skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Adjudication (Hearings)
Access to Hearing Documents for Parties and the Public
Reactors, Materials and Other Hearings
High-Level Waste Hearings
Adjudicatory Process
The Hearing Process
Types of Hearings
Public Involvement in Hearings
Hearing Opportunities
Hearing Decisions
Overview for Using the Electronic Hearing Docket
ASLBP and Commission Responsibilities
ASLBP Responsibilities
Commission Adjudicatory Responsibilities
Related Information
Understanding 10 CFR Part 2: Rules of Practice
NRC Staff Practice and Procedure Digest

System Notice

The High Level Waste EHD system is operating normally.

High-Level Waste Hearings

This section provides links to the official docket maintained by the Office of the Secretary in accordance with the requirements of 10 CFR Part 2 (specifically Subpart J of Part 2) for the establishment of a docket for a potential proceeding on the application of the Department of Energy for a license to construct a geologic repository at Yucca Mountain, Nevada, for the storage of high level radioactive waste (HLW). Currently, the docket is in use for a pre-license application presiding officer (PAPO) proceeding, established to hear participant concerns regarding the availability of document material on the Licensing Support Network that arise in the pre-application stage. Additional links on this page are to guidance on the steps necessary for participation in the PAPO proceeding or the future HLW repository licensing proceeding. Links are also included on this page to resources that are essential to participation in the PAPO or HLW proceedings.

Electronic Filing Tools for Participants

Related Links



Privacy Policy | Site Disclaimer
Monday, March 17, 2008