skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Event Notification Report for June 12, 2003




                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           06/11/2003 - 06/12/2003

                              ** EVENT NUMBERS **

39917  39918  39919  39920  39921  39922  39923  39924  39925  

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39917       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SAINT LUCIE              REGION:  2  |NOTIFICATION DATE: 06/11/2003|
|    UNIT:  [] [2] []                 STATE:  FL |NOTIFICATION TIME: 02:26[EDT]|
|   RXTYPE: [1] CE,[2] CE                        |EVENT DATE:        06/11/2003|
+------------------------------------------------+EVENT TIME:        01:30[EDT]|
| NRC NOTIFIED BY:  JOE HESSLING                 |LAST UPDATE DATE:  06/11/2003|
|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |MARK LESSER          R2      |
|10 CFR SECTION:                                 |                             |
|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     A/R        Y       22       Power Operation  |0        Hot Standby      |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| AUTOMATIC TURBINE TRIP/REACTOR TRIP DUE TO HIGH HIGH STEAM GENERATOR WATER   |
| LEVEL                                                                        |
|                                                                              |
| "On 06/11/03,  Unit 2 Reactor tripped via Turbine Trip due to high-high      |
| Steam Generator level.  All Control Rods fully inserted.  Unit stable in     |
| Mode 3 (Hot Standby).  Auxiliary Feedwater system was manually started and   |
| currently maintaining steam generator levels.  Investigation is in progress  |
| to determine initial cause for loss of feed to the 2A Steam Generator from   |
| its associated low power feedwater regulating valve."                        |
|                                                                              |
|                                                                              |
| Coming out of a refueling outage reactor power was at 30% when it was        |
| noticed that main feedwater regulating valves were oscillating.  Reactor     |
| power was reduced to 20% and the low power feedwater regulating valves were  |
| placed in service so testing of the main feedwater regulating valves could   |
| be performed.  During testing of the main feedwater regulating valves at     |
| approximately 22% reactor power low power feedwater flow to the 2A Steam     |
| Generator ceased.  The dual indications for the low power feedwater          |
| regulating valve indicated that the valve was open but Steam Generator 2A    |
| water level was decreasing.  Since main feedwater regulating valve was being |
| tested the 100% bypass low power feedwater regulating valve was opened.      |
| Steam Generator water level began to increase rapidly so the valve was       |
| closed.  2A Steam Generator level began to decrease so the 100% bypass low   |
| power feedwater regulating valve was reopened.  This time 2A Steam Generator |
| water level increase above 88% narrow range which caused an automatic        |
| turbine trip. Since reactor power was greater than 15% the reactor           |
| automatically tripped due to the turbine trip. All rods fully inserted into  |
| the core.  Since the reactor core had very little decay heat the main steam  |
| isolation valves were closed and both motor driven auxiliary feedwater pumps |
| were manually started. Motor Driven Auxiliary Feedwater Pumps and  Steam     |
| Generator PORVs  operation is maintaining the plant in a Hot Standby         |
| condition.  All emergency core cooling systems are fully operable and the    |
| emergency diesel generators are fully operable if needed.  The electrical    |
| grid is stable.  The licensee believes that the stem of the low power        |
| feedwater regulating valve separated from the valve which in turn caused the |
| valve to close while still having dual indication that the low power         |
| feedwater valve was open.                                                    |
|                                                                              |
| The NRC Resident Inspector was notified of this event by the licensee.       |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39918       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PILGRIM                  REGION:  1  |NOTIFICATION DATE: 06/11/2003|
|    UNIT:  [1] [] []                 STATE:  MA |NOTIFICATION TIME: 13:46[EDT]|
|   RXTYPE: [1] GE-3                             |EVENT DATE:        06/11/2003|
+------------------------------------------------+EVENT TIME:        08:10[EDT]|
| NRC NOTIFIED BY:  FRANK CLIFFORD               |LAST UPDATE DATE:  06/11/2003|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |CHRISTOPHER CAHILL   R1      |
|10 CFR SECTION:                                 |TERRY REIS           NRR     |
|ACOM 50.72(b)(3)(xiii)   LOSS COMM/ASMT/RESPONSE|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| INABILITY TO ACTIVATE EMERGENCY SIRENS DUE TO EQUIPMENT FAILURE              |
|                                                                              |
| "On June 11, 2003 at 0810 hours, the control room was notified that all      |
| Prompt Alert and Notification System (PANS) sirens were inoperable.  All     |
