Code |
Date |
350/Mash |
Manufacturer |
Device Description |
View PDF |
Text Version |
|
CC-104* |
2/8/2008 |
350 |
Energy Absorption, Inc |
Vorteq Trailer Truck Mounted Attenuator |
(594 KB) |
|
CC-96SKT |
12/21/2007 |
350 |
Gregory Highway Products |
GMS-WB 31, mini spacer guardrail system |
(144 KB) |
|
CC-99 |
6/14/2007 |
350 |
Impact Absorption |
U-MAD trailer-mounted attenuator |
(351 KB) |
|
CC-98 |
4/9/2007 |
350 |
Armorflex |
Armorwire Terminal End for cable barriers |
(1.56 MB) |
|
CC-97 |
3/8/2007 |
350 |
Plastic Safety Systems, Inc |
Crashgard Sand Barrel Attenuator System |
(3.11 MB) |
|
CC-95 |
2/26/2007 |
350 |
TrafFix Devices, Inc |
The Compressor is a redirective, non-gating Crash Cushion |
(1.60 MB) |
|
CC-94A |
8/30/2007 |
350 |
Trinity Highway Products |
modify ET-2000 Plus to 31 height |
(582 KB) |
|
CC-94 |
9/2/2005 |
|
Trinity Industries |
ET-Plus teminal for MGS barrier |
(847 KB) |
|
CC-93A |
12/28/2006 |
|
Safence |
Wire Rope Terminal @ TL-3/TL-4 |
(140 KB) |
|
CC-93 |
8/16/2005 |
|
Safence |
TL-3 teminal for Safence cable barrier |
(297 KB) |
|
CC-92A |
9/10/2007 |
350 |
Gibraltar |
Mod Gibraltar Cable Terminal w/driven post |
(356 KB) |
|
CC-92 |
6/23/2005 |
|
Gibraltar |
TL-3 Terminal for Gibraltar Cable Barrier |
(2.51 MB) |
|
CC-91 |
6/9/2005 |
|
Armorflex Ltd. |
Armorflex Ltd. X350 terminal @ TL-3 |
(1.15 MB) |
|
CC-90A |
9/18/2006 |
|
Safety By Design Co. |
Optional TL-3 tests for trailer TMA |
(1.16 MB) |
|
CC-90 |
4/15/2005 |
|
Safety By Design Company |
Trailer TMA |
(694 KB) |
|
CC-89 |
3/17/2005 |
|
Texas Transportation Institute |
HEART crash cushion |
(1945 KB) |
|
CC-88 |
3/8/2005 |
|
Road Systems, Incorporated |
SKT/FLEAT terminals for MGS guardrail |
(3.10 MB) |
|
CC-87C |
5/8/2007 |
350 |
Energy Absorption Systems, Inc. |
QUEST 115 system |
(249 KB) |
|
CC-87B |
10/27/2006 |
350 |
Energy Absorption Systems, Inc. |
QUEST 70/100 system |
(1.32 MB) |
|
CC-26I/CC-87A |
3/10/2006 |
|
EASI |
Modified Anchor Design |
(148 KB) |
|
CC-87 |
2/17/2005 |
|
Energy Absorption Systems, Inc. |
QUEST crash cushion @ TL-3 |
(996KB) |
|
CC-86B |
1/5/2007 |
|
BRIFEN USA, Inc |
WRSF Modified (flared) TL-3/TL-4 terminal |
(519 KB) |
|
CC-86A |
8/10/2005 |
|
BRIFEN, USA, Inc |
Modified terminal for TL-4 WRSF |
(274 KB) |
|
CC-86 |
1/28/2004 |
|
Hill & Smith Limited |
Terminal for BRIFEN cable barrier @ TL-3 |
(1811 KB) |
|
CC-85B |
10/19/2005 |
|
SCI Products Incorporated |
SCI1000GM performance evaluation |
(28.0 KB) |
|
CC-85A |
2/9/2005 |
|
SCI Products Incorporated |
SCI-70GM attenuator @ TL-2 |
(1261 KB) |
|
CC-85 |
9/12/2003 |
|
Stabler Companies, Incorporated |
Redirectional Crash Cushion @ TL-3 |
(697kb) |
|
CC-84 |
12/10/2003 |
|
Connecticut DOT |
MELT W-beam guardrail terminal @ TL-2 |
(9 KB) |
|
CC-83 |
7/11/2003 |
|
Energy Absorption Systems, Inc. |
TL-1 Ls-PRO TMA |
(303 kb) |
|
CC-82 |
9/5/2003 |
|
Energy Absorption Systems, Inc. |
Redirecting Crash Cushion @ TL-3 |
(472kb) |
|
CC-81 |
8/30/2002 |
|
TRINITY Industries |
CPSI side- impact enhancement for ET seriesl |
(180 Kb) |
|
CC-80 |
9/5/2002 |
|
Energy Absorption Systems, Inc. |
REGENT-C W-beam guardrail terminal @ TL-3 |
(426 Kb) |
|
CC-79 |
10/11/2002 |
|
Safety By Design Co., Inc. |
