Skip to content
FHWA Safety: First graphic from left courtesy of (http://www.pedbikeimages.org/Dan Burden)

Barrier Terminals/Crash Cushions

Bridge Railings Longitudinal Barriers

List of Geometric and Roadside Design Acceptance Letters

Recently posted Acceptance Letters are marked with an asterisk (*).

Revised Monday, March 3, 2008

Code Date 350/Mash Manufacturer Device Description View PDF Text Version
 
CC-104* 2/8/2008 350 Energy Absorption, Inc  Vorteq Trailer Truck Mounted Attenuator  View PDF acceptance letter on Vorteq Trailer Truck Mounted Attenuator (PDF, 594 KB). (594 KB) View Text acceptance letter on Vorteq Trailer Truck Mounted Attenuator.
CC-96SKT 12/21/2007 350 Gregory Highway Products  GMS-WB 31”, mini spacer guardrail system  View PDF acceptance letter on GMS-WB 31”, mini spacer guardrail system (PDF, 144 KB). (144 KB) View Text acceptance letter on GMS-WB 31”, mini spacer guardrail system.
CC-99 6/14/2007 350 Impact Absorption  U-MAD trailer-mounted attenuator  View PDF acceptance letter on U-MAD trailer-mounted attenuator (PDF, 351 KB). (351 KB) View Text acceptance letter on U-MAD trailer-mounted attenuator.
CC-98 4/9/2007 350 Armorflex  Armorwire Terminal End for cable barriers  View PDF acceptance letter on Armorwire Terminal End for cable barriers (PDF, 1.56 MB). (1.56 MB) View Text acceptance letter on Armorwire Terminal End for cable barriers.
CC-97 3/8/2007 350 Plastic Safety Systems, Inc  “Crashgard” Sand Barrel Attenuator System  View PDF acceptance letter on “Crashgard” Sand Barrel Attenuator System (PDF, 3.11 MB). (3.11 MB) View Text acceptance letter on “Crashgard” Sand Barrel Attenuator System.
CC-95 2/26/2007 350 TrafFix Devices, Inc  The Compressor is a redirective, non-gating Crash Cushion  View PDF acceptance letter on The Compressor is a redirective, non-gating Crash Cushion (PDF, 1.60 MB). (1.60 MB) View Text acceptance letter on The Compressor is a redirective, non-gating Crash Cushion.
CC-94A 8/30/2007 350 Trinity Highway Products  modify ET-2000 Plus to 31” height  View PDF acceptance letter on modify ET-2000 Plus to 31” height (PDF, 582 KB). (582 KB) View Text acceptance letter on modify ET-2000 Plus to 31” height.
CC-94 9/2/2005 Trinity Industries  ET-Plus teminal for MGS barrier  View PDF acceptance letter on ET-Plus teminal for MGS barrier (PDF, 847 KB). (847 KB) View Text acceptance letter on ET-Plus teminal for MGS barrier.
CC-93A 12/28/2006 Safence  Wire Rope Terminal @ TL-3/TL-4  View PDF acceptance letter on Wire Rope Terminal @ TL-3/TL-4 (PDF, 140 KB). (140 KB) View Text acceptance letter on Wire Rope Terminal @ TL-3/TL-4.
CC-93 8/16/2005 Safence  TL-3 teminal for Safence cable barrier  View PDF acceptance letter on TL-3 teminal for Safence cable barrier (PDF, 297 KB). (297 KB) View Text acceptance letter on TL-3 teminal for Safence cable barrier.
CC-92A 9/10/2007 350 Gibraltar  Mod Gibraltar Cable Terminal w/driven post  View PDF acceptance letter on Mod Gibraltar Cable Terminal w/driven post (PDF, 356 KB). (356 KB) View Text acceptance letter on Mod Gibraltar Cable Terminal w/driven post.
CC-92 6/23/2005 Gibraltar  TL-3 Terminal for Gibraltar Cable Barrier  View PDF acceptance letter on TL-3 Terminal for Gibraltar Cable Barrier (PDF, 2.51 MB). (2.51 MB) View Text acceptance letter on TL-3 Terminal for Gibraltar Cable Barrier.
CC-91 6/9/2005 Armorflex Ltd.  Armorflex Ltd. X350 terminal @ TL-3  View PDF acceptance letter on Armorflex Ltd. X350 terminal @ TL-3 (PDF, 1.15 MB). (1.15 MB) View Text acceptance letter on Armorflex Ltd. X350 terminal @ TL-3.
CC-90A 9/18/2006 Safety By Design Co.  Optional TL-3 tests for trailer TMA  View PDF acceptance letter on Optional TL-3 tests for trailer TMA (PDF, 1.16 MB). (1.16 MB) View Text acceptance letter on Optional TL-3 tests for trailer TMA.
CC-90 4/15/2005 Safety By Design Company  Trailer TMA  View PDF acceptance letter on Trailer TMA (PDF, 694 KB). (694 KB) View Text acceptance letter on Trailer TMA.
CC-89 3/17/2005 Texas Transportation Institute  HEART crash cushion  View PDF acceptance letter on HEART crash cushion (PDF, 1945 KB). (1945 KB) View Text acceptance letter on HEART crash cushion.
CC-88 3/8/2005 Road Systems, Incorporated  SKT/FLEAT terminals for MGS guardrail  View PDF acceptance letter on  SKT/FLEAT terminals for MGS guardrail (PDF, 3.10 MB). (3.10 MB) View Text acceptance letter on  SKT/FLEAT terminals for MGS guardrail.
CC-87C 5/8/2007 350 Energy Absorption Systems, Inc.  QUEST 115 system  View PDF acceptance letter on QUEST 115 system (PDF, 249 KB). (249 KB) View Text acceptance letter on QUEST 115 system.
CC-87B 10/27/2006 350 Energy Absorption Systems, Inc.  QUEST 70/100 system  View PDF acceptance letter on QUEST 70/100 system (PDF, 1.32 MB). (1.32 MB) View Text acceptance letter on QUEST 70/100 system.
CC-26I/CC-87A 3/10/2006 EASI  Modified Anchor Design  View PDF acceptance letter on Modified Anchor Design (PDF, 148 KB). (148 KB) View Text acceptance letter on Modified Anchor Design.
CC-87 2/17/2005 Energy Absorption Systems, Inc.  QUEST crash cushion @ TL-3  View PDF acceptance letter on QUEST crash cushion @ TL-3 (PDF, 996KB). (996KB) View Text acceptance letter on QUEST crash cushion @ TL-3.
CC-86B 1/5/2007 BRIFEN USA, Inc  WRSF Modified (flared) TL-3/TL-4 terminal  View PDF acceptance letter on WRSF Modified (flared) TL-3/TL-4 terminal (PDF, 519 KB). (519 KB) View Text acceptance letter on WRSF Modified (flared) TL-3/TL-4 terminal.
CC-86A 8/10/2005 BRIFEN, USA, Inc  Modified terminal for TL-4 WRSF  View PDF acceptance letter on Modified terminal for TL-4 WRSF (PDF, 274 KB). (274 KB) View Text acceptance letter on Modified terminal for TL-4 WRSF.
