skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Operating Reactor Oversight
About Reactor Oversight
Inspection Basics
Performance Assessment Basics
Enforcement Basics
Detailed ROP Description
ROP Program Documents
Recent Results
Reactor Oversight Process (ROP)
Inspection Findings Summary
Performance Indicator Summary
Action Matrix Summary
Inspection Reports
Assessment Reports and Inspection Plan
Industry Trends
Background
Pilot Program
Initial Implementation Evaluation Panel

Reactor Inspection Basics

On this page:

Who inspects a nuclear power plant?

The core of the NRC inspection program for nuclear power plants is carried out by resident (on-site) inspectors; at least two inspectors are assigned to each site.

Inspection specialists from the regional offices review plant security, emergency planning, radiation protection, environmental monitoring, periodic testing of plant equipment and systems, fire protection, construction activities, and other more specialized areas. During the course of a year, NRC specialists may conduct 10 to 25 routine inspections at each nuclear power plant, depending on the activities at the plants and problems that may occur. Team inspections regularly review fire protection, plant design, and corrective actions. Special team inspections may focus on a specific plant activity, such as maintenance or security, or a team may be sent to the plant to look at a specific operating problem or accident.

To top of page

How often does NRC inspect a nuclear power plant?

Continuously, resident inspectors monitor licensee activities in accordance with the baseline inspection program.

Periodically, regional inspection specialists conduct inspections of each plant in their region.

Semiannually, each region formulates a schedule of specialist inspections for assessing plant performance for the following year. They factor into their schedule plant performance for the previous year so that inspection resources are focused on plants with declining performance.

As needed, the regional inspectors conduct special (supplemental) inspections of those plants that exceeded established thresholds during routine inspections and, therefore, require heightened agency scrutiny.

To top of page

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

How does NRC record its findings from each inspection?

NRC documents the findings for an inspection in a report in accordance with IMC 0612. Routine inspection reports are typically issued every quarter. Other reports are issued within weeks of the inspection.

Regardless of a plant's performance, inspectors document their findings in a report for every plant in their region following their inspection and give that report to the licensee for information and action as appropriate.

To top of page

How does NRC use inspection findings in its oversight of nuclear power plants?

The significance of each inspection finding is established using the NRC's significance determination process. The number and significance of the findings are used collectively with performance indicators to determine the agency's response.