April 14, 2000

Previous April Next

Sun

Mon

Tues

Wed

Thur

Fri

Sat

            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 A | B A | B A | B 27 28 29
30            

MISSION: STS-101 -- 3rd ISS Flight (2A.2a) - SPACEHAB DM
VEHICLE Atlantis/OV-104
LOCATION Orbiter Processing Facility bay 3
TARGET KSC LAUNCH DATE/TIME April 24, 2000 at about 4:15 p.m.
TARGET KSC LANDING DATE/TIME May 4, 2000 at about 12:51 p.m.
LAUNCH WINDOW 5 minutes
MISSION DURATION 9 days, 20 hours and 36 minutes
CREW Halsell, Horowitz, Weber, Williams, Voss, Helms, Usachev
ORBITAL ALTITUDE and INCLINATION 173 nautical miles/51.6 degrees
Shuttle Processing Note
With Atlantis' rudder/speed brake power drive unit now replaced, preliminary tests indicate a successful change-out. Tomorrow, engineers will confirm that Shuttle Atlantis' entire hydraulic system is functioning normally with a frequency response test of the orbiter's aerosurfaces and main engines. Review of the test data will conclude early next week.

Yesterday, workers completed efforts to replace the hydraulic fluid discharge hose on auxiliary power unit No.1 and the electronics box in the orbiter aft compartment. Sunday afternoon, engineers will perform a hotfire test of the APU. Managers have decided to replace a gaseous nitrogen quick disconnect on APU No. 2 next week as well. With a hypergolic pressure test already scheduled as part of standard launch preparations next week, no significant impact to the schedule is expected. Shuttle engineers continue to evaluate the two minor liquid hydrogen line dings. Preliminary analysis suggests that the lines will be acceptable for flight.

SPACEHAB early stow operations are complete and flight crew equipment stowage begins Monday. Next week, engineers begin preparations in the Launch Control Center to pickup the 43-hour launch countdown at 7 p.m. on April 21.

 

For automatic e-mail subscriptions to these Shuttle status reports or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.

KSC Home Page Site Search FAQ's Site Survey Customer Forum NASA Centers Privacy Statement Headlines

Page Last Revised

Page & Curator Information

09/22/2000

Curator: Kay Grinter (Kay.Grinter-1@ksc.nasa.gov) -- InDyne, Inc./