CC-86 1/28/2004 Hill & Smith Limited  Terminal for BRIFEN cable barrier @ TL-3  View PDF acceptance letter on Terminal for BRIFEN cable barrier @ TL-3 (PDF, 1811 KB). (1811 KB) View Text acceptance letter on Terminal for BRIFEN cable barrier @ TL-3.
CC-85B 10/19/2005 SCI Products Incorporated  SCI1000GM performance evaluation  View PDF acceptance letter on SCI1000GM performance evaluation (PDF, 28.0 KB). (28.0 KB) View Text acceptance letter on SCI1000GM performance evaluation.
CC-85A 2/9/2005 SCI Products Incorporated  SCI-70GM attenuator @ TL-2  View PDF acceptance letter on SCI-70GM attenuator @ TL-2 (PDF, 1261 KB). (1261 KB) View Text acceptance letter on SCI-70GM attenuator @ TL-2.
CC-85 9/12/2003 Stabler Companies, Incorporated  Redirectional Crash Cushion @ TL-3  View PDF acceptance letter on Redirectional Crash Cushion @ TL-3 (PDF, 697kb). (697kb) View Text acceptance letter on Redirectional Crash Cushion @ TL-3.
CC-84 12/10/2003 Connecticut DOT  MELT W-beam guardrail terminal @ TL-2  View PDF acceptance letter on MELT W-beam guardrail terminal @ TL-2 (PDF, 9 KB). (9 KB) View Text acceptance letter on MELT W-beam guardrail terminal @ TL-2.
CC-83 7/11/2003 Energy Absorption Systems, Inc.  TL-1 Ls-PRO TMA  View PDF acceptance letter on TL-1 Ls-PRO TMA (PDF, 303 kb). (303 kb) View Text acceptance letter on TL-1 Ls-PRO TMA.
CC-82 9/5/2003 Energy Absorption Systems, Inc.  Redirecting Crash Cushion @ TL-3  View PDF acceptance letter on Redirecting Crash Cushion @ TL-3 (PDF, 472kb). (472kb) View Text acceptance letter on Redirecting Crash Cushion @ TL-3.
CC-81 8/30/2002 TRINITY Industries  CPSI side- impact enhancement for ET seriesl  View PDF acceptance letter on CPSI side- impact enhancement for ET seriesl (PDF, 180 Kb). (180 Kb) View Text acceptance letter on CPSI side- impact enhancement for ET seriesl.
CC-80 9/5/2002 Energy Absorption Systems, Inc.  REGENT-C W-beam guardrail terminal @ TL-3  View PDF acceptance letter on REGENT-C W-beam guardrail terminal @ TL-3 (PDF, 426 Kb). (426 Kb) View Text acceptance letter on REGENT-C W-beam guardrail terminal @ TL-3.
CC-79 10/11/2002 Safety By Design Co., Inc.  Trailer Attenuating Cushion (TAC) @ TL-3  View PDF acceptance letter on Trailer Attenuating Cushion (TAC) @ TL-3 (PDF, 2.08 Mb). (2.08 Mb) View Text acceptance letter on Trailer Attenuating Cushion (TAC) @ TL-3.
CC-78D 7/25/2007 350 Energy Absorption Systems, Inc.  Safe-Stop trailer TMA  View PDF acceptance letter on Safe-Stop trailer TMA (PDF, 733 KB). (733 KB) View Text acceptance letter on Safe-Stop trailer TMA.
CC-78C 7/15/2005 Energy Absorption Systems, Inc.  Safestop Trailer TMA  View PDF acceptance letter on Safestop Trailer TMA (PDF, 2.68 MB). (2.68 MB) View Text acceptance letter on Safestop Trailer TMA.
CC-78B 3/11/2005 Energy Absorption Systems, Inc.  Test 2-51 w/Safe Stop 180 in folded position  View PDF acceptance letter on Test 2-51 w/Safe Stop 180 in folded position (PDF, 138 KB). (138 KB) View Text acceptance letter on Test 2-51 w/Safe Stop 180 in folded position.
CC-78A 7/10/2003 Energy Absorption Systems, Inc.  Designs changes & optional TL-3 tests for Safe Stop 180  View PDF acceptance letter on Designs changes & optional TL-3 tests for Safe Stop 180 (PDF, 779 kb). (779 kb) View Text acceptance letter on Designs changes & optional TL-3 tests for Safe Stop 180.
CC-78 7/11/2002 Energy Absorption Systems, inc.  TL-3 TMA  View PDF acceptance letter on TL-3 TMA (PDF, 527 Kb). (527 Kb) View Text acceptance letter on TL-3 TMA.
CC-77 4/4/2002 Connecticut DOT  Non-proprietary steel cylinder crash cushion @ TL-3  View PDF acceptance letter on Non-proprietary steel cylinder crash   cushion @ TL-3 (PDF, 453 kb). (453 kb) View Text acceptance letter on Non-proprietary steel cylinder crash   cushion @ TL-3.
CC-76 8/29/2002 Texas Transportation Institute  3-strand cable guardrail terminal @ TL-3  View PDF acceptance letter on 3-strand cable guardrail terminal @ TL-3 (PDF, 1.7 Mb). (1.7 Mb) View Text acceptance letter on 3-strand cable guardrail terminal @ TL-3.
CC-75C 6/4/2004 Barrier Systems, Incorporated  Alternative TAUl-II backup/anchor design  View PDF acceptance letter on Alternative TAUl-II backup/anchor design (PDF, 469 KB). (469 KB) View Text acceptance letter on Alternative TAUl-II backup/anchor design.
CC-75B 12/9/2003 Barrier Systems, Inc.  TAU-II/TAU-II Wide system @ var. TL's  View PDF acceptance letter on TAU-II/TAU-II Wide system @ var. TL's (PDF, 3.34mb). (3.34mb) View Text acceptance letter on TAU-II/TAU-II Wide system @ var. TL's.
CC-75A 12/20/2002 Barrier Systems, Inc.  TAU-II anchorage options & 70 mph design  View PDF acceptance letter on TAU-II anchorage options
& 70 mph design (PDF, 396 Kb). (396 Kb) View Text acceptance letter on TAU-II anchorage options
& 70 mph design.
CC-75 9/14/2001 Barrier Systems, Inc.  TAU-II Crash Cushions @ TL-2 and TL-3  View PDF acceptance letter on TAU-II Crash Cushions @ TL-2 and TL-3 (PDF, 3.33 mb). (3.33 mb) View Text acceptance letter on TAU-II Crash Cushions @ TL-2 and TL-3.
CC-74 8/24/2001 Universal Safety Response, Inc.  Ground Retractable Traffic Barrier (GRAB) @ TL-2  View PDF acceptance letter on Ground Retractable Traffic Barrier (GRAB) @ TL-2 (PDF, 6.7 mb). (6.7 mb) View Text acceptance letter on Ground Retractable Traffic Barrier (GRAB) @ TL-2.
CC-73C 5/8/2006 Energy Absorption Systems, Inc.  TL-1 Wide REACT  View PDF acceptance letter on TL-1 Wide REACT (PDF, 305 KB). (305 KB) View Text acceptance letter on TL-1 Wide REACT.
CC-73B 5/26/2005 Energy Absorption Systems, Inc.  Wide REACT @TL-2  View PDF acceptance letter on Wide REACT @TL-2 (PDF, 516KB). (516KB) View Text acceptance letter on Wide REACT @TL-2.
