skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Basis Document for Large Early Release Frequency (LERF) Significance Determination Process (SDP) Inspection Findings that May Affect LERF (NUREG-1765)

On this page:

Download complete document

The following links on this page are to documents in Adobe Portable Document Format (PDF). See our Plugins, Viewers, and Other Tools page for more information. For successful viewing of PDF documents on our site please be sure to use the latest version of Adobe.

 


Publication Information

Manuscript Completed: November 2002
Date Published: December 2002

Division of Risk Analysis and Applications
Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, D.C. 20555-0001

Availability Notice


Abstract

A significance determination process (SDP) is proposed that assigns risk characterization to inspection findings based on large early release frequency (LERF) considerations. This process is designed to interface directly with the SDP that is based on findings related to those structures, systems, and components (SSCs) that can influence the core damage frequency (CDF). The proposed LERF-based SDP will capture findings for those SSCs that can influence CDF determinations but which can also influence LERF. In addition, the proposed LERF-based SDP approach will address findings related to SSCs that do not influence CDF determinations but which can impact the containment function.



Privacy Policy | Site Disclaimer
Wednesday, March 07, 2007