| necessary notifications to local towns and MEMA (Massachusetts Emergency     |
| Management Agency) have been made. A backup plan (route altering) is in      |
| place in the event of an emergency at Pilgrim station. It was determined     |
| that one of the sirens was transmitting a continuous radio signal to the     |
| remaining sirens, preventing actuation. The faulty siren was isolated from   |
| the system at 1125 hours."                                                   |
|                                                                              |
| The licensee informed both state and local agencies and the NRC resident     |
| inspector.                                                                   |
|                                                                              |
| This condition involving a different siren in the system occurred on         |
| 6/10/03.  See EN #39912.                                                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39919       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SUSQUEHANNA              REGION:  1  |NOTIFICATION DATE: 06/11/2003|
|    UNIT:  [1] [2] []                STATE:  PA |NOTIFICATION TIME: 14:07[EDT]|
|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        06/11/2003|
+------------------------------------------------+EVENT TIME:        12:17[EDT]|
| NRC NOTIFIED BY:  GORDON ROBINSON              |LAST UPDATE DATE:  06/11/2003|
|  HQ OPS OFFICER:  ARLON COSTA                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |CHRISTOPHER CAHILL   R1      |
|10 CFR SECTION:                                 |                             |
|ASHU 50.72(b)(2)(i)      PLANT S/D REQD BY TS   |                             |
|AINA 50.72(b)(3)(v)(A)   POT UNABLE TO SAFE SD  |                             |
|AINB 50.72(b)(3)(v)(B)   POT RHR INOP           |                             |
|AINC 50.72(b)(3)(v)(C)   POT UNCNTRL RAD REL    |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |98       Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| CONTROLLED PLANT TS SHUTDOWN DUE TO LOSS OF HVAC SYSTEM                      |
|                                                                              |
| "On 6/11/03 at 12:17, the 'A' Control Structure Chiller tripped.  The 'B'    |
| Control Structure Chiller was already inoperable for maintenance on the 'B'  |
| Chiller Fans.  With the loss of Control Structure HVAC System the ability to |
| maintain temperatures in various spaces including Relay rooms, Control Room  |
| Floor Cooling and Emergency Switchgear rooms was lost.  Units 1 and 2        |
| entered [Technical Specifications] TS 3.0.3 and a controlled shutdown of     |
| both units were commenced at 13:15.  The 'A' Chiller was restarted at 12:47  |
| and cooling was reestablished to the required areas, however the 'A' chiller |
| is not considered operable at this time.  The 'B' Chiller was placed in      |
| service and was declared operable at 13:20 [and the controlled shutdown of   |
| both units were terminated]."                                                |
|                                                                              |
| "This constitutes a Tech Spec required shutdown and requires a 4-hr ENS      |
| notification in accordance with 10 CFR 50.72(b)(2)(i).  The failure also     |
| requires an 8-hr ENS notification in accordance with 10 CFR                  |
| 50.72(b)(3)(v)(A-D) due to the loss of a safety function."                   |
|                                                                              |
| The licensee notified the NRC Resident Inspector.                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39920       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: POINT BEACH              REGION:  3  |NOTIFICATION DATE: 06/11/2003|
|    UNIT:  [1] [2] []                STATE:  WI |NOTIFICATION TIME: 14:42[EDT]|
|   RXTYPE: [1] W-2-LP,[2] W-2-LP                |EVENT DATE:        06/11/2003|
+------------------------------------------------+EVENT TIME:        12:45[CDT]|
| NRC NOTIFIED BY:  DON POPP                     |LAST UPDATE DATE:  06/11/2003|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |DAVID HILLS          R3      |
|10 CFR SECTION:                                 |                             |
|DDDD 73.71(b)(1)         SAFEGUARDS REPORTS     |                             |
|HFIT 26.73               FITNESS FOR DUTY       |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| SECURITY REPORT INVOLVING A PLANT SECURITY OFFICER                           |
|                                                                              |
| Discovery of criminal act involving individual granted access to the site.   |
| Immediate compensatory measures taken upon discovery. The licensee informed  |
| local law enforcement and the NRC resident inspector.  Contact the           |
| Headquarters Operations Officer for additional details.                      |
|                                                                              |
| *** UPDATE ON 6/11/03 AT 2029 FROM D. POPP TO A. COSTA ***                   |
|                                                                              |
| The non-licensed employee was determined to be under the influence of        |
| alcohol during a "for cause" test.  The individual's access to all NMC       |
