skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
NRC Seal
NRC NEWS
U.S. NUCLEAR REGULATORY COMMISSION

Office of Public Affairs, Region II
61 Forsyth Street SW, Atlanta, GA 30303
www.nrc.gov


No. II-07-030   May 11, 2007
CONTACT: Ken Clark (404) 562-4416
Roger D. Hannah (404) 562-4417
E-mail: opa2@nrc.gov

NRC TO DISCUSS 2006 PERFORMANCE AT ROBINSON NUCLEAR PLANT
Printable Version


The Nuclear Regulatory Commission staff is scheduled to meet with Progress Energy officials on Monday, May 21, to discuss the agency’s assessment of safety performance last year at the Robinson nuclear power plant, located near Hartsville, S.C.

The meeting, which is open to the public, is scheduled to begin at 2:00 p.m. in the Hartsville Memorial Library, 147 W. College Avenue in Hartsville. The NRC staff will present the results of the assessment and be available to respond to questions or comments from the public before the close of the meeting.

“The NRC continually reviews the performance of the Robinson plant and the nation’s other commercial nuclear power facilities,” NRC Region II Administrator William Travers said. “This meeting is a chance for us to discuss that safety performance with the company, with local officials and with people living near the plant.”

A letter sent from the NRC Region II Office to plant officials addresses the performance of the plant during the period and will serve as the basis for the meeting discussion. It is available on the NRC web site at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/rob_2006q4.pdf.

The NRC uses color-coded inspection findings and performance indicators to assess nuclear plant performance. The colors start with “green” and then increase to “white,” “yellow” or “red,” depending on the safety significance of the issues involved.

The NRC said the Robinson plant operated safely during 2006 with all inspection findings being “green,” or of very low safety significance, and all performance indicators also indicating performance at levels requiring no additional NRC oversight.

As a result, the NRC plans to conduct only routine baseline inspections at the plant for the rest of 2006. The NRC staff will also conduct several non-routine inspections, including the independent spent fuel storage facility and the containment emergency re-circulation sump temporary instruction. Current information for the Robinson plant is available on the NRC web site at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/ROB2/rob2_chart.html.


NRC news releases are available through a free listserv subscription at the following Web address: http://www.nrc.gov/public-involve/listserver.html. The NRC Home Page at www.nrc.gov also offers a Subscribe to News link in the News & Information menu. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web Site.



Privacy Policy | Site Disclaimer
Thursday, December 27, 2007