CC-73A 4/30/2002 Energy Absorption Systems, Inc.  REACT 350 (96" and 120")@TL-3  View PDF acceptance letter on REACT 350 (96 (1.65 mb) View Text acceptance letter on REACT 350 (96
CC-73 5/4/2001 Barry D. Stephens, P.E., Energy Absorption Systems, Inc  REACT 350 (60") @ TL-3  View PDF acceptance letter on REACT 350 (60 (201 kb) No Text version is available
CC-72 12/18/2000 Rodney A. Boyd, Trinity Industries, Inc.  Straight Flare Slotted Rail Terminal (SRT) @ TL-3  View PDF acceptance letter on Straight Flare Slotted Rail Terminal (SRT) @ TL-3 (PDF, 354 kb). (354 kb) View Text acceptance letter on Straight Flare Slotted Rail Terminal (SRT) @ TL-3.
CC-71 12/6/2000 Barry Stephens, EASI  EASI-Cell Crash Cushion  View PDF acceptance letter on EASI-Cell Crash Cushion (PDF, 137 kb). (137 kb) View Text acceptance letter on EASI-Cell Crash Cushion.
CC-70 11/28/2000 Barry Stephens, EASI  WorkZoNet (Dragnet)  View PDF acceptance letter on WorkZoNet (Dragnet) (PDF, 437 kb). (437 kb) View Text acceptance letter on WorkZoNet (Dragnet).
CC-69D 7/16/2004 Road Systems, Inc.  Concrete-mounted BEAT SS-Crash Cushion  View PDF acceptance letter on Concrete-mounted BEAT SS-Crash Cushion (PDF, 443 KB). (443 KB) View Text acceptance letter on Concrete-mounted BEAT SS-Crash Cushion.
CC-69C 12/12/2003 Road Systems, Inc.  BEAT Bridge Pier Protection System @ TL-3  View PDF acceptance letter on BEAT Bridge Pier Protection System @ TL-3 (PDF, 547kb). (547kb) View Text acceptance letter on BEAT Bridge Pier Protection System @ TL-3.
CC-69B 2/22/2002 Road Systems, Inc.  Box Beam Crash Cushion @ TL-3  View PDF acceptance letter on Box Beam Crash Cushion @ TL-3 (PDF, 1.9 mb). (1.9 mb) View Text acceptance letter on Box Beam Crash Cushion @ TL-3.
CC-69A 2/1/2002 Road Systems, Inc.  Bursting Energy Absorbing Terminal (BEAT) for median box-beam guardrail @ TL-3  View PDF acceptance letter on Bursting Energy Absorbing Terminal (BEAT) for median box-beam guardrail @ TL-3 (PDF, 60 kb). (60 kb) View Text acceptance letter on Bursting Energy Absorbing Terminal (BEAT) for median box-beam guardrail @ TL-3.
CC-69 11/9/2000 Road Systems, Inc.  Bursting Energy Absorbing Terminal (BEAT) for roadside box beam guardrail @ TL-3  View PDF acceptance letter on Bursting Energy Absorbing Terminal (BEAT) for roadside box beam guardrail @ TL-3 (PDF, 116 kb). (116 kb) View Text acceptance letter on Bursting Energy Absorbing Terminal (BEAT) for roadside box beam guardrail @ TL-3.
CC-68 11/8/2000 MwRSF-U of NB  Trie-beam Bullnose attenuator @ TL-3  View PDF acceptance letter on Trie-beam Bullnose attenuator @ TL-3 (PDF, 226 kb). (226 kb) View Text acceptance letter on Trie-beam Bullnose attenuator @ TL-3.
CC-67 6/29/2000 RENCO, Inc.  RENCO RAM 100K Truck-Mounted Attenuator (TMA) @ TL-3  View PDF acceptance letter on RENCO RAM 100K Truck-Mounted Attenuator (TMA) @ TL-3 (PDF, 1.61mb). (1.61mb) No Text version is available
CC-66B 12/9/2003 Barrier Systems, Inc.  Modified ABSORB 350 w/ expanded application  View PDF acceptance letter on Modified ABSORB 350 w/ expanded application (PDF, 453kb). (453kb) View Text acceptance letter on Modified ABSORB 350 w/ expanded application.
CC-66A 6/27/2000 Barrier Systems, Inc.  ABSORB 350 crash cushion @ TL-2  View PDF acceptance letter on ABSORB 350 crash cushion @ TL-2 (PDF, 156 kb). (156 kb) No Text version is available
CC-66 5/11/2000 Barrier Systems Inc.  ABSORB 350 crash cushion @ TL-3  View PDF acceptance letter on ABSORB 350 crash cushion @ TL-3 (PDF, 6599 Kb). (6599 Kb) No Text version is available
CC-65D 3/3/2008 350 Traffix Devices  Scorpion TA Test Level 2  View PDF acceptance letter on Scorpion TA Test Level 2 (PDF, 385 KB). (385 KB) View Text acceptance letter on Scorpion TA Test Level 2.
CC-65C 3/3/2008 350 Traffix Devices  Scorpion TA - Infinite weight  View PDF acceptance letter on Scorpion TA - Infinite weight (PDF, 0.99 MB). (0.99 MB) View Text acceptance letter on Scorpion TA - Infinite weight.
CC-65B 3/16/2007 TrafFix Devices, Inc  Trailer TMA  View PDF acceptance letter on Trailer TMA (PDF, 1.41 MB). (1.41 MB) View Text acceptance letter on Trailer TMA.
CC-65A 12/8/2000 Dave Gertz, TrafFix Devices, Inc.  Design change (to steel diagrams and hinges)  View PDF acceptance letter on Design change (to steel diagrams and hinges) (PDF, 67 kb). (67 kb) View Text acceptance letter on Design change (to steel diagrams and hinges).
CC-65 7/14/2000 TrafFix Devices, Inc.  TMA (Scorpion A 10,000) & TMA (Scorpion C 10,000) @ TL-2 & TL-3  View PDF acceptance letter on TMA (Scorpion A 10,000) & TMA (Scorpion C 10,000) @ TL-2 & TL-3 (PDF, 6.02 mb). (6.02 mb) No Text version is available
CC-64G 5/30/2006 Impact Absortion, Inc  UMAD TMA modification  View PDF acceptance letter on UMAD TMA modification (PDF, 36 KB). (36 KB) View Text acceptance letter on UMAD TMA modification.
CC-64F 10/20/2005 Albert W. Unrath, Inc.  Supplemental tests for TL-2 U-MAD  View PDF acceptance letter on Supplemental tests for TL-2 U-MAD (PDF, 40.0 KB). (40.0 KB) View Text acceptance letter on Supplemental tests for TL-2 U-MAD.
CC-64E 12/21/2004 ALBERT W. UNRATH, INC  Modified U-MAD 70K TMA @TL-2  View PDF acceptance letter on Modified U-MAD 70K TMA @TL-2 (PDF, 175 KB). (175 KB) View Text acceptance letter on Modified U-MAD 70K TMA @TL-2.
CC-64D 7/28/2003 Albert W. Unrath, Inc.  Optional TL-3 tests for the U-MAD 100K TMA  View PDF acceptance letter on Optional TL-3 tests for the U-MAD 100K TMA (PDF, 44 kb). (44 kb) View Text acceptance letter on Optional TL-3 tests for the U-MAD 100K TMA.