| facilities has been revoked.  Contact the Headquarters Operations Officer    |
| for additional details.                                                      |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39921       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: GRAND GULF               REGION:  4  |NOTIFICATION DATE: 06/11/2003|
|    UNIT:  [1] [] []                 STATE:  MS |NOTIFICATION TIME: 14:49[EDT]|
|   RXTYPE: [1] GE-6                             |EVENT DATE:        05/22/2003|
+------------------------------------------------+EVENT TIME:        08:02[CDT]|
| NRC NOTIFIED BY:  JAMES OWENS                  |LAST UPDATE DATE:  06/11/2003|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |DAVID GRAVES         R4      |
|10 CFR SECTION:                                 |                             |
|AINV 50.73(a)(1)         INVALID SPECIF SYSTEM A|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |50       Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| INVALID ACTUATION AND VARIOUS SYSTEM ISOLATIONS DUE TO A FAILED RELAY        |
|                                                                              |
| "On May 22, 2003, at 0802 central time, while operating at 100 percent       |
| power, Grand Gulf Nuclear Station experienced an invalid actuation of the    |
| 'B' Containment, Drywell, and Auxiliary Building Isolation System. A failed  |
| relay caused a fuse to blow which resulted in actuation of the isolation     |
| logic for the 'B' Containment, Drywell, and Auxiliary Building Isolation     |
| System. This event resulted in isolation of the Plant Service Water (PSW),   |
| Plant Chilled Water (PCW), Drywell Chilled Water (DWCW), and Instrument Air  |
| (IA) to the Auxiliary Building. The PSW isolation caused loss of Component   |
| Cooling Water (CCW) in the Auxiliary Building and loss of Turbine Building   |
| Cooling Water. Reactor power was reduced to approximately 50 percent as a    |
| result of the loss of PSW."                                                  |
|                                                                              |
| The licensee informed the NRC resident inspector.                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Other Nuclear Material                           |Event Number:   39922       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  CONSOLE ENERGY INC                   |NOTIFICATION DATE: 06/11/2003|
|LICENSEE:  BUCHANAN MINE CONSOLIDATION COMPANY  |NOTIFICATION TIME: 15:12[EDT]|
|    CITY:  MAVISDALE                REGION:  2  |EVENT DATE:        06/04/2003|
|  COUNTY:                            STATE:  VA |EVENT TIME:             [EDT]|
|LICENSE#:  GENERAL               AGREEMENT:  N  |LAST UPDATE DATE:  06/11/2003|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |MARK LESSER          R2      |
|                                                |CHRISTOPHER CAHILL   R1      |
+------------------------------------------------+FRED BROWN           NMSS    |
| NRC NOTIFIED BY:  JOE RICHARD                  |ROBERTA WARREN       IAT     |
|  HQ OPS OFFICER:  ARLON COSTA                  |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|BLO1 20.2201(a)(1)(i)    LOST/STOLEN LNM>1000X  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| MISSING OR LOST GAUGE CONTAINING A RADIOACTIVE SOURCE                        |
|                                                                              |
| A Texas Nuclear Product pipe mounted fixed gauge device, model 5202, Series  |
| SG, serial number B174 containing a Cesium 137 (Cs-137), 500 millicuries     |
| source (assay date of November 1984) could not be located in storage.  The   |
| gauge was removed from a pipe on the evening of  1/28/03 by an independent   |
| contractor who placed the gauge in a temporary storage on the morning of     |
| 1/29/03 at the Buchanan Mine Preparation Plant located in Mavisdale,         |
| Virginia.  The gauge was closed and pad locked before it was placed in the   |
| small building storage room.  The independent contractor and the plant       |
| foreman looked for the gauge on 6/2/03 and could not locate it.  They        |
| continued looking for the gauge until 6/4/02 when they declared that it was  |
| missing.  The licensee has no reason to believe that the gauge left the      |
| property, is retracing the steps of the gauge movement and  is interviewing  |
| their employees in an attempt to locate the gauge.                           |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39923       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: NORTH ANNA               REGION:  2  |NOTIFICATION DATE: 06/11/2003|
|    UNIT:  [1] [] []                 STATE:  VA |NOTIFICATION TIME: 17:18[EDT]|
|   RXTYPE: [1] W-3-LP,[2] W-3-LP                |EVENT DATE:        06/11/2003|
+------------------------------------------------+EVENT TIME:        14:53[EDT]|
| NRC NOTIFIED BY:  J. W. JOHNSTONE              |LAST UPDATE DATE:  06/11/2003|
|  HQ OPS OFFICER:  ARLON COSTA                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |MARK LESSER          R2      |
|10 CFR SECTION:                                 |                             |
|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |
|AESF 50.72(b)(3)(iv)(A)  VALID SPECIF SYS ACTUAT|                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     A/R        Y       100      Power Operation  |0        Hot Standby      |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| REACTOR PROTECTION SYSTEM  ACTUATION DUE TO MAIN TRANSFORMER LOCKOUT RELAY   |
