skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
NRC Seal
NRC NEWS
U.S. NUCLEAR REGULATORY COMMISSION
Office of Public Affairs Telephone: 301/415-8200
Washington, DC 20555-0001 E-mail: opa@nrc.gov
www.nrc.gov

No. 06-040 March 22, 2006

NRC ANNOUNCES OPPORTUNITY TO REQUEST A HEARING ON APPLICATION TO RENEW OPERATING LICENSE FOR PILGRIM NUCLEAR POWER STATION
Printable Version PDF Icon


The Nuclear Regulatory Commission is announcing the opportunity to request a hearing on an application to renew the operating license for the Pilgrim Nuclear Power Station for an additional 20 years.

The Pilgrim nuclear plant is a boiling water reactor located on the western shore of Cape Cod Bay in the town of Plymouth, Mass. Entergy Nuclear Operations, Inc., submitted the renewal application Jan. 25. The current operating license for Pilgrim Nuclear Power Station expires on June 8, 2012.

The NRC staff has determined that the application contains sufficient information for the agency to formally "docket," or file, the application and begin its technical review. Docketing the application does not preclude requesting additional information as the review proceeds; nor does it indicate whether the Commission will grant the application.

A notice of opportunity to request a hearing will be published soon in the Federal Register. The deadline for requesting a hearing is 60 days after publication of the notice. Petitions may be filed by anyone whose interest may be affected by the license renewal and who wishes to participate as a party in the proceeding. Information regarding the opportunity to request a hearing was disseminated by NRC staff to members of the public during a public information session conducted in Plymouth on March 8.

A request for hearing and a petition for leave to intervene must be filed with the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, Attention: Rulemaking and Adjudications Staff. Requests may also be submitted by facsimile to (301) 415-1101 or e-mail to HEARINGDOCKET@nrc.gov. A copy should also be submitted to the NRC Office of General Counsel, by facsimile to (301) 415-3725 or e-mail to OGCMailCenter@nrc.gov.

Information about the license renewal process can be found on the NRC Web site at http://www.nrc.gov/reactors/operating/licensing/renewal.html. The Pilgrim renewal application is online at http://www.nrc.gov/reactors/operating/licensing/renewal/applications/pilgrim.html. An NRC review schedule for the Pilgrim Nuclear Power Station will also be posted on the NRC Web site which will identify the deadline for requesting a hearing. This information can also be found in the agency’s ADAMS document database under ML060800745.



Privacy Policy | Site Disclaimer
Thursday, February 22, 2007