Trailer Attenuating Cushion (TAC) @ TL-3 |
(2.08 Mb) |
|
CC-78D |
7/25/2007 |
350 |
Energy Absorption Systems, Inc. |
Safe-Stop trailer TMA |
(733 KB) |
|
CC-78C |
7/15/2005 |
|
Energy Absorption Systems, Inc. |
Safestop Trailer TMA |
(2.68 MB) |
|
CC-78B |
3/11/2005 |
|
Energy Absorption Systems, Inc. |
Test 2-51 w/Safe Stop 180 in folded position |
(138 KB) |
|
CC-78A |
7/10/2003 |
|
Energy Absorption Systems, Inc. |
Designs changes & optional TL-3 tests for Safe Stop 180 |
(779 kb) |
|
CC-78 |
7/11/2002 |
|
Energy Absorption Systems, inc. |
TL-3 TMA |
(527 Kb) |
|
CC-77 |
4/4/2002 |
|
Connecticut DOT |
Non-proprietary steel cylinder crash cushion @ TL-3 |
(453 kb) |
|
CC-76 |
8/29/2002 |
|
Texas Transportation Institute |
3-strand cable guardrail terminal @ TL-3 |
(1.7 Mb) |
|
CC-75C |
6/4/2004 |
|
Barrier Systems, Incorporated |
Alternative TAUl-II backup/anchor design |
(469 KB) |
|
CC-75B |
12/9/2003 |
|
Barrier Systems, Inc. |
TAU-II/TAU-II Wide system @ var. TL's |
(3.34mb) |
|
CC-75A |
12/20/2002 |
|
Barrier Systems, Inc. |
TAU-II anchorage options
& 70 mph design |
(396 Kb) |
|
CC-75 |
9/14/2001 |
|
Barrier Systems, Inc. |
TAU-II Crash Cushions @ TL-2 and TL-3 |
(3.33 mb) |
|
CC-74 |
8/24/2001 |
|
Universal Safety Response, Inc. |
Ground Retractable Traffic Barrier (GRAB) @ TL-2 |
(6.7 mb) |
|
CC-73C |
5/8/2006 |
|
Energy Absorption Systems, Inc. |
TL-1 Wide REACT |
(305 KB) |
|
CC-73B |
5/26/2005 |
|
Energy Absorption Systems, Inc. |
Wide REACT @TL-2 |
(516KB) |
|
CC-73A |
4/30/2002 |
|
Energy Absorption Systems, Inc. |
REACT 350 (96" and 120")@TL-3 |
(1.65 mb) |
|
CC-73 |
5/4/2001 |
|
Barry D. Stephens, P.E., Energy Absorption Systems, Inc |
REACT 350 (60") @ TL-3 |
(201 kb) |
No Text version is available |
CC-72 |
12/18/2000 |
|
Rodney A. Boyd, Trinity Industries, Inc. |
Straight Flare Slotted Rail Terminal (SRT) @ TL-3 |
(354 kb) |
|
CC-71 |
12/6/2000 |
|
Barry Stephens, EASI |
EASI-Cell Crash Cushion |
(137 kb) |
|
CC-70 |
11/28/2000 |
|
Barry Stephens, EASI |
WorkZoNet (Dragnet) |
(437 kb) |
|
CC-69D |
7/16/2004 |
|
Road Systems, Inc. |
Concrete-mounted BEAT SS-Crash Cushion |
(443 KB) |
|
CC-69C |
12/12/2003 |
|
Road Systems, Inc. |
BEAT Bridge Pier Protection System @ TL-3 |
(547kb) |
|
CC-69B |
2/22/2002 |
|
Road Systems, Inc. |
Box Beam Crash Cushion @ TL-3 |
(1.9 mb) |
|
CC-69A |
2/1/2002 |
|
Road Systems, Inc. |
Bursting Energy Absorbing Terminal (BEAT) for median box-beam guardrail @ TL-3 |
(60 kb) |
|
CC-69 |
11/9/2000 |
|
Road Systems, Inc. |
Bursting Energy Absorbing Terminal (BEAT) for roadside box beam guardrail @ TL-3 |
(116 kb) |
|
CC-68 |
11/8/2000 |
|
MwRSF-U of NB |
Trie-beam Bullnose attenuator @ TL-3 |
(226 kb) |
|
CC-67 |
6/29/2000 |
|
RENCO, Inc. |
RENCO RAM 100K Truck-Mounted Attenuator (TMA) @ TL-3 |
(1.61mb) |
No Text version is available |
CC-66B |
12/9/2003 |
|
Barrier Systems, Inc. |
Modified ABSORB 350 w/ expanded application |
(453kb) |
|
CC-66A |
6/27/2000 |
|
Barrier Systems, Inc. |
ABSORB 350 crash cushion @ TL-2 |
(156 kb) |
No Text version is available |
CC-66 |
5/11/2000 |
|
Barrier Systems Inc. |
ABSORB 350 crash cushion @ TL-3 |
(6599 Kb) |
No Text version is available |
CC-65D |
3/3/2008 |
350 |
Traffix Devices |
