skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
NRC Seal
NRC NEWS
U.S. NUCLEAR REGULATORY COMMISSION
Office of Public Affairs Telephone: 301/415-8200
Washington, DC 20555-0001 E-mail: opa@nrc.gov
www.nrc.gov

No. 01-042 April 18, 2001

NRC ADVISORY COMMITTEE ON REACTOR SAFEGUARD TO MEET IN ROCKVILLE, MARYLAND, MAY 10 - 12


The Nuclear Regulatory Commission's Advisory Committee on Reactor Safeguards (ACRS) has scheduled a meeting in Rockville, Maryland, on May 10-12.

The meeting, which is open to the public, will be held in Room T-2B3 of the agency's Two White Flint North building, at 11545 Rockville Pike, beginning at 8:15 a.m. on May 10, and at 8:30 a.m. on May 11 and 12. The complete agenda is attached.

Those who wish to make oral or written statements, or seek additional information on the meeting or changes to the agenda, should contact James Lyons, at 301-415-7371.ACRS meeting notices, transcripts and letters are available on the internet, at http://www.nrc.gov/ACRSACNW/ .


ACRS Agenda

THURSDAY, MAY 10, 2001

8:15 A.M. - 8:20 A.M.: Opening Remarks by the ACRS Chairman (Open) - The ACRS Chairman will make remarks regarding the conduct of the meeting.

8:20 A.M. - 10:20 A.M.: Final Review of the License Renewal Application for Arkansas Nuclear One (ANO), Unit 1 (Open) - The Committee will hear presentations by and hold discussions with representatives of the NRC staff and Entergy Operations, Inc. regarding the license renewal application for ANO, Unit 1 and the associated staff's Safety Evaluation Report.

10:30 A.M. - 12:30 P.M.: Members Attendance at the Commission Meeting on the Office of Nuclear Regulatory Research Programs and Performance (Open) - Drs. Powers and Wallis are scheduled to participate in this meeting which will be held in the Commissioners' Conference Room, One White Flint North. Other members will be attending this meeting as observers.

1:30 P.M. - 3:30 P.M.: Draft Final Safety Evaluation Report for the South Texas Project Nuclear Operating Company (STPNOC) Exemption Request (Open) - The Committee will hear presentations by and hold discussions with representatives of the NRC staff regarding the staff's draft final Safety Evaluation Report for the STPNOC exemption request to exclude certain components from the scope of special treatment requirements required by NRC regulations.

3:50 P.M. - 4:45 P.M.: Discussion of General Design Criteria (Open) - The Committee will hear a presentation by and hold discussions with Mr. Sorensen, ACRS Senior Fellow, regarding his views on risk-informing the General Design Criteria that are included in Appendix A to 10 CFR Part 50.

4:45 P.M. - 7:00 P.M. : Discussion of Proposed ACRS Reports (Open) - The Committee will discuss proposed ACRS reports on matters considered during this meeting, as well as a proposed ACRS report on Management Directive 6.4 associated with the revised Generic Safety Issue Process.

FRIDAY, MAY 11, 2001

8:30 A.M. - 8:35 A.M.: Opening Remarks by the ACRS Chairman (Open) - The ACRS Chairman will make remarks regarding the conduct of the meeting.

8:35 A.M. - 10:00 A.M.: Discussion of Topics for Meeting with the NRC Commissioners (Open) - The Committee will discuss topics scheduled for its meeting with the NRC Commissioners.

10:30 A.M. - 12:30 P. M.: Meeting with the NRC Commissioners (Open) - The Committee will meet with the NRC Commissioners, Commissioners' Conference Room, One White Flint North to discuss: proposed framework for risk-informed changes to 10 CFR Part 50; South Texas Project Exemption Request; Issues Associated with Thermal-Hydraulic Codes; Status Report on Steam Generator Tube Integrity Issues; and Status of ACRS Activities Associated with License Renewal.

1:30 P.M. - 2:45 P.M.: Spent Fuel Accident Risk at Decommissioning Nuclear Power Plants (Open) The Committee will hear presentations by and hold discussions with representatives of the NRC staff regarding the proposed options paper on this matter.

3:00 P.M. - 4:30 P.M.: Risk-Based Performance Indicators (Open) - The Committee will hear presentations by and hold discussions with representatives of the NRC staff regarding the staff's draft document entitled,"Risk-Based Performance Indicators: Results of Phase 1 Development," and related matters.

4:50 P.M. - 5:30 P.M.: Future ACRS Activities/Report of the Planning and Procedures Subcommittee (Open) - The Committee will discuss the recommendations of the Planning and Procedures Subcommittee regarding items proposed for consideration by the full Committee during future meetings. Also, it will hear a report of the Planning and Procedures Subcommittee on matters related to the conduct of ACRS business, and organizational and personnel matters relating to the ACRS.

5:30 P.M. - 5:45 P.M.: Reconciliation of ACRS Comments and Recommendations (Open) - The Committee will discuss the responses from the NRC Executive Director for Operations (EDO) to comments and recommendations included in recent ACRS reports and letters. The EDO responses are expected to be made available to the Committee prior to the meeting.

5:45 P.M. - 7:30 P.M.: Discussion of Proposed ACRS Reports (Open) - The Committee will discuss proposed ACRS reports.

SATURDAY, MAY 12, 2001

8:30 A.M. -12:30 P.M.: Proposed ACRS Reports (Open) - The Committee will continue its discussion of proposed ACRS reports.

12:30 P.M. - 1:00 P.M.: Miscellaneous (Open) - The Committee will discuss matters related to the conduct of Committee activities and matters and specific issues that were not completed during previous meetings, as time and availability of information permit.



Privacy Policy | Site Disclaimer
Thursday, February 22, 2007