skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Vermont Yankee Issues of Interest
Location of Spent Fuel Rod Segments
Vermont Yankee Power Uprate Application
Engineering Inspection
Inspection Findings
Fire in the Main Transformer
Public Meetings
Frequently Asked Questions

Public Meetings for Vermont Yankee Application

This page list, in chronological order, the notices, slides and summaries documenting the public meetings held concerning Vermont Yankee Power Uprate Application. To learn about future meetings, see our public meeting schedule page.

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Date
Description
12/16/2004

Meeting with the Vermont State Nuclear Advisory Panel to discuss the results of the NRC's special inspections. Brattleboro High School, 6 - 9 pm

11/09/2004

POSTPONED
Due to concerns regarding public safety from Vernon Town officials, the previously noticed meeting at Vernon Elementary School to present the results of NRC's Engineering Team Inspection has been postponed.

11/09/2004

POSTPONED

Due to concerns regarding public safety from Vernon Town officials, the previously noticed meeting at the Governor Hunt House in Vernon, VT to present the results of NRC's Special Inspection regarding two spent fuel rod pieces that were misplaced in the Vermont Yankee spent fuel pool has been postponed.
09/29/2004

Meeting with Entergy to discuss the steam dryer analysis associated with proposed extended power uprate.

07/21/2004 and 7/22/2004

Meeting with Entergy to discuss the steam dryer analysis associated with proposed extended power uprate.

06/28/2004

Briefing for the Vermont Public Service Board

03/31/2004

Category 3 Meeting - To present to the public information about the NRC's review of the Vermont Yankee power uprate application.

06/11/2003 Meeting with Vermont State Nuclear Advisory Panel Regarding NRC Reviews of Extended Power Uprates
10/30/2003

Meeting with Entergy on application

(To top of page)

 



Privacy Policy | Site Disclaimer
Tuesday, February 13, 2007