Home > Electronic
Reading Room > Document
Collections > ASLBP > 2006 Proceedings
Atomic Safety and Licensing Board Panel (ASLBP) - 2006 Proceedings
Documents pertaining to the proceedings of the Atomic Safety and Licensing Board Panel (ASLBP).
On this page:
The following links on this page are to documents in our Agencywide
Documents Access and Management System (ADAMS). ADAMS documents are provided
in either Adobe Portable Document Format (PDF) or Tagged Image File Format
(TIFF).
To obtain free viewers for displaying these formats, see our Plugins,
Viewers, and Other Tools. If you have problems
with viewing or printing documents from ADAMS, please contact the Public
Document
Room staff.
Reactors, Materials and Other
Date(s) |
Proceeding/Event |
Reference |
June 26 and 27, 2006 |
Entergy Nuclear Vermont Yankee, L.L.C. and Entergy Nuclear Operations, Inc.
(Vermont Yankee Nuclear Power Station)
Docket No. 50-271-OLA
Limited Appearance Sessions |
Notice |
July 6 and 7, 2006 |
Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.
(Pilgrim Nuclear Power Station)
Docket No. 050-293-LR
Oral Argument and Limited Appearance Sessions |
Order and Notice |
July 18, 2006 |
U.S. Department of the Army
Jefferson Proving Ground
Docket No. 40-8838-MLA
Limited Appearance Sessions
|
Notice |
August 1 and 2, 2006 |
Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations,
Inc.
(License Renewal)
Docket No. 50-271-LR
Oral Arguments |
Notice |
August 28, 2006 |
System Energy Resources, Inc.
(Early Site Permit for Grand Gulf ESP Site)
Docket No. 52-009-ESP
Limited Appearance Session |
Notice |
September 6, 2006 |
Oral Argument - David Geisen
Docket No. IA-05-052
Oral Arguments |
Notice |
September 12 to
15, 2006 |
Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc.,
Vermont Yankee Nuclear Power Station
(Operating License Amendment)
Docket No. 50-271-OLA
Evidentiary Hearing |
Order and Notice |
November 7, 2006 |
Exelon Generation Company, LLC
(Early Site Permit for Clinton ESP Site)
Docket No. 52-007-ESP
Mandatory Hearing |
Notice |
November 8, 2006 |
Exelon Generation Company, LLC
(Early Site Permit for Clinton ESP Site)
Docket No. 52-007-ESP
Oral Limited Appearance Statement Session |
Notice |
November 14, 2006 |
Oral Argument - David Geisen
Docket No. IA-05-052
Oral Arguments |
Notice |
November 29, 2006 |
System Energy Resources, Inc.
(Early Site Permit for Grand Gulf Site)
Docket No. 52-009-ESP
Mandatory Hearing |
Notice |
High-Level Waste
None at this time.
|