skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Event Notification Report for February 6, 2003




                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           02/05/2003 - 02/06/2003

                              ** EVENT NUMBERS **

39550  39561  39562  39563  39564  
 
+------------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   39550       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  TEXAS DEPARTMENT OF HEALTH           |NOTIFICATION DATE: 01/31/2003|
|LICENSEE:  UNIVERSITY OF TEXAS AT AUSTIN        |NOTIFICATION TIME: 14:00[EST]|
|    CITY:  AUSTIN                   REGION:  4  |EVENT DATE:        01/30/2003|
|  COUNTY:                            STATE:  TX |EVENT TIME:             [CST]|
|LICENSE#:  L00485-000            AGREEMENT:  Y  |LAST UPDATE DATE:  01/31/2003|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |WILLIAM JONES        R4      |
|                                                |FRED BROWN           NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  JAMES H. OGDEN               |                             |
|  HQ OPS OFFICER:  YAMIR DIAZ                   |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|NAGR                     AGREEMENT STATE        |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| TEXAS AGREEMENT STATE REPORT FOR LEAKING SOURCE                              |
|                                                                              |
| "The University of Texas ordered a Sodium 22 (Na-22) positron source for     |
| research use. The Type A package arrived during the evening of January 30,   |
| 2003, and was unpackaged. During un-packaging it was noted that the Source   |
| was either leaking or contaminated. Attempts to decontaminate the source     |
| only resulted in higher reading. Leakage was measured at 30,000 DPM,         |
| therefore, over the 0.0005 uCi [microcurie] leakage limit.                   |
|                                                                              |
| "The source arrived from the manufacturer: National Accelerator Center,      |
| Somerset West, South Africa.  The report was made IAW 25 TAC 289.202 (bbb).  |
| A follow-up written report will follow by facsimile within 5 days.  Chemical |
| form of the source is solid sodium bicarbonate sealed in a titanium body.    |
| Source was leak tested due to the lack of a leak test certificate with the   |
| shipment. The inner packaging of the Type A container is also contaminated.  |
| No Model # or Serial # is readily apparent."                                 |
+------------------------------------------------------------------------------+
 
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39561       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: HOPE CREEK               REGION:  1  |NOTIFICATION DATE: 02/05/2003|
|    UNIT:  [1] [] []                 STATE:  NJ |NOTIFICATION TIME: 00:12[EST]|
|   RXTYPE: [1] GE-4                             |EVENT DATE:        02/04/2003|
+------------------------------------------------+EVENT TIME:        22:40[EST]|
| NRC NOTIFIED BY:  ART BREADY                   |LAST UPDATE DATE:  02/05/2003|
|  HQ OPS OFFICER:  GERRY WAIG                   +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |JAMES NOGGLE         R1      |
|10 CFR SECTION:                                 |                             |
|ACOM 50.72(b)(3)(xiii)   LOSS COMM/ASMT/RESPONSE|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| LOSS OF METEOROLOGICAL DATA  AT SALEM AND HOPE CREEK STATIONS                |
|                                                                              |
| "THIS 8-HOUR NOTIFICATION IS BEING MADE TO REPORT THAT THE SALEM AND HOPE    |
| CREEK SITE LOST ALL METEOROLOGICAL DATA FOR WIND SPEED, DIRECTION AND        |
| TEMPERATURE AT 1440 ON 2/04/03. ALL THREE UNITS ARE OPERATING AT 100% POWER. |
| NO ACTUATIONS HAVE TAKEN PLACE RELATED TO THIS EVENT. THE CAUSE OF THIS LOSS |
| IS BEING INVESTIGATED. PROCEDURAL GUIDANCE IS AVAILABLE TO OBTAIN THE        |
| NECESSARY DATA FROM THE NATIONAL WEATHER SERVICE SHOULD THIS DATA BE         |
| NECESSARY."                                                                  |
|                                                                              |
| The licensee will notify the NRC Resident Inspector.                         |
+------------------------------------------------------------------------------+
 