Scorpion TA Test Level 2 |
(385 KB) |
|
CC-65C |
3/3/2008 |
350 |
Traffix Devices |
Scorpion TA - Infinite weight |
(0.99 MB) |
|
CC-65B |
3/16/2007 |
|
TrafFix Devices, Inc |
Trailer TMA |
(1.41 MB) |
|
CC-65A |
12/8/2000 |
|
Dave Gertz, TrafFix Devices, Inc. |
Design change (to steel diagrams and hinges) |
(67 kb) |
|
CC-65 |
7/14/2000 |
|
TrafFix Devices, Inc. |
TMA (Scorpion A 10,000) & TMA (Scorpion C 10,000) @ TL-2 & TL-3 |
(6.02 mb) |
No Text version is available |
CC-64G |
5/30/2006 |
|
Impact Absortion, Inc |
UMAD TMA modification |
(36 KB) |
|
CC-64F |
10/20/2005 |
|
Albert W. Unrath, Inc. |
Supplemental tests for TL-2 U-MAD |
(40.0 KB) |
|
CC-64E |
12/21/2004 |
|
ALBERT W. UNRATH, INC |
Modified U-MAD 70K TMA @TL-2 |
(175 KB) |
|
CC-64D |
7/28/2003 |
|
Albert W. Unrath, Inc. |
Optional TL-3 tests for the U-MAD 100K TMA |
(44 kb) |
|
CC-64C |
3/11/2003 |
|
ALBERT W. UNRATH, INC. |
U-MAD 50K TMA @TL-1 |
(66 Kb) |
|
CC-64B |
2/1/2002 |
|
Albert W. Unrath, Inc. |
U-MAD 70K TMA @ TL-2 |
(48 Kb) |
|
CC-64A |
7/18/2000 |
|
Albert Unrath Inc. |
Clarification of acceptance conditions @ TL-3 |
(16.0 kb) |
No Text version is available |
CC-64 |
3/30/2000 |
|
Albert Unrath Inc. |
U-MAD 100K Truck Mounted Attenuator @ TL-3 |
(1131 kb) |
No Text version is available |
CC-63 |
2/14/2000 |
|
Dwight Horne, Director, FHWA Office of Highway Safety Infrastructure |
Acceptance of New York 3-Strand Cable Terminal @ TL-3 |
(1049 kb) |
No Text version is available |
CC-62 |
12/21/1999 |
|
Dale Wilken, Eastern Resource Center |
Vermont Low-Speed W-beam Guardrail Terminal (G1-d) @ TL-2 |
(336 kb) |
No Text version is available |
CC-61C |
4/4/2004 |
|
Midwest Roadside Safety Facility |
Single-bolt post for FLEAT/SKT terminals |
(513 KB) |
|
CC-61B |
4/5/2004 |
|
Nebraska Dept. of Roads |
2-bolt breakaway post design for SKT-350 and FLEAT |
(187 KB) |
|
CC-61A |
10/30/2002 |
|
Midwest Roadside Safety Facility |
Conditional acceptance for bolted-steel posts for SKT-350 |
(300 Kb) |
|
CC-61 |
8/27/1999 |
|
Road Systems, Inc. |
Breakaway Steel Posts for SKT-350 and FLEAT Terminals |
(146 kb) |
No Text version is available |
CC-60 |
8/19/1999 |
|
King Mak, TTI |
Wyoming Box-Beam End Terminal (WYBET-350) @ TL-3 |
(963 kb) |
No Text version is available |
CC-60A |
11/12/1999 |
|
King Mak, TTI |
WYBET Material Specifications |
(37 kb) |
No Text version is available |
CC-59B |
6/9/2006 |
|
Energy Absorption Systems, Incorporated |
"Tailgate" mount for SafeStop TMA |
(702 KB) |
|
CC-59A |
3/11/2005 |
|
Energy Absorption Systems, Inc. |
Test 3-52 on modified Safe Stop |
(226 KB) |
|
CC-59 |
4/2/1999 |
|
J.M.Essex, EASI |
SAFE STOP Truck Mounted Attenuator (TMA) @ TL-3 |
(6 kb) |
No Text version is available |
CC-58 |
3/26/1999 |
|
Connecticut DOT |
Narrow Connecticut Impact Attenuator (NCIAS) @ TL-3 |
(590 kb) |
No Text version is available |
CC-57B |
7/25/2007 |
350 |
Energy Absorption Systems |
QUADGUARD Elite system 8 bays |
(820 KB) |
|
CC-57A |
6/17/1999 |
|
J.M. Essex,EASI |
7-bay QuadGuard Elite at test level 2 @ TL-2 |
(350 kb) |
No Text version is available |
CC-57 |
12/30/1998 |
|
J.M.Essex, EASI |
QuadGuard Elite (various widths) @ TL-3 |
(6 kb) |
No Text version is available |
