4.200 3.800 4.100 3.900 4.120 4.400 4.500 4.500 4.700
Technical specification limit 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0
                         
Indicator value 14.4 14.4 15.6 16.8 15.2 16.4 15.6 16.5 17.6 18.0 18.0 18.8
Reactor Coolant System Leakage 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08
Maximum leakage 5.100 5.800 3.400 3.500 3.600 3.400 3.300 3.300 4.400 4.600 4.700 6.700
Technical specification limit 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0
                         
Indicator value 20.4 23.2 13.6 14.0 14.4 13.6 13.2 13.2 17.6 18.4 18.8 26.8

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Successful opportunities 37.0 35.0 26.0 44.0 50.0 50.0 7.0 49.0
Total opportunities 37.0 36.0 26.0 44.0 52.0 50.0 8.0 52.0
                 
Indicator value 97.9% 98.7% 98.8% 98.8% 98.4% 98.7% 98.3% 97.7%

Licensee Comments:

3Q/07: An internal audit identified that an opportunity had been counted in the August 2007 data that had not been properly evaluated. This decreased the number of total drill, exercise and event opportunities from 53 to 52. This error had no impact on the Performance Indicator color, and has been entered into the plant's corrective action program. A subsequent internal audit identified that an opportunity had been counted in the August 2007 data that should have been counted in the June 2007 data. This decreased the number of total drill, exercise and event opportunities in August 2007 from 52 to 36. This error had no impact on the Performance Indicator color, and has been entered into the plant's corrective action program.

2Q/07: An internal audit identified that an opportunity had been counted in the August 2007 data that should have been counted in the June 2007 data. This increased the number of total drill, exercise and event opportunities in June 2007 from 12 to 28. This error had no impact on the Performance Indicator color, and has been entered into the plant's corrective action program.

4Q/06: An internal audit identified that an opportunity had been counted in the October 2006 data that should have been counted in the September 2006 data. This decreased the number of total drill, exercise and event opportunities in October 2006 from 25 to 18. This error had no impact on the Performance Indicator color, and has been entered into the plant's corrective action program.

3Q/06: An internal audit identified that an opportunity had been counted in the October 2006 data that should have been counted in the September 2006 data. This increased the number of total drill, exercise and event opportunities in September 2006 from 0 to 7. This error had no impact on the Performance Indicator color, and has been entered into the plant's corrective action program.






Link to Notes

ERO Drill Participation 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Participating Key personnel 60.0 62.0 62.0 65.0 68.0 65.0 63.0 67.0
Total Key personnel 60.0 66.0 62.0 65.0 68.0 65.0 63.0 67.0
                 
Indicator value 100.0% 93.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

Licensee Comments: none






Link to Notes

Alert & Notification System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Successful siren-tests 3189 3131 3188 3188 3182 3191 3191 3196
Total sirens-tests 3200 3150 3197 3200 3200 3200 3200 3200
                 
Indicator value 99.7% 99.6% 99.6% 99.6% 99.5% 99.6% 99.6% 99.7%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Physical Protection information not publicly available.



 
 
 
 