skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Regulatory Effectiveness of the Anticipated Transient Without Scram Rule (NUREG-1780)

On this page:

Download complete document

The following links on this page are to documents in Adobe Portable Document Format (PDF). See our Plugins, Viewers, and Other Tools page for more information. For successful viewing of PDF documents on our site please be sure to use the latest version of Adobe.


Publication Information

Manuscript Completed: April 2001
Date Published: September 2003

Prepared by
W.S. Raughley, G.F. Lanik

Division of Systems Analysis and Regulatory Effectiveness
Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice


Abstract

The U.S. Nuclear Regulatory Commission’s Office of Nuclear Regulatory Research is reviewing selected regulations to determine if the requirements are achieving the desired outcomes. This initiative is part of an evolving program to make NRC activities and decisions more effective, efficient, and realistic. The goal of this evaluation is to determine whether the anticipated transient without scram (ATWS) rule and the recommendations issued with it were effective. The effectiveness of the ATWS rule was determined by comparing regulatory expectations to outcomes. The report concluded that the ATWS rule was effective in reducing ATWS risk and that the cost of implementing the rule was reasonable. However, uncertainties in reactor protection system reliability and mitigative capability may warrant further attention to ensure the expected levels of safety are maintained.



Privacy Policy | Site Disclaimer
Friday, February 23, 2007