skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Recommendations to the NRC on Acceptable Standard Format and Content for the Fundamental Nuclear Material Control (FNMC) Plan Required for Low-Enriched Uranium Enrichment Facilities (NUREG/CR-5734)

On this page:

Download complete document

The following links on this page are to documents in Adobe Portable Document Format (PDF). See our Plugins, Viewers, and Other Tools page for more information. For successful viewing of PDF documents on our site please be sure to use the latest version of Adobe.


Publication Information

Manuscript Completed: August 1991
Date Published: November 1991

Prepared by
B. W. Moran, W. L. Belew, Oak Ridge K-25 Site
G. A. Hammond, L. M. Brenner, 21st Century Industries, Inc.

Oak Ridge K-25 Site
Managed by Martin Marietta Energy Systems, Inc.

Oak Ridge K-25 Site
Oak Ridge, TN 37831

Subcontractor:
21st Century Industries, Inc.
P.O. Box 2636
Gaithersburg, MD 20886

Prepared for
Division of Safeguards and Transportation
Office of Nuclear Material Safety and Safeguards
U.S. Nuclear Regulatory Commission
Washington, DC 20555
NRC FIN L1300
Under Contract No. DE-AC05-840R21400

Availability Notice


Abstract

A new section, 10 CFR 74.33, has been added to the material control and accounting (MC&A) requirements of 10 CFR Part 74. This new section pertains to U.S. Nuclear Regulatory Commission (NRC) -licensed uranium enrichment facilities that are authorized to produce and to possess more than one effective kilogram of special nuclear material (SNM) of low strategic significance.

The new section is patterned after 10 CFR 74.31, which pertains to NRC licensees (other than production or utilization facilities licensed pursuant to 10 CFR Part 50 or Part 70 and waste disposal facilities) that arc authorized to possess and use more than one effective kilogram of unencapsulated SNM of low strategic significance. Because enrichment facilities have the potential capability of producing SNM of moderate strategic significance and also strategic SNM, certain performance objectives and MC&A system capabilities are required in 10 CFR 74.33 that are not contained in 10 CFR 74.31.

This document recommends to the NRC information that the licensee or applicant should provide in the fundamental nuclear material control (FNMC) plan. This document also describes methods that should be acceptable for compliance with the general performance objectives. While this document is intended to cover various uranium enrichment technologies, the primary focus at this time is gas centrifuge and gaseous diffusion.



Privacy Policy | Site Disclaimer
Friday, February 23, 2007