Nasa HomepageJohn F. Kennedy Space Center - Orbiter Vehicles

KSC Home Page Site Search FAQ's Site Survey Customer Forum NASA Centers Privacy Statement Headlines

Shuttle in Orbit Payload Doors Open
Shuttle Information  

History of the Space Shuttle

Orbiter Vehicles

Countdown OnLine

Shuttle Launch Assessment  

Integrated Launch Assessment

Shuttle Reference Manual

Approach and Landing Tests  

Shuttle Mission Archive

Shuttle Mission Chronology

Shuttle Mission Summaries 

Click here for the JSC Shuttle Approach and Landing Test Image server.

Approach & Landing Test Logo

Enterprise(OV-101)


 

Background

 

Enterprise, the first Space Shuttle Orbiter, was originally to be named Constitution (in honor of the U.S. Constitution's Bicentennial). However, viewers of the popular TV Science Fiction show Star Trek started a write-in campaign urging the White House to rename the vehicle to Enterprise. Designated, OV-101, the vehicle was rolled out of Rockwell's Air Force Plant 42, Site 1 Palmdale California assembly facility on Sept. 17, 1976. On Jan. 31, 1977, it was transported 36 miles overland from Rockwell's assembly facility to NASA's Dryden Flight Research Facility at Edwards Air Force Base for the approach and landing test program.

The nine-month-long ALT program was conducted from February through November 1977 at the Dryden Flight Research Facility and demonstrated that the orbiter could fly in the atmosphere and land like an airplane, except without power-gliding flight.

In the day-to-day world of Shuttle operations and processing, Space Shuttle orbiters go by a more prosaic designation. Atlantis is commonly referred to as OV-104, for Orbiter Vehicle-104. Empty Weight was 151,315 lbs at rollout and 171,000 lbs with main engines installed.

Two NASA astronaut crews-Fred Haise and Gordon Fullerton and Joe Engle and Dick Truly-took turns flying the 150,000-pound spacecraft to free-flight landings.

The ALT program involved ground tests and flight tests. The ground tests included taxi tests of the 747 shuttle carrier aircraft with the Enterprise mated atop the SCA to determine structural loads and responses and assess the mated capability in ground handling and control characteristics up to flight takeoff speed. The taxi tests also validated 747 steering and braking with the orbiter attached. A ground test of orbiter systems followed the unmanned captive tests. All orbiter systems were activated as they would be in atmospheric flight. This was the final preparation for the manned captive flight phase.

Five captive flights of the Enterprise mounted atop the SCA with the Enterprise unmanned and Enterprise's systems inert were conducted to assess the structural integrity and performance handling qualities of the mated craft.

Three manned captive flights that followed the five captive flights included an astronaut crew aboard the orbiter operating its flight control systems while the orbiter remained perched atop the SCA. These flights were designed to exercise and evaluate all systems in the flight environment in preparation for the orbiter release (free) flights. They included flutter tests of the mated craft at low and high speed, a separation trajectory test and a dress rehearsal for the first orbiter free flight.

In the five free flights the astronaut crew separated the spacecraft from the SCA and maneuvered to a landing at Edwards Air Force Base. In the first four such flights the landing was on a dry lake bed; in the fifth, the landing was on Edwards' main concrete runway under conditions simulating a return from space. The last two free flights were made without the tail cone, which is the spacecraft's configuration during an actual landing from Earth orbit. These flights verified the orbiter's pilot-guided approach and landing capability; demonstrated the orbiter's subsonic terminal area energy management autoland approach capability; and verified the orbiter's subsonic airworthiness, integrated system operation and selected subsystems in preparation for the first manned orbital flight. The flights demonstrated the orbiter's ability to approach and land safely with a minimum gross weight and using several center-of-gravity configurations.

For all of the captive flights and the first three free flights, the orbiter was outfitted with a tail cone covering its aft section to reduce aerodynamic drag and turbulence. The final two free flights were without the tail cone, and the three simulated space shuttle main engines and two orbital maneuvering system engines were exposed aerodynamically.

The final phase of the ALT program prepared the spacecraft for four ferry flights. Fluid systems were drained and purged, the tail cone was reinstalled, and elevon locks were installed. The forward attachment strut was replaced to lower the orbiter's cant from 6 to 3 degrees. This reduces drag to the mated vehicles during the ferry flights.

