skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Standard Review Plan on Power Reactor Licensee Financial Qualifications and Decommissioning Funding Assurance (NUREG-1577, Rev. 1)

On this page:

Download complete document

The following links on this page are to documents in Adobe Portable Document Format (PDF). See our Plugins, Viewers, and Other Tools page for more information. For successful viewing of PDF documents on our site please be sure to use the latest version of Adobe.


Publication Information

Date Published: February 1999

U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice


Abstract

The NRC is issuing this final Standard Review Plan to describe the process it uses to review the financial qualifications and methods of providing decommissioning funding assurance required of power reactor licenses. A separate SRP was issued for the NRC's antitrust review responsibilities in 1997. This Standard Review Plan is being used as the basis for reviews as the electric utility industry moves from an environment of rate regulation toward greater competition. Although this final Standard Review Plan reflects current regulations and policy, and has been updated to reflect changes to the regulations resulting from responses to the Advance Notice of Proposed Rulemaking and the Draft Statement, it will be updated for any future initiatives. The NRC is concerned that rate deregulation and disaggregation resulting from various restructuring actions involving power reactor licensees could have adverse effects on the protection of public health and safety.

The NRC is publishing Revision 1 to NUREG-1577 to include footnote information omitted in the original version published February 1999.



Privacy Policy | Site Disclaimer
Friday, February 23, 2007