Accelerator Division Notification

Message Archive

  • Accelerator Operations
  • One-liners
  • Schedules

  • Accelerator Division
  • Operations weekly
  • Run Coordinator
  • Reports

  • Early Bird
  • Accelerator Division Home
    CD systems Notify application (restricted) (Ch13) Machine Logs
    Turn refreshing on Move links to bottom

    Collider Operations

    SC time = 14.6 / 33.0 Sep 15 2008-22:08:13
                  |                  
    3 3 3 3 3  3 3   
                D
    AreaCurrent StateLast State Change
    ComplexHigh Energy Physics
    ColliderLow BetaMon Sep 15 22:04:08 CDT 2008
    MainInjectorSmoothing for shots completeMon Sep 15 22:00:39 CDT 2008
    TevatronDry SqueezeMon Sep 15 21:17:40 CDT 2008
    PbarSourcePbar Shots to the RecyclerMon Sep 15 22:01:27 CDT 2008
    RecyclerShot setupMon Sep 15 21:59:13 CDT 2008
    Store#6420
    CDF0E30 (129.18)
    D0Lum0E30 (125.17)
    SDur13.72hrs
    MT0.0ppp
    TevKE980.22GEV
    TevDC0E13
    TevPR0E09
    TevPB0E09
    MC0.0ppp
    Stack17.48mA
    AccRt-2273.50mA/h
    ProdEff0E-6
    BNB1.17E16P/hr
    NuMI PWR161.98KW
    LINAC36.17 MA
    MIBeam38.65E12
    RBeam328.63E10
    Temp54.72degF (12.62 degC)
    NuMI30.31E12

    
    

    15 Sep 2008 21:58:54
    TeV dry squeeze
    Stacking.
    Beam to NuMI and MiniBooNE.
    
    


    Mail comments/problems to webmaster-ad@fnal.gov

    Security, Privacy, Legal