After the ferry flight tests, OV-101 was returned to the NASA hangar at the Dryden Flight Research Facility and modified for vertical ground vibration tests at the Marshall Space Flight Center, Huntsville, Ala.

On March 13, 1978, the Enterprise was ferried atop the SCA to NASA's Marshall Space Flight Center, where it was mated with the external tank and solid rocket boosters and subjected to a series of vertical ground vibration tests. These tested the mated configuration's critical structural dynamic response modes, which were assessed against analytical math models used to design the various element interfaces.

These were completed in March 1979. On April 10, 1979, the Enterprise was ferried to the Kennedy Space Center. mated with the external tank and solid rocket boosters and transported via the mobile launcher platform to Launch Complex 39-A. At Launch Complex 39-A, the Enterprise served as a practice and launch complex fit-check verification tool representing the flight vehicles.

It was ferried back to NASA's Dryden Flight Research Facility on Aug. 16, 1979, and then returned overland to Rockwell's Palmdale final assembly facility on Oct. 30, 1979. Certain components were refurbished for use on flight vehicles being assembled at Palmdale. The Enterprise was then returned overland to the Dryden Flight Research Facility on Sept. 6, 1981.

During May and June of 1983, Enterprise was ferried to the Paris, France, Air Show, as well as to Germany, Italy, England and Canada, and was returned to the Dryden Flight Research Facility.

In the April-October 1984 time period, Enterprise was ferried to Vandenberg Air Force Base in California and to Mobile, Ala. From there it was taken by barge to New Orleans, La., for the United States 1984 World's Fair.

In November 1984 it was ferried to Vandenberg Air Force Base and used as a practice and fit-check verification tool. On May 24, 1985, Enterprise was ferried from Vandenberg Air Force Base to NASA's Dryden Flight Research Facility.

On Sept. 20, 1985, Enterprise was ferried from Dryden Flight Research Facility to the Kennedy Space Center in Florida. On Nov. 18, 1985, Enterprise was ferried from the Kennedy Space Center to Dulles Airport, Washington, D.C., and became the property of the Smithsonian Institution. The Enterprise was built as a test vehicle and is not equipped for space flight.

Following in the Enterprise's, the orbiter Columbia was created and it became the first Space Shuttle to fly into Earth orbit in 1981. Four sister ships joined the fleet over the next 10 years: Challenger, arriving in 1982 but destroyed four years later; Discovery, 1983; Atlantis, 1985; and Endeavour, built as a replacement for Challenger, 1991.

In the day-to-day world of Shuttle operations and processing, Space Shuttle orbiters go by a more prosaic designation. Enterprise is commonly referred to as OV-101, for Orbiter Vehicle-101.

 

Construction Milestones

 

July 26, 1972
Contract Award

June 4, 1974
 Start structural assembly of Crew Module

August 26, 1974
 Start structural assembly of aft-fuselage

May 23, 1975 
Wings arrive at Palmdale from Grumman

August 24, 1975 
Start of Final Assembly

March 12, 1975 
Completed final assembly

September17, 1976
Rollout from Palmdale

January 31, 1977
Overland transport from Palmdale to Edwards

April 10, 1979
Delivery to Kennedy Space Center

 

Enterprise's Flights

 

Taxi Tests

February 15, 1977 (Max speed 89 Mph) February 15, 1977 (Max speed 140 Mph) February 15, 1977 (Max speed 157 Mph)    
 
Captive-Inactive Flights
February 18, 1977 February 22, 1977 February 25, 1977 February 28, 1977 March 02, 1977
 
Captive-Active Flights
June 18, 1977 June 28, 1977 July 26, 1977    
 
Free Flights
August 12, 1977  September 13, 1977  August 23, 1977 October 12, 1977 October 26, 1977
 
KSC Home Page Site Search FAQ's Site Survey Customer Forum NASA Centers Privacy Statement Headlines
 

Page Last Revised

Page & Curator Information

10/03/2000

Curator: Kay Grinter (kay.grinter-1@jbosc.ksc.nasa.gov)
Web Development: JBOSC Web Development Team
A Service of the NASA/KSC External Relations and Business Development Directorate
JoAnn H. Morgan, Director