skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Reactor Operational Experience
Reactor Safety Focus Areas
Control Room Habitability
Davis-Besse Reactor Vessel Head Degradation
Fire Protection
Fitness-for-Duty Programs
Access Authorization Programs
Human Factors
Operating Reactor Maintenance Effectiveness
Multiple/Repetitive Degraded Cornerstone Column
PWR Sump Performance
Reactor Pressure Boundary Integrity Issues for Pressurized Water Reactors
Reactor Vessel Integrity
Steam Generator Action Plan
Groundwater Contamination (Tritium) at Nuclear Plants
Results and Databases
Initiating Events
System Studies
Component Performance
Common Cause Failures
Int'l Common Cause Failures
Fire Events
Loss of Offsite Power
Common Cause Failures DB
Reliability and Availability Sys
Contact Us
Related Links
Events Assessment
Industry Trends
Operating Experience Smart Sample (OpESS) Program
Generic Issues
Emergency Response

Steam Generator Action Plan

Tube integrity is integral to the safe operation of steam generators. Because of past problems with steam generator tubes affecting the operation of steam generators, the NRC continues activities related to improving tube integrity, as does the nuclear industry. During November 2000, after the Indian Point 2 steam generator leakage event, NRC developed a Steam Generator Action Plan to consolidate activities related to steam generators and to ensure that issues are appropriately tracked and dispositioned. In May 2001, this plan was revised to address a differing professional opinion on steam generator tube integrity. The action plan milestones are tracked and status is updated on a quarterly basis. This plan is just one facet of NRC's overall strategy to maintain safe operation of nuclear power plants, increase public confidence in agency regulatory actions, and improve effective and efficient use of NRC's resources.

The plan consolidates numerous NRC action items related to steam generators that originated from or are associated with the following activities:

  • Evaluation and implementation of recommendations from the NRC's Indian Point 2 (IP2) Lessons Learned Task Group report
  • Evaluation and implementation of recommendations from NRR staff review of the Office of the Inspector General report on the IP2 steam generator tube failure event
  • Resolution of an NRC differing professional opinion (DPO) on steam generator issues.
  • The NRC's review of the industry initiative related to steam generator tube integrity (i.e., NEI 97-06)
  • Resolution of Generic Safety Issue (GSI) 163 (Multiple Steam Generator Tube Leakage)

For more information about the steam generator action plan, see the following:

 



Privacy Policy | Site Disclaimer
Friday, June 01, 2007