CC-64C 3/11/2003 ALBERT W. UNRATH, INC.  U-MAD 50K TMA @TL-1  View PDF acceptance letter on U-MAD 50K TMA @TL-1 (PDF, 66 Kb). (66 Kb) View Text acceptance letter on U-MAD 50K TMA @TL-1.
CC-64B 2/1/2002 Albert W. Unrath, Inc.  U-MAD 70K TMA @ TL-2  View PDF acceptance letter on U-MAD 70K TMA @ TL-2 (PDF, 48 Kb). (48 Kb) View Text acceptance letter on U-MAD 70K TMA @ TL-2.
CC-64A 7/18/2000 Albert Unrath Inc.  Clarification of acceptance conditions @ TL-3  View PDF acceptance letter on Clarification of acceptance conditions @ TL-3 (PDF, 16.0 kb). (16.0 kb) No Text version is available
CC-64 3/30/2000 Albert Unrath Inc.  U-MAD 100K Truck Mounted Attenuator @ TL-3  View PDF acceptance letter on U-MAD 100K Truck Mounted Attenuator @ TL-3 (PDF, 1131 kb). (1131 kb) No Text version is available
CC-63 2/14/2000 Dwight Horne, Director, FHWA Office of Highway Safety Infrastructure  Acceptance of New York 3-Strand Cable Terminal @ TL-3  View PDF acceptance letter on Acceptance of New York 3-Strand Cable Terminal @ TL-3 (PDF, 1049 kb). (1049 kb) No Text version is available
CC-62 12/21/1999 Dale Wilken, Eastern Resource Center  Vermont Low-Speed W-beam Guardrail Terminal (G1-d) @ TL-2  View PDF acceptance letter on Vermont Low-Speed W-beam Guardrail Terminal (G1-d) @ TL-2 (PDF, 336 kb). (336 kb) No Text version is available
CC-61C 4/4/2004 Midwest Roadside Safety Facility  Single-bolt post for FLEAT/SKT terminals  View PDF acceptance letter on Single-bolt post for FLEAT/SKT terminals (PDF, 513 KB). (513 KB) View Text acceptance letter on Single-bolt post for FLEAT/SKT terminals.
CC-61B 4/5/2004 Nebraska Dept. of Roads  2-bolt breakaway post design for SKT-350 and FLEAT  View PDF acceptance letter on 2-bolt breakaway post design for SKT-350 and FLEAT (PDF, 187 KB). (187 KB) View Text acceptance letter on 2-bolt breakaway post design for SKT-350 and FLEAT.
CC-61A 10/30/2002 Midwest Roadside Safety Facility  Conditional acceptance for bolted-steel posts for SKT-350  View PDF acceptance letter on Conditional acceptance for bolted-steel posts for SKT-350 (PDF, 300 Kb). (300 Kb) View Text acceptance letter on Conditional acceptance for bolted-steel posts for SKT-350.
CC-61 8/27/1999 Road Systems, Inc.  Breakaway Steel Posts for SKT-350 and FLEAT Terminals  View PDF acceptance letter on Breakaway Steel Posts for SKT-350 and FLEAT Terminals (PDF, 146 kb). (146 kb) No Text version is available
CC-60 8/19/1999 King Mak, TTI  Wyoming Box-Beam End Terminal (WYBET-350) @ TL-3  View PDF acceptance letter on Wyoming Box-Beam End Terminal (WYBET-350) @ TL-3 (PDF, 963 kb). (963 kb) No Text version is available
CC-60A 11/12/1999 King Mak, TTI  WYBET Material Specifications  View PDF acceptance letter on WYBET Material Specifications (PDF, 37 kb). (37 kb) No Text version is available
CC-59B 6/9/2006 Energy Absorption Systems, Incorporated  "Tailgate" mount for SafeStop TMA  View PDF acceptance letter on (702 KB) View Text acceptance letter on
CC-59A 3/11/2005 Energy Absorption Systems, Inc.  Test 3-52 on modified Safe Stop  View PDF acceptance letter on Test 3-52 on modified Safe Stop (PDF, 226 KB). (226 KB) View Text acceptance letter on Test 3-52 on modified Safe Stop.
CC-59 4/2/1999 J.M.Essex, EASI  SAFE STOP Truck Mounted Attenuator (TMA) @ TL-3  View PDF acceptance letter on SAFE STOP Truck Mounted Attenuator (TMA) @ TL-3 (PDF, 6 kb). (6 kb) No Text version is available
CC-58 3/26/1999 Connecticut DOT  Narrow Connecticut Impact Attenuator (NCIAS) @ TL-3  View PDF acceptance letter on Narrow Connecticut Impact Attenuator (NCIAS) @ TL-3 (PDF, 590 kb). (590 kb) No Text version is available
CC-57B 7/25/2007 350 Energy Absorption Systems  QUADGUARD Elite system 8 bays  View PDF acceptance letter on QUADGUARD Elite system 8 bays (PDF, 820 KB). (820 KB) View Text acceptance letter on QUADGUARD Elite system 8 bays.
CC-57A 6/17/1999 J.M. Essex,EASI  7-bay QuadGuard Elite at test level 2 @ TL-2  View PDF acceptance letter on 7-bay QuadGuard Elite at test level 2  @ TL-2 (PDF, 350 kb). (350 kb) No Text version is available
CC-57 12/30/1998 J.M.Essex, EASI  QuadGuard Elite (various widths) @ TL-3  View PDF acceptance letter on QuadGuard Elite (various widths) @ TL-3 (PDF, 6 kb). (6 kb) No Text version is available
CC-56A 4/2/1999 Darryl Durgin, MnDOT  Eccentric Loader Terminal (ELT) @ TL-3  View PDF acceptance letter on Eccentric Loader Terminal (ELT) @ TL-3 (PDF, 16 kb). (16 kb) No Text version is available
CC-56 12/24/1998 Minnesota DOT  Eccentric Loader Terminal (ELT) @ TL-3  View PDF acceptance letter on Eccentric Loader Terminal (ELT) @ TL-3 (PDF, 415 kb). (415 kb) No Text version is available
CC-55 11/16/1998 B&B Electromatic  VT6802 Traffic Gate @ TL-2  View PDF acceptance letter on VT6802 Traffic Gate @ TL-2 (PDF, 382 kb). (382 kb) No Text version is available
CC-54H 6/9/2005 Trinity Industries, Inc.  TL-3 crash cushion w/ add'l capacity (FasTRACC)  View PDF acceptance letter on TL-3 crash cushion w/ add'l capacity (FasTRACC) (PDF, 1.71 MB). (1.71 MB) View Text acceptance letter on TL-3 crash cushion w/ add'l capacity (FasTRACC).
CC-54G 3/9/2005 Trinity Industries  Redesigned TRACC Attenuators  View PDF acceptance letter on Redesigned TRACC Attenuators (PDF, 36 KB). (36 KB) View Text acceptance letter on Redesigned TRACC Attenuators.
CC-54F 1/13/2004 Trinity Industries  Modified TRACC attenuators @ TL2 and TL3  View PDF acceptance letter on Modified TRACC attenuators @ TL2 and TL3 (PDF, 859 KB). (859 KB) View Text acceptance letter on Modified TRACC attenuators @ TL2 and TL3.
