skip navigational linksDepartment of Labor Seal U.S. Department of Labor
Mine Safety and Health Administration
Protecting Miners' Safety and Health Since 1978
Photos representing the mining workforce
 www.msha.gov
Find It! in DOL | Compliance Assistance |    
[Federal Register: December 29, 2004 (Volume 69, Number 249)]
[Notices]
[Page 78046-78047]

-----------------------------------------------------------------------

DEPARTMENT OF LABOR
Mine Safety and Health Administration

Fee Adjustments for Testing, Evaluation, and Approval of Mining Products

AGENCY: Mine Safety and Health Administration (MSHA), Labor.

ACTION: Notice of fee adjustments.

-----------------------------------------------------------------------

SUMMARY: This notice revises our [MSHA Approval and Certification Center (A&CC)] user fees. Fees compensate us for the costs that we incur for testing, evaluating, and approving certain products for use in underground mines. We based the 2005 fees on our actual expenses for fiscal year 2004. The fees reflect changes both in our approval processing operations and in our costs to process approval actions.

DATES: This fee schedule is effective from January 1, 2005, through December 31, 2005.

FOR FURTHER INFORMATION CONTACT: Steven J. Luzik, Chief, Approval and Certification Center (A&CC), 304-547-2029 or 304-547-0400.

SUPPLEMENTARY INFORMATION:

Background

     On May 8, 1987 (52 FR 17506), we published a final rule, 30 CFR part 5--Fees for Testing, Evaluation, and Approval of Mining Products. The rule established specific procedures for calculating, administering, and revising user fees. We have revised our fee schedule for 2004 in accordance with the procedures of that rule and include this new fee schedule below. For approval applications postmarked before January 1, 2005, we will continue to calculate fees under the previous (2004) fee schedule, published on December 30, 2003.

Fee Computation

     In general, we computed the 2005 fees based on fiscal year 2004 data. We calculated a weighted-average, direct cost for all the services that we provided during fiscal year 2004 in the processing of requests for testing, evaluation, and approval of certain products for use in underground mines. From this cost, we calculated a single hourly rate to apply uniformly across all of the product approval categories during 2005.

     Dated: December 22, 2004.
David G. Dye,
Acting Assistant Secretary for Mine Safety and Health.

FEE SCHEDULE EFFECTIVE JANUARY 1, 2005
(Based on FY 2004 data)

------------------------------------------------------------------------
                                                             HOURLY RATE
                        ACTION TITLE                             ($)
------------------------------------------------------------------------
Fees for Testing, Evaluation, and Approval of all Mining              66
 Products \1\..............................................
Retesting for Approval as a Result of Post-Approval Product
 Audit \2\.................................................
------------------------------------------------------------
                   30 CFR PART 15--EXPLOSIVES TESTING
------------------------------------------------------------------------
Permissibility Tests for Explosives:
    Weigh-in...............................................          462
    Physical Exam: First size..............................          325
    Chemical Analysis......................................        1,977
    Air Gap--Minimum Product Firing Temperature............          460
    Air Gap--Room Temperature..............................          352
    Pendulum Friction Test.................................          163
    Detonation Rate........................................          352
    Gallery Test 7.........................................        7,436
    Gallery Test 8.........................................        5,533
    Toxic Gases (Large Chamber)............................          805
Permissibility Tests for Sheathed Explosives:
    Physical Examination...................................          128
    Chemical Analysis......................................        1,044
    Gallery Test 9.........................................        1,944
    Gallery Test 10........................................        1,944
    Gallery Test 11........................................        1,944
    Gallery Test 12........................................        1,944
    Drop Test..............................................          648
    Temperature Effects/Detonation.........................          672
    Toxic Gases............................................         580
------------------------------------------------------------------------
    \1\ Full approval fee consists of evaluation cost plus applicable test costs.
    \2\ Fee based upon the approval schedule in effect at the time of retest.
     Note: When the nature of the product requires that we test and evaluate it at a location other than our premises, you must reimburse us for the traveling, subsistence, and incidental expenses of our representative in accordance with standardized government travel regulations. This reimbursement is in addition to the fees charged for evaluation and testing.

[FR Doc. 04-28452 Filed 12-28-04; 8:45 am]

BILLING CODE 4510-43-P



Back to Top   Back to Top www.msha.gov www.dol.gov

Frequently Asked Questions | Freedom of Information Act | Customer Survey
Accessibility | Privacy & Security Statement | Disclaimers

Mine Safety and Health Administration (MSHA)
1100 Wilson Boulevard, 21st Floor
Arlington, VA 22209-3939
Phone:    (202) 693-9400
Fax-on-demand: (202) 693-9401
Technical (web) questions: Webmaster
On-line Filing Help: MSHAhelpdesk@dol.gov
or call (877) 778-6055

Contact Us