skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

NRC Seal NRC NEWS

U. S. NUCLEAR REGULATORY COMMISSION

OFFICE OF PUBLIC AFFAIRS, REGION II

61 Forsyth Street, Suite 23T85, Atlanta, GA 30303

CONTACT: Ken Clark (Phone: 404-562-4416, E-mail: kmc2@nrc.gov )
Roger Hannah (Phone 404-562-4417, E-mail: rdh1@nrc.gov )

No: Region II-97-42

June 6, 1997

NRC SCHEDULES DESIGN INSPECTION EXIT MEETING AT ROBINSON PLANT

The Nuclear Regulatory Commission staff has scheduled a public exit meeting at Carolina Power & Light's Robinson nuclear power plant to discuss the results of a special NRC design inspection at the plant. That meeting will be Thursday, June 12 at 1:30 p.m. in the Information Center at the plant.

The design inspection began in mid-April and concluded May 23. The inspection was led by Ed Kleeh from the NRC's headquarters office in Rockville, Maryland and included other inspectors working under contract to the NRC. Similar inspections have been and will be performed over the next two years at other plants.

The design inspections focus on reviews of the plants' original design and configuration, and conformance with the licensees' safety analysis report. Each inspection team is made up of engineers from NRC and design specialists from either Stone & Webster or Sargent & Lundy, architect/engineering firms with which NRC has contracted.

The NRC planned these inspections after recent findings that licensees at the Millstone plant in Connecticut and at other facilities routinely performed full-core offloads during refueling outages without performing the necessary safety evaluation. It also was discovered that other facilities' actual as-built configuration or operations were inconsistent with the design basis information described in their licenses. Special care is taken to avoid having inspections performed by representatives of the architectural/engineering firm which originally designed a power plant.

During the Robinson inspection, no issues were identified that would raise an immediate operability question. A written report on the inspection is expected in July.

###