| TURBINE TRIP                                                                 |
|                                                                              |
| "At 1453 EDT on 6/11/03, Unit 1 experience a reactor trip due to a main      |
| transformer lockout relay turbine trip.  All equipment operated as designed. |
| 10 CFR 50.72(b)(2)(iv)(B).  Main transformer 'C' appears to have an internal |
| fault, [and] may need to be replaced.  All control rods inserted fully.      |
|                                                                              |
| "A valid actuation of the Auxiliary Feedwater System resulted, due to the    |
| reactor trip. 10 CFR 50.72(b)(3)(iv)(A).  The unit is stable, using main     |
| feedwater and condenser steam dump [as a means of heat removal].             |
|                                                                              |
| All safety-related systems are available except for Unit 1 Emergency Diesel  |
| Generator which is out of service for maintenance.                           |
|                                                                              |
| The licensee notified the NRC Resident Inspector.                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39924       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: CRYSTAL RIVER            REGION:  2  |NOTIFICATION DATE: 06/11/2003|
|    UNIT:  [3] [] []                 STATE:  FL |NOTIFICATION TIME: 18:30[EDT]|
|   RXTYPE: [3] B&W-L-LP                         |EVENT DATE:        06/11/2003|
+------------------------------------------------+EVENT TIME:        15:05[EDT]|
| NRC NOTIFIED BY:  JOHN ADDISON                 |LAST UPDATE DATE:  06/11/2003|
|  HQ OPS OFFICER:  ARLON COSTA                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |MARK LESSER          R2      |
|10 CFR SECTION:                                 |                             |
|ASHU 50.72(b)(2)(i)      PLANT S/D REQD BY TS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|3     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| TECHNICAL SPECIFICATION REQUIRED SHUTDOWN DUE TO INOPERABLE CHILLERS         |
|                                                                              |
| "At 1409 on 6/11/03, both Control Complex Chillers were declared inoperable. |
| The inoperability resulted in an entry into ITS 3.0.3 due to the inability   |
| to comply with ITS 3.7.18.  At 1505 CR-3 [Crystal River Unit 3] began a      |
| power decrease in compliance with the actions of ITS 3.0.3.  This is a       |
| 4-hour reportable event as required by 10 CFR 50.72(b)(2)(i).                |
|                                                                              |
| "At 1618 on 6/11/03 the operating Control Complex Chiller was declared       |
| Operable and the actions of ITS 3.0.3 were exited.  The plant has been       |
| returned to full power operation.                                            |
|                                                                              |
| "The safety significance of this event was small.  The Control Complex       |
| cooling safety function was available through the use of existing procedures |
| and available alternate cooling methods.  At 1456, an available Control      |
| Complex Chiller was manually loaded and is currently providing all required  |
| cooling to the control complex in automatic mode."                           |
|                                                                              |
| The licensee notified the NRC Resident Inspector.                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39925       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: WATTS BAR                REGION:  2  |NOTIFICATION DATE: 06/12/2003|
|    UNIT:  [1] [] []                 STATE:  TN |NOTIFICATION TIME: 00:34[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        06/11/2003|
+------------------------------------------------+EVENT TIME:        23:45[EDT]|
| NRC NOTIFIED BY:  MIKE EARLES                  |LAST UPDATE DATE:  06/12/2003|
|  HQ OPS OFFICER:  FANGIE JONES                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |MARK LESSER          R2      |
|10 CFR SECTION:                                 |                             |
|ACOM 50.72(b)(3)(xiii)   LOSS COMM/ASMT/RESPONSE|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| GREATER THAN 30% OF THE OFFSITE NOTIFICATION SIRENS OUT OF SERVICE DUE TO    |
| STORM                                                                        |
|                                                                              |
| Greater than 30% of the offsite prompt notification system sirens are out of |
| service due to storm related loss of power.  Repairs are presently in        |
| progress to restore power to the affected sirens (34 of 99).  State and      |
| Local agencies have been notified to implement compensatory measures if      |
| required.                                                                    |
|                                                                              |
| The NRC Resident Inspector will be notified by the licensee.                 |
+------------------------------------------------------------------------------+