DOE's License Application for a High-Level Waste Geologic Repository at Yucca Mountain

Aerial view of Yucca Mountain,�looking northwest, showing the desert environment. The proposed geologic repository would be located about 300 meters (1,000 feet) below the eastern slope of the mountain.
Who:   U.S. Department of Energy (DOE)

What:   DOE license application seeking authorization to construct a geologic repository

When:   June 3, 2008 (application submitted)

Where:   Yucca Mountain site in Nye County, Nevada (see map showing Location of Yucca Mountain)

Why:   The NRC will issue a construction authorization only if DOE can demonstrate that it can safely construct and operate the repository in compliance with established regulations.

On this page:

DOE License Application

Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.

Note: Portions of DOE's Yucca Mountain Geologic Repository license application were submitted with bookmarks, as well as hyperlinks to various reference documents (such as the Design Control Documents). However, those bookmarks and hyperlinks are currently inactive in the files that are publicly available through the links provided above. Nonetheless, the various reference documents may be obtained on DVD by contacting the staff of the NRC's Public Document Room.

To top of page

NRC Documents for Docketing and EIS Adoption Review

Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.

To top of page

NRC Docketing Review and Hearing Opportunity Schedule

Key Milestones Completion Date
(days after receipt of application)
Docketing Acceptance Review
 
Publication of Federal Register notice (FRN) announcing receipt and availability of DOE application
6/17/08
Publication of FRN announcing (1) NRC decision regarding docketing of the DOE application, and (2) NRC staff position regarding adoption of the DOE Environmental Impact Statement (EIS)
Within 95 days
Publication of FRN announcing opportunity for hearing
TBD
Deadline for filing petitions for intervention & contentions
60 days
after notice of
hearing opportunity

To top of page

Contacts

Contacts
Project Managers Brian Benney
David Misenhimer
Environmental Project Manager Christine Pineda
General Questions Contact for HLW Repository Safety
Press Questions Public Affairs Officer (301-415-8200)
To top of page

Related Information

To top of page



Privacy Policy | Site Disclaimer
Monday, September 08, 2008