Part 21 Reports: 2005

The following links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS). ADAMS documents are provided in either Adobe Portable Document Format (PDF) or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools. If you have problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Log No Notifier Description Report Date Access No
2005-01-00 Vogtle Butterfly Valve Torque Predictions Under Compressible Flow Conditions 11/22/2004 ml043520077
2005-02-00 Framatome Control Rod Drive Mechanism Leadscrew Coupling 11/23/2004 ml043350183
2005-03-00 Whiting Overstress Condition on Single Failure Proof Crane Trolleys 01/07/2005 Event Notification 41318
2005-04-00 Framatome ANP Turbine Generator Load Rejection with Failure of the Turbine Bypass Valves to Open
01/14/05 Event Notification 41335
2005-05-00 Westinghouse Electric Co Charging Pump Runout During Safety Injection 1/27/2005 ml050340027
2005-05-01 Westinghouse Electric Company Closure of Westinghouse Interim Report No. 04-006 04/12/2005 ml051100355
2005-06-00 Framatome ANP Defective SIS Control Wire 2/10/2005 Event Notification 41396
2005-07-00 Dominion Abnormal Allen-Bradley 700RTC Relay Contact Response 2/10/2005 Event Notification 41397
2005-08-00 Field Complaint About Degussa Construction Chemicals Masterpatch 240 CR Repair Concrete 2/11/2005 ml050460194
2005-09-00 ASCO Valve, Inc Potential non-conformance of diaphragm disc used in certain ASCO scram pilot valves and rebuild kits 02/16/2005 ml050560237
2005-10-00 Honeywell International, Inc Report regarding Potential deviation and defect of a Descote brand valve used in UF6 14 Ton Cylinders, Metropolis Works, Metropolis, Illinois (Uranium Conversion Facility) 02/23/2005 ml050560142
2005-11-00 Framatome ANP MCPR Operating and Monitoring Limits 03/02/2005 Event Notification 41455
2005-12-00 Southern Nuclear Operating Company Cutler-Hammer Freedom Series Model C306 Thermal Overload Relays and Heater Packs 03/02/2005 ml050630275
2005-12-01 Southern Nuclear Operating Company Cutler-Hammer Freedom Series Model C306 Thermal Overload Relays and Heater Packs 07/26/2005 ml052080368
2005-13-00 General Electric Nuclear Energy Potential to Exceed Low Pressure Technical Specification Safety Limit 03/29/2005 ml050950428
2005-15-00 Thermo Electron Corporation Thermo Electron Data Acquisition Recorders 04/14/2005 Event Notification 41599
2005-16-00 Spectrum Technologies Utilities Services USA, Inc. Cutler-Hammer A200 NEMA Size 1 Starters 04/18/2005 ml051100285
2005-17-00 Engine Systems, Inc Reporting of Defects and Non-Compliance: Woodward Governor "Compensating" EG Series Actuators 04/12/2005 ml051110087
2005-18-00 Lankenau Hospital Nucletron V2 microselectron High Dose-Rate Afterloading device 04/08/2005 ml051090399
2005-19-00 Boeing Error notices received from former software suppliers 04/18/2005 ml051180466
2005-20-00 Entergy Operations, Inc Flex-Wedge Disc Fabricated By Crane- Aloyco 05/17/2005 Event Notification 41702
2005-21-00 Bryn Mawr Hospital Incident involving the performance of Novoste intravascular brachytherapy Beta-Cat 05/19/2005 ml051440474
2005-22-00 Ametek Solid State Controls Potential for Premature Failure of Control Rod Instrumentation Power Supply 06/10/2005 Event Notification 41761
2005-23-00 Palo Verde Potential Degraded Condition Due to Pressurizer Heater Element Non-conformance 06/17/2005 Event Notification 41783
2005-23-01 Palo Verde Potential Degraded Condition Due to Pressurizer Heater Element Non-conformance (Retracted) 08/01/2005 Event Notification 41783
2005-24-00 General Electric Energy Critical Power Determination for GE14 and GE12 Fuel with Zircaloy Spacers 06/24/2005 Event Notification 41794
2005-24-01 General Electric Energy Completion: Critical Power Determination for GE14 and GE12 Fuel With Zircaloy Spacers 09/20/2005 ml052690084
2005-25-00 HowdenBuffalo Insufficient adhesion of Carboline topcoat to Carboline primer - Topcoat flaking from fansSampler Model H-809VI 07/01/2005 ml051940302
ml051940305
Event Notification 41819
2005-26-00 General Electric Co Circuit Breaker Replacement Primary Bushings Not Tested to ANSI Standards 07/14/2005 ml052000333
2005-26-01 General Electric Co Testing to ANSI Standards Complete on Circuit Breaker Replacement Primary 10/13/2005 ml052910389
2005-27-00 General Electric Co Surveillance Program for Channel-Control Blade Interference 07/14/2005 ml052000328
2005-28-00 AREVA Pressurizer Heaters From Framatome 07/22/2005 Event Notification 41864
2005-29-00 Honeywell International, Inc Notification of Non-compliance with ANSI and QA Manual Requirements 07/20/2005 Event Notification 41857
2005-30-00 Catawba Potential Issue with Struthers-Dunn Relays 08/02/2005 Event Notification 41888
2005-30-01 Duke Energy Struthers-Dunn 219 Series relays manufactured in China 09/14/2005 ml052640220
2005-31-00 Areva Interim Report Concerning an Evaluation of a Deviation 08/08/2005 ml052220273
2005-32-00 Rapid City Regional Hospital, Inc. Failure of MicroSelectron V2 High Dose Rate Afterloader 07/20/2005 ml052150029
2005-33-00 Boeing Co Error Notices Received From Former Software Suppliers 07/19/2005 ml052140039
2005-33-01 Boeing Co Error Notices Received From Former Software Suppliers 09/30/2005 ml052860229
2005-34-00 Lancaster General Hospital Gamma Knife Microphone Clip 08/22/2005 Event Notification 41937
2005-35-00 Engine Systems, Inc Governor Drive Coupling Element 09/16/2005 ml052650354
2005-36-00 Fluke Biomedical RMS Fluke Radiaition Meter 09/22/2005 Event Notification 42008
2005-37-00 Wyle Laboratories Existence of a possible defect in Bussmann KWN-R fuses 09/27/2005 Event Notification 42021
2005-38-00 Callaway Models 763 & 763a Pressure Transmitters and Model 764 Differential Pressure Transmitters 11/17/2005 Event Notification 42151
ml053180299
2005-38-01 AmerenUE Correction to Part 21 Notification Regarding PRIME Measurement Products Pressure Transmitters
05/08/2006
ml061360250
2005-39-00 Nuclear Logistics Inc Potentially Defective Micrologic Trip Units 11/24/2005 Event Notification 42168
2005-40-00 Framatome ANP Safety Limit Minimum Critical Power Ratio Calculation 12/02/2005 Event Notification 42185
2005-41-00
Rosemount Nuclear Instruments
Rosemount Transmitters May not Conform to the Published Accuracy
12/27/2005
Event Notification 42233
ml053640329
2005-42-00 San Onofre Nuclear Generating Station Missing Taper Pins 04/12/2005 ml051050353