skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Reactor Operational Experience
Reactor Safety Focus Areas
Control Room Habitability
Davis-Besse Reactor Vessel Head Degradation
Fire Protection
Fitness-for-Duty Programs
Access Authorization Programs
Human Factors
Operating Reactor Maintenance Effectiveness
Multiple/Repetitive Degraded Cornerstone Column
PWR Sump Performance
Reactor Pressure Boundary Integrity Issues for Pressurized Water Reactors
Reactor Vessel Integrity
Steam Generator Action Plan
Groundwater Contamination (Tritium) at Nuclear Plants
Results and Databases
Initiating Events
System Studies
Component Performance
Common Cause Failures
Int'l Common Cause Failures
Fire Events
Loss of Offsite Power
Common Cause Failures DB
Reliability and Availability Sys
Contact Us
Related Links
Events Assessment
Industry Trends
Operating Experience Smart Sample (OpESS) Program
Generic Issues
Emergency Response

Multiple/Repetitive Degraded Cornerstone Column

NRC uses its Reactor Oversight Process (ROP) to measure plant performance within the three broad areas of (1) reactor safety, (2) radiation safety, and (3) security. Within these areas, NRC looks at seven cornerstones: (1) Initiating Events, (2) Mitigating Systems, (3) Barrier Integrity, (4) Emergency Preparedness, (5) Occupational Radiation Safety, (6) Public Radiation Safety, and (7) Physical Protection.

If, from an assessment of inspection findings and performance indicators for a nuclear plant, NRC identifies repetitive degradation in a single cornerstone, NRC documents this plant degradation on an ROP matrix (see Inspection Manual Chapter 0305 PDF Icon, “Operating Reactor Assessment Program”) in the Multiple/Repetitive Degraded Cornerstone column. As a result of several failures associated in the cornerstone for Mitigating Systems at Point Beach Nuclear Power Station Units 1 and 2, NRC gave this plant such a rating and, therefore, will conduct a diagnostic inspection, following Inspection Procedure 95003 PDF Icon.



Privacy Policy | Site Disclaimer
Friday, June 01, 2007