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39562       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SAINT LUCIE              REGION:  2  |NOTIFICATION DATE: 02/05/2003|
|    UNIT:  [1] [2] []                STATE:  FL |NOTIFICATION TIME: 12:00[EST]|
|   RXTYPE: [1] CE,[2] CE                        |EVENT DATE:        02/05/2003|
+------------------------------------------------+EVENT TIME:        08:45[EST]|
| NRC NOTIFIED BY:  CALVIN WARD                  |LAST UPDATE DATE:  02/05/2003|
|  HQ OPS OFFICER:  MIKE RIPLEY                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |JOEL MUNDY           R2      |
|10 CFR SECTION:                                 |FRED BROWN           NMSS    |
|APRE 50.72(b)(2)(xi)     OFFSITE NOTIFICATION   |NATIONAL RESP CTR    EPA     |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| NOTIFICATION TO STATE OF RADIOACTIVE MATERIAL FOUND IN SCRAPYARD             |
|                                                                              |
| "At 0845, Florida Power and Light Company (FPL) notified the Florida Bureau  |
| of Radiation Control of an item found at a scrap yard facility in Coral      |
| Springs, FL. The item was an Eberline model RD-A2A radiation detector,       |
| serial number 2555, with the label indicating a sealed source with 50        |
| nanoCuries of Am-241 (exempt quantity).  The detector was removed from the   |
| facility, surveys were performed by FPL personnel and no other radioactive   |
| material was found.  An investigation is in progress to determine the origin |
| of the material."                                                            |
|                                                                              |
| The licensee notified the NRC Resident Inspector.                            |
+------------------------------------------------------------------------------+
 
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39563       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: FERMI                    REGION:  3  |NOTIFICATION DATE: 02/05/2003|
|    UNIT:  [2] [] []                 STATE:  MI |NOTIFICATION TIME: 15:50[EST]|
|   RXTYPE: [2] GE-4                             |EVENT DATE:        02/05/2003|
+------------------------------------------------+EVENT TIME:        12:25[EST]|
| NRC NOTIFIED BY:  PATRICK FALLON               |LAST UPDATE DATE:  02/05/2003|
|  HQ OPS OFFICER:  YAMIR DIAZ                   +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |KENNETH RIEMER       R3      |
|10 CFR SECTION:                                 |                             |
|APRE 50.72(b)(2)(xi)     OFFSITE NOTIFICATION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| OFFSITE NOTIFICATION                                                         |
|                                                                              |
| "On February 5, 2003 at 1225 hours, reports were made to the National Spill  |
| Response Center, the EPA Regional Response Center, the Michigan State Police |
| Operations Center and the State of Michigan Dept of Environmental Quality    |
| concerning a leak (approximately 500 pounds) of ethylene glycol, which is    |
| used in the cooling tower de-icing system, to the environment. Media         |
| interest may be expected."                                                   |
|                                                                              |
| The licensee will not issue a press release unless media interest is         |
| generated.                                                                   |
|                                                                              |
| The licensee notified the NRC resident inspector.                            |
+------------------------------------------------------------------------------+
 
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39564       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: COOK                     REGION:  3  |NOTIFICATION DATE: 02/06/2003|
|    UNIT:  [] [2] []                 STATE:  MI |NOTIFICATION TIME: 00:12[EST]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        02/05/2003|
+------------------------------------------------+EVENT TIME:        20:58[EST]|
| NRC NOTIFIED BY:  DEAN BRUCK                   |LAST UPDATE DATE:  02/06/2003|
|  HQ OPS OFFICER:  GERRY WAIG                   +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |KENNETH RIEMER       R3      |
|10 CFR SECTION:                                 |                             |
|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     A/R        Y       100      Power Operation  |0        Hot Standby      |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| AUTOMATIC REACTOR TRIP DUE TO LOW STEAM GENERATOR WATER LEVEL                |
|                                                                              |
| "In accordance with 10 CFR 50.72(b)(2)(iv)(B) 'Any event or condition that   |
| results in actuation of the Reactor Protection System (RPS) when the reactor |
| is critical except when the actuation results from and is part of a          |
| pre-planned sequence during testing or reactor operation', DC Cook Unit 2 is |
| making a 4 hour non-emergency report.                                        |
|                                                                              |
| "On 2-5-03, at 2058, Cook Unit 2 tripped due to a failed 24 VDC control      |
| group #3 power supply. This caused the feedwater regulating valve for Steam  |
| Generator #3 to fail closed and the reactor tripped on Feed-flow/Steam-flow  |
| mismatch coincident with low level on loop 3. All control rods inserted, the |
| turbine tripped and auxiliary feedwater pumps started as designed. The Main  |
| Steam Stop Valves were manually closed during the implementation of the      |
| Emergency Procedures to stop the RCS cooldown. There were no other notable   |
| occurrences as a result of the trip.                                         |
|                                                                              |
| "The RCS is currently stable in Mode 3 at normal operating pressure and      |
| temperature. Activities are in progress to determine the cause of the power  |
| supply failure and the extent of condition."                                 |
|                                                                              |
| The licensee has notified the NRC Resident Inspector.                        |
+------------------------------------------------------------------------------+