CC-56A |
4/2/1999 |
|
Darryl Durgin, MnDOT |
Eccentric Loader Terminal (ELT) @ TL-3 |
(16 kb) |
No Text version is available |
CC-56 |
12/24/1998 |
|
Minnesota DOT |
Eccentric Loader Terminal (ELT) @ TL-3 |
(415 kb) |
No Text version is available |
CC-55 |
11/16/1998 |
|
B&B Electromatic |
VT6802 Traffic Gate @ TL-2 |
(382 kb) |
No Text version is available |
CC-54H |
6/9/2005 |
|
Trinity Industries, Inc. |
TL-3 crash cushion w/ add'l capacity (FasTRACC) |
(1.71 MB) |
|
CC-54G |
3/9/2005 |
|
Trinity Industries |
Redesigned TRACC Attenuators |
(36 KB) |
|
CC-54F |
1/13/2004 |
|
Trinity Industries |
Modified TRACC attenuators @ TL2 and TL3 |
(859 KB) |
|
CC-54E |
3/11/2003 |
|
Trinity Industries |
Modular Base asslembly for TRACC |
(235 Kb) |
|
CC-54D |
9/5/2002 |
|
Trinity Highway Safety Products Division |
Wide-TRACC @ TL-3 |
(451 Kb) |
|
CC-54C |
7/3/2002 |
|
Trinity Industries, Inc. |
TRACC Transition Designs |
(125 Kb) |
|
CC-54B |
4/10/2001 |
|
Rodney A. Boyd, Trinity Industries, Inc. |
Trinity Attenuating Crash Cushion (TRACC) @TL-3 |
(6 kb) |
No Text version is available |
CC-54A |
9/8/2000 |
|
Rodney Boyd, Trinity |
Test Level 2 (TL-2) TRACC |
(50 kb) |
|
CC-54 |
11/13/1998 |
|
Don Johnson, Syro,Inc |
Trinity Attenuating Crash Cushion (TRACC) @ TL-3 |
(1078 kb) |
No Text version is available |
CC-53A |
4/27/2001 |
|
FHWA Regional Admin |
Buried-in-backslope w-beam terminal (1:4 foreslope) @ TL-3 |
(8 kb) |
No Text version is available |
CC-53 |
7/10/1998 |
|
FHWA Regional Admin |
Buried-in-backslope W-beam terminal (3 variations) @ TL-3 |
(530 kb) |
No Text version is available |
CC-52B |
4/12/2002 |
|
TrafFix Devices, Inc. |
Specification change to two-piece barrels |
(2.12 mb) |
|
CC-52A |
11/3/1999 |
|
Dave Gertz, Traffix Devices, Inc. |
Modification in Orientation of 700-lb Module |
(148 kb) |
|
CC-52 |
7/10/1998 |
|
Dave Gertz |
TrafFix Devices Sand Barrel System @ TL-3 |
(1109 kb) |
No Text version is available |
CC-51A |
6/4/1999 |
|
King Mak, TTI |
Improved Slotted Rail Terminal (ISRT-4) @ TL-3 |
(330 kb) |
No Text version is available |
CC-51 |
6/18/1998 |
|
King Mak, TTI |
Improved Slotted Rail Terminal (ISRT-3) @ TL-3 |
(307 kb) |
No Text version is available |
CC-50B |
12/9/1999 |
|
Energy Absorption Systems, Inc. |
Wide-REACT Acceptance downgraded to CONDITIONAL @ TL-3 |
(16 kb) |
No Text version is available |
CC-50A |
6/9/1999 |
|
Dean Alberson |
Name change to Medium REACT w/2743 or 3048mm widths) @ TL-3 |
(82 kb) |
No Text version is available |
CC-50 |
6/16/1998 |
|
John Carney |
Wide REACT @ TL-3 |
(562 kb) |
No Text version is available |
CC-49 |
6/17/1998 |
|
J.M.Essex, EASI |
QuadTrend @ TL-3 |
(631 kb) |
No Text version is available |
CC-48 |
5/28/1998 |
|
J.M.Essex, EASI |
REdirecting Gating ENd Terminal (REGENT) @ TL-3 |
(1309kb) |
No Text version is available |
CC-47B |
2/6/2004 |
|
Energy Absorption Systems Inc. |
TRITON Concrete End Treatment System (TCETS) at TL2 & TL-3 |
(786 KB) |
|
CC-47A |
4/21/2003 |
|
Energy Absorption Systems Inc. |
TRITON End Treatment System at TL-3 (unique application) |
(11.3 KB) |
|
CC-47 |
5/8/1998 |
|
Energy Absorption Systems Inc. |
TRITON End Treatment for TRITON Barrier at TL-3 (See B-26 for TL-2) |
