skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Operating Reactor Oversight
About Reactor Oversight
Inspection Basics
Performance Assessment Basics
Enforcement Basics
Detailed ROP Description
ROP Program Documents
Recent Results
Reactor Oversight Process (ROP)
Inspection Findings Summary
Performance Indicator Summary
Action Matrix Summary
Inspection Reports
Assessment Reports and Inspection Plan
Industry Trends
Background
Pilot Program
Initial Implementation Evaluation Panel

Pilot Program

The NRC tested the revised reactor oversight process (ROP) during a six month pilot program at 13 plants at 9 sites across the country, beginning in June 1999.  The plants represented a cross section of the nuclear industry, featuring different plant designs and varying levels of performance. In this program, utilities voluntarily collected performance indicator data and reported it to the NRC, and the NRC inspected and assessed the plants the plants using the new oversight process.  In addition, the NRC took appropriate enforcement action using the new enforcement policy guidelines.

The pilot program was intended to test how effectively the revised ROP worked and to identify possible problems.  The program measured the resources required by the NRC and by the industry to implement the new system.  A panel of senior NRC managers and external stakeholders assessed the pilot program for readiness for full implementation, and documented their conclusions in the Pilot Program Evaluation Panel final report .  Based on lessons learned from the pilot, the NRC made revisions to the process before extending the oversight process to all commercial nuclear power plants in April 2000.  The NRC staff reported the results of the pilot program to the Commission in SECY-00-049, "Results of the Revised Reactor Oversight Process Pilot Program" (html), (pdf); the Commission approved the staff's recommendation to implement the revised ROP for all plants in SRM for SECY-00-049 (html). The plants in the pilot program are listed below.

To top of page

Region I

Region III

Hope Creek
Public Service Electric & Gas Co.
Prairie Island 1 and 2
Northern States Power Co.
Salem 1 and 2
Public Service Electric & Gas Co.
Quad Cities 1 and 2
Commonwealth Edison Co.
FitzPatrick
N. Y. Power Authority

Region II

Region IV

Shearon Harris
Carolina Power and Light Co.
Ft. Calhoun
Omaha Public Power District
Sequoyah 1 and 2
Tennessee Valley Authority
Cooper
Nebraska Public Power District

To top of page



Privacy Policy | Site Disclaimer
Thursday, March 08, 2007