CC-54E 3/11/2003 Trinity Industries  Modular Base asslembly for TRACC  View PDF acceptance letter on Modular Base asslembly for TRACC (PDF, 235 Kb). (235 Kb) View Text acceptance letter on Modular Base asslembly for TRACC.
CC-54D 9/5/2002 Trinity Highway Safety Products Division  Wide-TRACC @ TL-3  View PDF acceptance letter on Wide-TRACC @ TL-3 (PDF, 451 Kb). (451 Kb) View Text acceptance letter on Wide-TRACC @ TL-3.
CC-54C 7/3/2002 Trinity Industries, Inc.  TRACC Transition Designs  View PDF acceptance letter on TRACC Transition Designs (PDF, 125 Kb). (125 Kb) View Text acceptance letter on TRACC Transition Designs.
CC-54B 4/10/2001 Rodney A. Boyd, Trinity Industries, Inc.  Trinity Attenuating Crash Cushion (TRACC) @TL-3  View PDF acceptance letter on Trinity Attenuating Crash Cushion (TRACC) @TL-3 (PDF, 6 kb). (6 kb) No Text version is available
CC-54A 9/8/2000 Rodney Boyd, Trinity  Test Level 2 (TL-2) TRACC  View PDF acceptance letter on Test Level 2 (TL-2) TRACC (PDF, 50 kb). (50 kb) View Text acceptance letter on Test Level 2 (TL-2) TRACC.
CC-54 11/13/1998 Don Johnson, Syro,Inc  Trinity Attenuating Crash Cushion (TRACC) @ TL-3  View PDF acceptance letter on Trinity Attenuating Crash Cushion (TRACC) @ TL-3 (PDF, 1078 kb). (1078 kb) No Text version is available
CC-53A 4/27/2001 FHWA Regional Admin  Buried-in-backslope w-beam terminal (1:4 foreslope) @ TL-3  View PDF acceptance letter on Buried-in-backslope w-beam terminal (1:4 foreslope) @ TL-3 (PDF, 8 kb). (8 kb) No Text version is available
CC-53 7/10/1998 FHWA Regional Admin  Buried-in-backslope W-beam terminal (3 variations) @ TL-3  View PDF acceptance letter on Buried-in-backslope W-beam terminal (3 variations) @ TL-3 (PDF, 530 kb). (530 kb) No Text version is available
CC-52B 4/12/2002 TrafFix Devices, Inc.  Specification change to two-piece barrels  View PDF acceptance letter on Specification change to  two-piece barrels (PDF, 2.12 mb). (2.12 mb) View Text acceptance letter on Specification change to  two-piece barrels.
CC-52A 11/3/1999 Dave Gertz, Traffix Devices, Inc.  Modification in Orientation of 700-lb Module  View PDF acceptance letter on Modification in Orientation of 700-lb Module (PDF, 148 kb). (148 kb) View Text acceptance letter on Modification in Orientation of 700-lb Module.
CC-52 7/10/1998 Dave Gertz  TrafFix Devices Sand Barrel System @ TL-3  View PDF acceptance letter on TrafFix Devices Sand Barrel System @ TL-3 (PDF, 1109 kb). (1109 kb) No Text version is available
CC-51A 6/4/1999 King Mak, TTI  Improved Slotted Rail Terminal (ISRT-4) @ TL-3  View PDF acceptance letter on Improved Slotted Rail Terminal (ISRT-4) @ TL-3 (PDF, 330 kb). (330 kb) No Text version is available
CC-51 6/18/1998 King Mak, TTI  Improved Slotted Rail Terminal (ISRT-3) @ TL-3  View PDF acceptance letter on Improved Slotted Rail Terminal (ISRT-3) @ TL-3 (PDF, 307 kb). (307 kb) No Text version is available
CC-50B 12/9/1999 Energy Absorption Systems, Inc.  Wide-REACT Acceptance downgraded to CONDITIONAL @ TL-3  View PDF acceptance letter on Wide-REACT Acceptance downgraded to CONDITIONAL @ TL-3 (PDF, 16 kb). (16 kb) No Text version is available
CC-50A 6/9/1999 Dean Alberson  Name change to Medium REACT w/2743 or 3048mm widths) @ TL-3  View PDF acceptance letter on Name change to Medium REACT w/2743 or 3048mm widths) @ TL-3 (PDF, 82 kb). (82 kb) No Text version is available
CC-50 6/16/1998 John Carney  Wide REACT @ TL-3  View PDF acceptance letter on Wide REACT @ TL-3 (PDF, 562 kb). (562 kb) No Text version is available
CC-49 6/17/1998 J.M.Essex, EASI  QuadTrend @ TL-3  View PDF acceptance letter on QuadTrend @ TL-3 (PDF, 631 kb). (631 kb) No Text version is available
CC-48 5/28/1998 J.M.Essex, EASI  REdirecting Gating ENd Terminal (REGENT) @ TL-3  View PDF acceptance letter on REdirecting Gating ENd Terminal (REGENT) @ TL-3 (PDF, 1309kb). (1309kb) No Text version is available
CC-47B 2/6/2004 Energy Absorption Systems Inc.  TRITON Concrete End Treatment System (TCETS) at TL2 & TL-3  View PDF acceptance letter on TRITON Concrete End Treatment System (TCETS) at TL2 & TL-3 (PDF, 786 KB). (786 KB) View Text acceptance letter on TRITON Concrete End Treatment System (TCETS) at TL2 & TL-3.
CC-47A 4/21/2003 Energy Absorption Systems Inc.  TRITON End Treatment System at TL-3 (unique application)  View PDF acceptance letter on TRITON End Treatment System at TL-3 (unique application) (PDF, 11.3 KB). (11.3 KB) View Text acceptance letter on TRITON End Treatment System at TL-3 (unique application).
CC-47 5/8/1998 Energy Absorption Systems Inc.  TRITON End Treatment for TRITON Barrier at TL-3 (See B-26 for TL-2)  View PDF acceptance letter on TRITON End Treatment for TRITON Barrier at TL-3 (See B-26 for TL-2) (PDF, 127kb). (127kb) No Text version is available
CC-46D 8/24/2001 Road Systems, Inc  FLEAT terminal for median w-beam  View PDF acceptance letter on FLEAT terminal for median w-beam (PDF, 3.8 mb). (3.8 mb) View Text acceptance letter on FLEAT terminal for median w-beam.