(127kb) |
No Text version is available |
CC-46D |
8/24/2001 |
|
Road Systems, Inc |
FLEAT terminal for median w-beam |
(3.8 mb) |
|
CC-46C |
6/1/2001 |
|
Kaddo Kothmann, Road Systems Inc. |
FLEAT W-beam guardrail terminal @ TL-3 |
(4 kb) |
No Text version is available |
CC-46B |
5/21/1999 |
|
Road Systems, Inc. |
Modified FLEAT - test level 2 (TL-2) design |
(153 kb) |
No Text version is available |
CC-46A |
8/27/1998 |
|
Road Systems, Inc. |
FLEAT w/ variable offset (762 mm to 1219 mm) @ TL-3 |
(274 kb) |
No Text version is available |
CC-46 |
4/2/1998 |
|
Road Systems, Inc. |
FLared Energy Absorbing Terminal (FLEAT-350) @ TL-3 |
(643 kb) |
No Text version is available |
CC-45 |
3/19/1998 |
|
Energy Absorption |
QuadGuard 69/90-LMC @ TL-3 |
(361 kb) |
No Text version is available |
CC-44 |
3/6/1998 |
|
Trinity/Syro |
Sloped end terminal for Low-Profile Barrier @ TL-2 |
(516kb) |
No Text version is available |
CC-43 |
12/1/1997 |
|
Energy Absorption |
QuadGuard-Low Maintenance Cartridge (LMC) @ TL-3 |
(302 kb) |
No Text version is available |
CC-42A |
12/10/2003 |
|
Energy Absorption Systems, Inc. |
QuadGuard w/ 10-degree side-panel flare |
(352kb) |
|
CC-42 |
7/16/1997 |
|
Energy Absorption |
QUADGUARD-WIDE system @ TL-3 |
(1.13 MB) |
|
CC-41 |
6/19/1997 |
|
Energy Absorption |
Brakemaster terminal/crash cushion @ TL-3 |
(274 kb) |
No Text version is available |
CC-40B |
7/14/2004 |
|
Road Systems, Inc. |
SKT-LT @ TL-3 |
(14.3 KB) |
|
CC-40A |
2/4/2000 |
|
Dean Sicking, Midwest Roadside Safety Facility |
Modified SKT-350 @ TL-2 |
(198 kb) |
|
CC-40 |
4/2/1997 |
|
Road Systems, Inc. |
Sequential Kinking Terminal (SKT-350) @ TL-3 |
(492 kb) |
No Text version is available |
CC-39 |
4/24/1997 |
|
Energy Absorption |
ALPHA 100K TMA @ TL-3 |
(477 kb) |
No Text version is available |
CC-38 |
3/3/1997 |
|
Trinity/Syro |
ADIEM @ TL-3 |
(11 kb) |
No Text version is available |
CC-37C |
4/1/1997 |
|
|
Design modification |
(250kb) |
No Text version is available |
CC-37B |
2/19/1997 |
|
(Pfeifer) |
Design modification |
(109kb) |
No Text version is available |
CC-37A |
2/19/1997 |
|
(Sicking) |
Design modification |
(128kb) |
No Text version is available |
CC-37 |
11/20/1996 |
|
Univ. of Nebraska |
BEST-350 @ TL-3 |
(747kb) |
No Text version is available |
CC-36D |
6/27/2006 |
|
Impact Absorption, Inc. |
Trailer VTMA @ TL-3 |
(4.61 MB) |
|
CC-36C |
11/6/2002 |
|
Impact Absorption, Inc. |
Supplemental test (3-52) @ TL-3 |
(50 Kb) |
|
CC-36B |
2/13/2001 |
|
Michael Kempen, IMPACT Absorption |
Vanderbilt TMA @ TL-3 |
(7 kb) |
No Text version is available |
CC-36A |
6/17/1997 |
|
|
at TL-3 |
(441kb) |
No Text version is available |
CC-36 |
8/27/1996 |
|
J. Carney |
Vanderbilt TMA @ TL-2 |
(284kb) |
No Text version is available |
CC-35H |
7/11/2007 |
350 |
Energy Absorption Systems |
modification to QUADGUARD system |
(293 KB) |
|
CC-35F |
12/10/2003 |
|
Energy Absorption Systems, Inc. |
QuadGuard CZ on a steel plate @ TL-3 |
(251kb) |
|
CC-35E |
10/19/2001 |
|
Energy Absorption Systems, Inc. |
9-bay unit @TL-3 for 70mph |
(293 kb) |
|
CC-35D |
10/13/2001 |
|
Energy Absorption Systems, Inc. |
9-bay unit w/ add'l capacity@TL-3 |
(48 kb) |
|
CC-35C |
6/17/1999 |
|
Energy Absorption |
