Technical Basis for Regulatory Guidance for Assessing Exemption Requests from the Nuclear Power Plant Licensed Operator Staffing Requirements Specified in 10 CFR 50.54(m) (NUREG/CR-6838)

On this page:

Download complete document

The following links on this page are to documents in Adobe Portable Document Format (PDF). See our Plugins, Viewers, and Other Tools page for more information. For successful viewing of PDF documents on our site please be sure to use the latest version of Adobe.


Publication Information

Manuscript Completed: December 2003
Date Published: February 2004

Prepared by
C. Plott1, T. Engh1
V. Barnes2

Principal Contractor:
1Micro Analysis and Design
4949 Pearl East Circle
Suite 300
Boulder, CO 80301

Subcontractor:
2Performance, Safety, and Health Associates, Inc.
P.O. Box 30
Boalsburg, PA 16827

A. Szabo, NRC Project Manager
J. Persensky, Senior Technical Advisor

Prepared for
Division of Systems Analysis and Regulatory Effectiveness
Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001
NRC Job Code Y6630

Availability Notice


Abstract

This document provides the technical basis for methods that can be used for reviewing requests for exemptions from any of the requirements of Title 10, Part 50, of the Code of Federal Regulations (CFR) related to the number of licensed personnel needed to safely operate a nuclear power plant. The introduction of advanced reactor designs and the increased use of advanced automation in existing nuclear power plants may change the roles, responsibilities, composition, and size of the crews required to control plant operations. Current regulations regarding control room staffing, based upon the concept of operation for existing light-water reactors, may no longer apply. Therefore, applicants for an operating license for an advanced reactor, and current licensees who have implemented significant changes to existing control rooms, may wish to submit applications for exemptions from current staffing regulations. The US Nuclear Regulatory Commission (NRC) staff is responsible for reviewing the exemption requests and determining whether the staffing proposals provide adequate assurance that public health and safety are maintained to a level that is comparable to compliance with the current regulations.

This contractor report provides a discussion of the issues related to assessing requests for exemption from staffing requirements included in 10 CFR 50.54 for advanced reactor designs and control room upgrades. The report includes discussions of the potential impacts of these technological changes on staffing, relevant regulations and regulatory guidance, and available methods for conducting staffing assessments. The report concludes with a recommended approach for evaluating staffing-related exemption requests.



Privacy Policy | Site Disclaimer
Friday, February 23, 2007