CC-46C 6/1/2001 Kaddo Kothmann, Road Systems Inc.  FLEAT W-beam guardrail terminal @ TL-3  View PDF acceptance letter on FLEAT W-beam guardrail terminal @ TL-3 (PDF, 4 kb). (4 kb) No Text version is available
CC-46B 5/21/1999 Road Systems, Inc.  Modified FLEAT - test level 2 (TL-2) design  View PDF acceptance letter on Modified FLEAT - test level 2 (TL-2) design (PDF, 153 kb). (153 kb) No Text version is available
CC-46A 8/27/1998 Road Systems, Inc.  FLEAT w/ variable offset (762 mm to 1219 mm) @ TL-3  View PDF acceptance letter on FLEAT w/ variable offset (762 mm to 1219 mm) @ TL-3 (PDF, 274 kb). (274 kb) No Text version is available
CC-46 4/2/1998 Road Systems, Inc.  FLared Energy Absorbing Terminal (FLEAT-350) @ TL-3  View PDF acceptance letter on FLared Energy Absorbing Terminal (FLEAT-350) @ TL-3 (PDF, 643 kb). (643 kb) No Text version is available
CC-45 3/19/1998 Energy Absorption  QuadGuard 69/90-LMC @ TL-3  View PDF acceptance letter on QuadGuard 69/90-LMC @ TL-3 (PDF, 361 kb). (361 kb) No Text version is available
CC-44 3/6/1998 Trinity/Syro  Sloped end terminal for Low-Profile Barrier @ TL-2  View PDF acceptance letter on Sloped end terminal for Low-Profile Barrier @ TL-2 (PDF, 516kb). (516kb) No Text version is available
CC-43 12/1/1997 Energy Absorption  QuadGuard-Low Maintenance Cartridge (LMC) @ TL-3  View PDF acceptance letter on QuadGuard-Low Maintenance Cartridge (LMC) @ TL-3 (PDF, 302 kb). (302 kb) No Text version is available
CC-42A 12/10/2003 Energy Absorption Systems, Inc.  QuadGuard w/ 10-degree side-panel flare  View PDF acceptance letter on QuadGuard w/ 10-degree side-panel flare (PDF, 352kb). (352kb) View Text acceptance letter on QuadGuard w/ 10-degree side-panel flare.
CC-42 7/16/1997 Energy Absorption  QUADGUARD-WIDE system @ TL-3  View PDF acceptance letter on QUADGUARD-WIDE system @ TL-3 (PDF, 1.13 MB). (1.13 MB) View Text acceptance letter on QUADGUARD-WIDE system @ TL-3.
CC-41 6/19/1997 Energy Absorption  Brakemaster terminal/crash cushion @ TL-3  View PDF acceptance letter on Brakemaster terminal/crash cushion @ TL-3 (PDF, 274 kb). (274 kb) No Text version is available
CC-40B 7/14/2004 Road Systems, Inc.  SKT-LT @ TL-3  View PDF acceptance letter on SKT-LT @ TL-3 (PDF, 14.3 KB). (14.3 KB) View Text acceptance letter on SKT-LT @ TL-3.
CC-40A 2/4/2000 Dean Sicking, Midwest Roadside Safety Facility  Modified SKT-350 @ TL-2  View PDF acceptance letter on Modified SKT-350 @ TL-2 (PDF, 198 kb). (198 kb) View Text acceptance letter on Modified SKT-350 @ TL-2.
CC-40 4/2/1997 Road Systems, Inc.  Sequential Kinking Terminal (SKT-350) @ TL-3  View PDF acceptance letter on Sequential Kinking Terminal (SKT-350) @ TL-3 (PDF, 492 kb). (492 kb) No Text version is available
CC-39 4/24/1997 Energy Absorption  ALPHA 100K TMA @ TL-3  View PDF acceptance letter on ALPHA 100K TMA @ TL-3 (PDF, 477 kb). (477 kb) No Text version is available
CC-38 3/3/1997 Trinity/Syro  ADIEM @ TL-3  View PDF acceptance letter on ADIEM @ TL-3 (PDF, 11 kb). (11 kb) No Text version is available
CC-37C 4/1/1997   Design modification  View PDF acceptance letter on Design modification (PDF, 250kb). (250kb) No Text version is available
CC-37B 2/19/1997 (Pfeifer)  Design modification  View PDF acceptance letter on Design modification (PDF, 109kb). (109kb) No Text version is available
CC-37A 2/19/1997 (Sicking)  Design modification  View PDF acceptance letter on Design modification (PDF, 128kb). (128kb) No Text version is available
CC-37 11/20/1996 Univ. of Nebraska  BEST-350 @ TL-3  View PDF acceptance letter on BEST-350 @ TL-3 (PDF, 747kb). (747kb) No Text version is available
CC-36D 6/27/2006 Impact Absorption, Inc.  Trailer VTMA @ TL-3  View PDF acceptance letter on Trailer VTMA @ TL-3 (PDF, 4.61 MB). (4.61 MB) View Text acceptance letter on Trailer VTMA @ TL-3.
CC-36C 11/6/2002 Impact Absorption, Inc.  Supplemental test (3-52) @ TL-3  View PDF acceptance letter on Supplemental test (3-52) @ TL-3 (PDF, 50 Kb). (50 Kb) View Text acceptance letter on Supplemental test (3-52) @ TL-3.
CC-36B 2/13/2001 Michael Kempen, IMPACT Absorption  Vanderbilt TMA @ TL-3  View PDF acceptance letter on Vanderbilt TMA @ TL-3 (PDF, 7 kb). (7 kb) No Text version is available
CC-36A 6/17/1997   at TL-3  View PDF acceptance letter on at TL-3 (PDF, 441kb). (441kb) No Text version is available
CC-36 8/27/1996 J. Carney  Vanderbilt TMA @ TL-2  View PDF acceptance letter on Vanderbilt TMA @ TL-2 (PDF, 284kb). (284kb) No Text version is available
CC-35H 7/11/2007 350 Energy Absorption Systems  modification to QUADGUARD system  View PDF acceptance letter on modification to QUADGUARD system (PDF, 293 KB). (293 KB) View Text acceptance letter on modification to QUADGUARD system.
CC-35F 12/10/2003 Energy Absorption Systems, Inc.  QuadGuard CZ on a steel plate @ TL-3  View PDF acceptance letter on QuadGuard CZ on a steel plate @ TL-3 (PDF, 251kb). (251kb) View Text acceptance letter on QuadGuard CZ on a steel plate @ TL-3.
CC-35E 10/19/2001 Energy Absorption Systems, Inc.  9-bay unit @TL-3 for 70mph  View PDF acceptance letter on 9-bay unit @TL-3 for 70mph (PDF, 293 kb). (293 kb) View Text acceptance letter on 9-bay unit @TL-3 for 70mph.
CC-35D 10/13/2001 Energy Absorption Systems, Inc.  9-bay unit w/ add'l capacity@TL-3  View PDF acceptance letter on 9-bay unit w/ add'l capacity@TL-3 (PDF, 48 kb). (48 kb) View Text acceptance letter on 9-bay unit w/ add'l capacity@TL-3.
CC-35C 6/17/1999 Energy Absorption  3-bay QUADGUARD at test level 2 @ TL-2  View PDF acceptance letter on 3-bay QUADGUARD at test level 2 @ TL-2 (PDF, 531 kb). (531 kb) No Text version is available
CC-35B 10/17/1996   QUADGUARD Crash Cushion - no traffic direction restrictions  View PDF acceptance letter on QUADGUARD Crash Cushion - no traffic direction restrictions (PDF, 7 kb). (7 kb) No Text version is available
CC-35A 10/30/1996   QUARDGUARD CZ @ TL-3  View PDF acceptance letter on QUARDGUARD CZ @ TL-3 (PDF, 363kb). (363kb) No Text version is available
CC-35 6/21/1996 Energy Absorption  QUADGUARD Crash Cushion - for unidirectional traffic @ TL-3  View PDF acceptance letter on QUADGUARD Crash Cushion - for unidirectional traffic @ TL-3 (PDF, 330 kb). (330 kb) No Text version is available
CC-34B 3/5/2003 Trinity Industries  Design Modification/Completion of optional TMA tests  View PDF acceptance letter on Design Modification/Completion of optional TMA tests (PDF, 234 Kb). (234 Kb) View Text acceptance letter on Design Modification/Completion of optional TMA tests.