3-bay QUADGUARD at test level 2 @ TL-2 |
(531 kb) |
No Text version is available |
CC-35B |
10/17/1996 |
|
|
QUADGUARD Crash Cushion - no traffic direction restrictions |
(7 kb) |
No Text version is available |
CC-35A |
10/30/1996 |
|
|
QUARDGUARD CZ @ TL-3 |
(363kb) |
No Text version is available |
CC-35 |
6/21/1996 |
|
Energy Absorption |
QUADGUARD Crash Cushion - for unidirectional traffic @ TL-3 |
(330 kb) |
No Text version is available |
CC-34B |
3/5/2003 |
|
Trinity Industries |
Design Modification/Completion of optional TMA tests |
(234 Kb) |
|
CC-34A |
10/30/1996 |
|
|
Modified MPS 350 accepted at test level 3 |
(10 kb) |
No Text version is available |
CC-34 |
6/12/1996 |
|
Trinity/SYRO |
MPS 350 TMA @ TL-2 |
(654kb) |
No Text version is available |
CC-33A |
9/5/2002 |
|
TRINITY Industries |
Alternative posts for CAT attenuator |
(42 Kb) |
|
CC-33 |
5/1/1996 |
|
Trinity/SYRO |
CAT Terminal/Crash Cushion @ TL-3 |
(9 kb) |
No Text version is available |
CC-32 |
3/19/1996 |
|
Energy Absorption |
ALPHA 70 TMA @ TL-2 |
(572kb) |
No Text version is available |
CC-31A |
1/27/1998 |
|
King Mak, TTI |
Modified Metal End Section |
(421 kb) |
No Text version is available |
CC-31 |
12/4/1995 |
|
Texas A&M (TTI) |
Slotted Rail Terminals (SRT) for W-beam Guardrail @ TL-3 |
(492kb) |
No Text version is available |
CC-30 |
7/13/1995 |
|
Connecticut DOT. |
Connecticut TMA @ TL-2 |
(215kb) |
No Text version is available |
CC-29 |
6/28/1995 |
|
Energy Absorption Co. |
Energite III module @ TL-3 |
(586kb) |
No Text version is available |
CC-28 |
6/28/1995 |
|
Roadway Safety Systems |
Fitch Universal Module Crash Cushion @ TL-3 |
(235kb) |
No Text version is available |
CC-27A |
3/1/2005 |
|
Engineered Arresting Systems Corporation |
18-inch dia. water twister |
(310 KB) |
|
CC-27 |
5/1/1995 |
|
Engineered Systems |
Water Twister Vehicle Arresting System @ TL-3 |
(208kb) |
No Text version is available |
CC-26I |
3/10/2006 |
|
EASI |
Modified Anchor Design |
(148 KB) |
|
CC-26H |
11/2/2005 |
|
Energy Absorption Systems, Inc. |
modified REACT anchor designs |
(292 KB) |
|
CC-26G |
7/27/1998 |
|
Safety Quest, Inc. |
Alternative Rear Anchor Design |
(478 kb) |
No Text version is available |
CC-26F |
9/23/1997 |
|
|
Removed CC-26F restrictions on use at certain sites |
(143kb) |
No Text version is available |
CC-26E |
6/25/1997 |
|
|
REACT 350 CZ - with restrictions @ TL-3 |
(744 kb) |
No Text version is available |
CC-26D |
12/19/1996 |
|
E. Scott Walter |
REACT 350 CZ @ TL-2 |
(502kb) |
No Text version is available |
CC-26C |
9/25/1995 |
|
|
Design change |
(61kb) |
No Text version is available |
CC-26B |
8/14/1995 |
|
|
Variable speed designs of REACT 350 |
(187kb) |
No Text version is available |
CC-26A |
4/12/1995 |
|
|
Removal of conditional acceptance |
(115kb) |
No Text version is available |
CC-26 |
3/3/1995 |
|
J.Carney, Vanderbilt |
Conditional acceptance of REACT 350 at TL-3 |
(747kb) |
No Text version is available |
CC-25 |
2/10/1995 |
|
Energy Absorption |
NEAT Non-redirecting crash cushion @ TL-2 |
(910kb) |
No Text version is available |
CC-24 |
11/10/1994 |
|
Trinity/Syro |
HEXCEL TMA under NCHRP 230 guidelines |
No PDF version is available |
No Text version is available |