CC-34A 10/30/1996   Modified MPS 350 accepted at test level 3  View PDF acceptance letter on Modified MPS 350 accepted at test level 3 (PDF, 10 kb). (10 kb) No Text version is available
CC-34 6/12/1996 Trinity/SYRO  MPS 350 TMA @ TL-2  View PDF acceptance letter on MPS 350 TMA @ TL-2 (PDF, 654kb). (654kb) No Text version is available
CC-33A 9/5/2002 TRINITY Industries  Alternative posts for CAT attenuator  View PDF acceptance letter on Alternative posts for CAT attenuator (PDF, 42 Kb). (42 Kb) View Text acceptance letter on Alternative posts for CAT attenuator.
CC-33 5/1/1996 Trinity/SYRO  CAT Terminal/Crash Cushion @ TL-3  View PDF acceptance letter on CAT Terminal/Crash Cushion @ TL-3 (PDF, 9 kb). (9 kb) No Text version is available
CC-32 3/19/1996 Energy Absorption  ALPHA 70 TMA @ TL-2  View PDF acceptance letter on ALPHA 70 TMA @ TL-2 (PDF, 572kb). (572kb) No Text version is available
CC-31A 1/27/1998 King Mak, TTI  Modified Metal End Section  View PDF acceptance letter on Modified Metal End Section (PDF, 421 kb). (421 kb) No Text version is available
CC-31 12/4/1995 Texas A&M (TTI)  Slotted Rail Terminals (SRT) for W-beam Guardrail @ TL-3  View PDF acceptance letter on Slotted Rail Terminals (SRT) for W-beam Guardrail @ TL-3 (PDF, 492kb). (492kb) No Text version is available
CC-30 7/13/1995 Connecticut DOT.  Connecticut TMA @ TL-2  View PDF acceptance letter on Connecticut TMA @ TL-2 (PDF, 215kb). (215kb) No Text version is available
CC-29 6/28/1995 Energy Absorption Co.  Energite III module @ TL-3  View PDF acceptance letter on Energite III module @ TL-3 (PDF, 586kb). (586kb) No Text version is available
CC-28 6/28/1995 Roadway Safety Systems  Fitch Universal Module Crash Cushion @ TL-3  View PDF acceptance letter on   Fitch Universal Module Crash Cushion @ TL-3 (PDF, 235kb). (235kb) No Text version is available
CC-27A 3/1/2005 Engineered Arresting Systems Corporation  18-inch dia. water twister  View PDF acceptance letter on 18-inch dia. water twister (PDF, 310 KB). (310 KB) View Text acceptance letter on 18-inch dia. water twister.
CC-27 5/1/1995 Engineered Systems  Water Twister Vehicle Arresting System @ TL-3  View PDF acceptance letter on Water Twister Vehicle Arresting System @ TL-3 (PDF, 208kb). (208kb) No Text version is available
CC-26I 3/10/2006 EASI  Modified Anchor Design  View PDF acceptance letter on Modified Anchor Design (PDF, 148 KB). (148 KB) View Text acceptance letter on Modified Anchor Design.
CC-26H 11/2/2005 Energy Absorption Systems, Inc.  modified REACT anchor designs  View PDF acceptance letter on modified REACT anchor designs (PDF, 292 KB). (292 KB) View Text acceptance letter on modified REACT anchor designs.
CC-26G 7/27/1998 Safety Quest, Inc.  Alternative Rear Anchor Design  View PDF acceptance letter on Alternative Rear Anchor Design (PDF, 478 kb). (478 kb) No Text version is available
CC-26F 9/23/1997   Removed CC-26F restrictions on use at certain sites  View PDF acceptance letter on Removed CC-26F restrictions on use at certain sites (PDF, 143kb). (143kb) No Text version is available
CC-26E 6/25/1997   REACT 350 CZ - with restrictions @ TL-3  View PDF acceptance letter on REACT 350 CZ - with restrictions @ TL-3 (PDF, 744 kb). (744 kb) No Text version is available
CC-26D 12/19/1996 E. Scott Walter  REACT 350 CZ @ TL-2  View PDF acceptance letter on REACT 350 CZ @ TL-2 (PDF, 502kb). (502kb) No Text version is available
CC-26C 9/25/1995   Design change  View PDF acceptance letter on Design change (PDF, 61kb). (61kb) No Text version is available
CC-26B 8/14/1995   Variable speed designs of REACT 350  View PDF acceptance letter on Variable speed designs of REACT 350 (PDF, 187kb). (187kb) No Text version is available
CC-26A 4/12/1995   Removal of conditional acceptance  View PDF acceptance letter on Removal of conditional acceptance (PDF, 115kb). (115kb) No Text version is available
CC-26 3/3/1995 J.Carney, Vanderbilt  Conditional acceptance of REACT 350 at TL-3  View PDF acceptance letter on  Conditional acceptance of REACT 350 at TL-3 (PDF, 747kb). (747kb) No Text version is available
CC-25 2/10/1995 Energy Absorption  NEAT Non-redirecting crash cushion @ TL-2  View PDF acceptance letter on NEAT Non-redirecting crash cushion @ TL-2 (PDF, 910kb). (910kb) No Text version is available
CC-24 11/10/1994 Trinity/Syro  HEXCEL TMA under NCHRP 230 guidelines  No PDF version is available No Text version is available
CC-23A 8/22/1995   BEST modifications to reduce cost  No PDF version is available No Text version is available
CC-23 11/10/1994 Univ. of Nebraska  Metal Cutting Terminal  No PDF version is available No Text version is available
CC-22 6/24/1994 Texas Transportation Institute  Two Slotted Rail Terminals  No PDF version is available No Text version is available
CC-21 6/22/1994 Energy Absorption Systems, Inc.  Truck Mounted Attenuator  No PDF version is available No Text version is available
CC-20A 9/1/1998 Ren-Gard 815  NCHRP Report 350 acceptance @ TL-2  View PDF acceptance letter on NCHRP Report 350 acceptance @ TL-2 (PDF, 5 kb). (5 kb) No Text version is available
CC-20 11/22/1993 RENCO  Truck Mounted Attenuator  No PDF version is available No Text version is available
CC-19 3/1/1993 Connecticut DOT  Generalized Connecticut Impact Attenuation System (GCIAS)  No PDF version is available No Text version is available
CC-18A 6/23/1994   Supplement accepts it as a median terminal as well.  No PDF version is available No Text version is available
CC-18 1/8/1993 Wyoming DOT  Box Beam End Treatment (Numbered "B-23" in error)  No PDF version is available No Text version is available
CC-17 10/20/1992 Roadway Safety Service  FITCH Sand Barrel Attenuator with "Zip-Strip" Connectors and "Unicore" Sand Support Structure  No PDF version is available No Text version is available
CC-16A 3/31/1994 Syro Steel Co.  Qualifies ADIEM for use as a crash cushion as well.  No PDF version is available No Text version is available
CC-16 10/24/1991 Syro Steel Co.  Advanced Dynamic Impact Extension Module (ADIEM), terminal only.  No PDF version is available No Text version is available
CC-15 3/27/1991 ---  Eccentric Loader Terminal (ELT) (Operational) Modified Eccentric Loader Terminal (MELT) (Operational)  No PDF version is available No Text version is available
CC-14 6/4/1990 Syro Steel Co.  CAT crash cushion attenuating terminal (Operational)  No PDF version is available No Text version is available
CC-13A 1/3/1990 Energy Absorption Systems, Inc.  Brakemaster (Experimental) (Letter of 1/3/90 qualifies device for roadside as well as for median use  No PDF version is available No Text version is available
CC-12A 2/28/1994   Design modification  No PDF version is available No Text version is available
CC-13 10/30/1989 Energy Absorption Systems, Inc.  Brakemaster (Experimental) (Letter of 1/3/90 qualifies device for roadside as well as for median use  No PDF version is available No Text version is available
CC-12P 11/10/2005 Trinity Highway Safety Products Division  alternative ET post  View PDF acceptance letter on alternative ET post (PDF, 44.0 KB). (44.0 KB) View Text acceptance letter on alternative ET post.
CC-12N 6/15/2005 Texas Transportation Institute  Modified CRP post  View PDF acceptance letter on Modified CRP post (PDF, 232 KB). (232 KB) View Text acceptance letter on Modified CRP post.
CC-12M 6/16/2004 Texas Transportation Institute  Alternative Post Designs for TL-2 ET  View PDF acceptance letter on Alternative Post Designs for TL-2 ET (PDF, 8.09 KB). (8.09 KB) View Text acceptance letter on Alternative Post Designs for TL-2 ET.
CC-12L 4/11/2003 Texas Transportation Institute  Modified SYTP post for ET-series @ TL-3  View PDF acceptance letter on Modified SYTP post for ET-series @ TL-3 (PDF, 55 Kb). (55 Kb) View Text acceptance letter on Modified SYTP post for ET-series @ TL-3.
CC-12K 8/28/2002 TRINITY Industries  Alternative post design for ET series  View PDF acceptance letter on Alternative post design for ET series (PDF, 38 Kb). (38 Kb) View Text acceptance letter on Alternative post design for ET series.
CC-12J 6/24/2002 Texas Transportation Institute  Steel CRP/SYTP posts for ET terminals  View PDF acceptance letter on Steel CRP/SYTP posts for ET terminals (PDF, 493 kb). (493 kb) View Text acceptance letter on Steel CRP/SYTP posts for ET terminals.
CC-12I 4/10/2000 Trinity Industries, Inc.  ET-2000 Plus Guardrail Terminal @ TL-3  View PDF acceptance letter on ET-2000 Plus Guardrail Terminal @ TL-3 (PDF, 514 kb). (514 kb) No Text version is available
CC-12H 2/18/2000 Trinity Industries, Inc.  ET-2000 Plus Guardrail Terminal @ TL-2  View PDF acceptance letter on ET-2000 Plus Guardrail Terminal @ TL-2 (PDF, 324 kb). (324 kb) No Text version is available
CC-12G 1/18/2000 Texas Transportation Institute  Modified Extruder Head, ET-PLUS @ TL-3  View PDF acceptance letter on Modified Extruder Head, ET-PLUS @ TL-3 (PDF, 1153 kb). (1153 kb) No Text version is available
CC-12F 9/2/1999 Trinity Industries, Inc.  Hinged Breakaway (HBA Steel Posts for ET-2000) @ TL-3  View PDF acceptance letter on Hinged Breakaway (HBA Steel Posts for ET-2000) @ TL-3 (PDF, 606 kb). (606 kb) View Text acceptance letter on Hinged Breakaway (HBA Steel Posts for ET-2000) @ TL-3.
CC-12E 9/22/1998   Design modification - rail element length @ TL-3  View PDF acceptance letter on Design modification - rail element length @ TL-3 (PDF, 4 kb). (4 kb) No Text version is available
CC-12D 12/20/1996   Modified ET-2000 (LET) @ TL-3  View PDF acceptance letter on Modified ET-2000 (LET) @ TL-3 (PDF, 60 kb). (60 kb) No Text version is available
CC-12C 8/22/1995   NCHRP 350 ACCEPTANCE @ TL-3  View PDF acceptance letter on NCHRP 350 ACCEPTANCE @ TL-3 (PDF, 333kb). (333kb) No Text version is available
CC-12B 4/26/1995   Design modification  No PDF version is available No Text version is available
CC-12 9/6/1989 Syro Steel Co.  ET-2000 (Guardrail Extruder Terminal) (Experimental)  No PDF version is available No Text version is available
CC-11 6/20/1989 Energy Absorption Systems, Inc  Low Maintenance Attenuator (GREAT with rubber cushioning cylinders.) (Experimental)  No PDF version is available No Text version is available
CC-102 11/5/2007 350 Barrier Systems  X-tension Technology End Terminals  View PDF acceptance letter on X-tension Technology End Terminals (PDF, 2.84 MB). (2.84 MB) View Text acceptance letter on X-tension Technology End Terminals.
CC-100 8/30/2007 350 Texas Trans. Inst.  modify SRT, to 31” height  View PDF acceptance letter on modify SRT, to 31” height (PDF, 549 KB). (549 KB) View Text acceptance letter on modify SRT, to 31” height.
CC-10 4/7/1989 Energy Absorption Systems, Inc  SENTRE guardrail terminal (Operational)  No PDF version is available No Text version is available
CC-09 4/5/1989 Connecticut DOT  Narrow Connecticut Impact Attenuation System (NCIAS) (Experimental)  No PDF version is available No Text version is available
CC-08 3/10/1988 Syro Steel Co.  C.A.T. Median Barrier Terminal or Impact Attenuator (Experimental) V.A.T. Update (Experimental)  No PDF version is available No Text version is available
CC-07 11/6/1986 Connecticut DOT  Connecticut Impact Attenuation System (CIAS) crash cushion (Operational)  No PDF version is available No Text version is available
CC-06 10/31/1986 Energy Absorption Systems, Inc.  GREAT with Hex-Foam II crash cushion (Operational)  No PDF version is available No Text version is available
CC-05 7/23/1986 Syro Steel Co.  Vehicle Attenuating Terminal (VAT) (Experimental) [see CC-8]  No PDF version is available No Text version is available
CC-04 1/8/1986 Energy Absorption Systems, Inc  TREND rigid barrier terminal (experimental)  No PDF version is available No Text version is available
CC-03 1/7/1986 -----  Eccentric Loader guardrail terminal (Experimental) (FHWA Tech. Advisory)  No PDF version is available No Text version is available
CC-02 10/1/1984 Syro Steel Co  Controlled Releasing Terminal (CRT) (Experimental) (FHWA Bulletin)  No PDF version is available No Text version is available
CC-01 9/29/1983 Energy Absorption Systems, Inc  SENTRE guardrail terminal (experimental) [see CC-10]  No PDF version is available No Text version is available




Download the free adobe acrobat reader to view PDFs You will need the Adobe Acrobat Reader to view the PDFs on this page.

 

Office of Operations FHWA Safety Home