CC-23A |
8/22/1995 |
|
|
BEST modifications to reduce cost |
No PDF version is available |
No Text version is available |
CC-23 |
11/10/1994 |
|
Univ. of Nebraska |
Metal Cutting Terminal |
No PDF version is available |
No Text version is available |
CC-22 |
6/24/1994 |
|
Texas Transportation Institute |
Two Slotted Rail Terminals |
No PDF version is available |
No Text version is available |
CC-21 |
6/22/1994 |
|
Energy Absorption Systems, Inc. |
Truck Mounted Attenuator |
No PDF version is available |
No Text version is available |
CC-20A |
9/1/1998 |
|
Ren-Gard 815 |
NCHRP Report 350 acceptance @ TL-2 |
(5 kb) |
No Text version is available |
CC-20 |
11/22/1993 |
|
RENCO |
Truck Mounted Attenuator |
No PDF version is available |
No Text version is available |
CC-19 |
3/1/1993 |
|
Connecticut DOT |
Generalized Connecticut Impact Attenuation System (GCIAS) |
No PDF version is available |
No Text version is available |
CC-18A |
6/23/1994 |
|
|
Supplement accepts it as a median terminal as well. |
No PDF version is available |
No Text version is available |
CC-18 |
1/8/1993 |
|
Wyoming DOT |
Box Beam End Treatment (Numbered "B-23" in error) |
No PDF version is available |
No Text version is available |
CC-17 |
10/20/1992 |
|
Roadway Safety Service |
FITCH Sand Barrel Attenuator with "Zip-Strip" Connectors and "Unicore" Sand Support Structure |
No PDF version is available |
No Text version is available |
CC-16A |
3/31/1994 |
|
Syro Steel Co. |
Qualifies ADIEM for use as a crash cushion as well. |
No PDF version is available |
No Text version is available |
CC-16 |
10/24/1991 |
|
Syro Steel Co. |
Advanced Dynamic Impact Extension Module (ADIEM), terminal only. |
No PDF version is available |
No Text version is available |
CC-15 |
3/27/1991 |
|
--- |
Eccentric Loader Terminal (ELT) (Operational) Modified Eccentric Loader Terminal (MELT) (Operational) |
No PDF version is available |
No Text version is available |
CC-14 |
6/4/1990 |
|
Syro Steel Co. |
CAT crash cushion attenuating terminal (Operational) |
No PDF version is available |
No Text version is available |
CC-13A |
1/3/1990 |
|
Energy Absorption Systems, Inc. |
Brakemaster (Experimental) (Letter of 1/3/90 qualifies device for roadside as well as for median use |
No PDF version is available |
No Text version is available |
CC-12A |
2/28/1994 |
|
|
Design modification |
No PDF version is available |
No Text version is available |
CC-13 |
10/30/1989 |
|
Energy Absorption Systems, Inc. |
Brakemaster (Experimental) (Letter of 1/3/90 qualifies device for roadside as well as for median use |
No PDF version is available |
No Text version is available |
CC-12P |
11/10/2005 |
|
Trinity Highway Safety Products Division |
alternative ET post |
(44.0 KB) |
|
CC-12N |
6/15/2005 |
|
Texas Transportation Institute |
Modified CRP post |
(232 KB) |
|
CC-12M |
6/16/2004 |
|
Texas Transportation Institute |
Alternative Post Designs for TL-2 ET |
(8.09 KB) |
|
CC-12L |
4/11/2003 |
|
Texas Transportation Institute |
Modified SYTP post for ET-series @ TL-3 |
(55 Kb) |
|
CC-12K |
8/28/2002 |
|
TRINITY Industries |
Alternative post design for ET series |
(38 Kb) |
|
CC-12J |
6/24/2002 |
|
Texas Transportation Institute |
Steel CRP/SYTP posts for ET terminals |
(493 kb) |
|
CC-12I |
4/10/2000 |
|
Trinity Industries, Inc. |
ET-2000 Plus Guardrail Terminal @ TL-3 |
(514 kb) |
No Text version is available |
CC-12H |
2/18/2000 |
|
Trinity Industries, Inc. |
ET-2000 Plus Guardrail Terminal @ TL-2 |
(324 kb) |
No Text version is available |
CC-12G |
1/18/2000 |
|
Texas Transportation Institute |
Modified Extruder Head, ET-PLUS @ TL-3 |
(1153 kb) |
No Text version is available |
CC-12F |
9/2/1999 |
|
Trinity Industries, Inc. |
Hinged Breakaway (HBA Steel Posts for ET-2000) @ TL-3 |
(606 kb) |
|
CC-12E |
9/22/1998 |
|
|
Design modification - rail element length @ TL-3 |
(4 kb) |
No Text version is available |
CC-12D |
12/20/1996 |
|
|
Modified ET-2000 (LET) @ TL-3 |
(60 kb) |
No Text version is available |
CC-12C |
8/22/1995 |
|
|
NCHRP 350 ACCEPTANCE @ TL-3 |
(333kb) |
No Text version is available |
CC-12B |
4/26/1995 |
|
|
Design modification |
No PDF version is available |
No Text version is available |
CC-12 |
9/6/1989 |
|
Syro Steel Co. |
ET-2000 (Guardrail Extruder Terminal) (Experimental) |
No PDF version is available |
No Text version is available |
CC-11 |
6/20/1989 |
|
Energy Absorption Systems, Inc |
Low Maintenance Attenuator (GREAT with rubber cushioning cylinders.) (Experimental) |
No PDF version is available |
No Text version is available |
CC-102 |
11/5/2007 |
350 |
Barrier Systems |
X-tension Technology End Terminals |
(2.84 MB) |
|
CC-100 |
8/30/2007 |
350 |
Texas Trans. Inst. |
modify SRT, to 31 height |
(549 KB) |
|
CC-10 |
4/7/1989 |
|
Energy Absorption Systems, Inc |
SENTRE guardrail terminal (Operational) |
No PDF version is available |
No Text version is available |
CC-09 |
4/5/1989 |
|
Connecticut DOT |
Narrow Connecticut Impact Attenuation System (NCIAS) (Experimental) |
No PDF version is available |
No Text version is available |
CC-08 |
3/10/1988 |
|
Syro Steel Co. |
C.A.T. Median Barrier Terminal or Impact Attenuator (Experimental) V.A.T. Update (Experimental) |
No PDF version is available |
No Text version is available |
CC-07 |
11/6/1986 |
|
Connecticut DOT |
Connecticut Impact Attenuation System (CIAS) crash cushion (Operational) |
No PDF version is available |
No Text version is available |
CC-06 |
10/31/1986 |
|
Energy Absorption Systems, Inc. |
GREAT with Hex-Foam II crash cushion (Operational) |
No PDF version is available |
No Text version is available |
CC-05 |
7/23/1986 |
|
Syro Steel Co. |
Vehicle Attenuating Terminal (VAT) (Experimental) [see CC-8] |
No PDF version is available |
No Text version is available |
CC-04 |
1/8/1986 |
|
Energy Absorption Systems, Inc |
TREND rigid barrier terminal (experimental) |
No PDF version is available |
No Text version is available |
CC-03 |
1/7/1986 |
|
----- |
Eccentric Loader guardrail terminal (Experimental) (FHWA Tech. Advisory) |
No PDF version is available |
No Text version is available |
CC-02 |
10/1/1984 |
|
Syro Steel Co |
Controlled Releasing Terminal (CRT) (Experimental) (FHWA Bulletin) |
No PDF version is available |
No Text version is available |
CC-01 |
9/29/1983 |
|
Energy Absorption Systems, Inc |
SENTRE guardrail terminal (experimental) [see CC-10] |
No PDF version is available |
No Text version is available |