Event Notification Report for July 30, 2003



                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           07/29/2003 - 07/30/2003

                              ** EVENT NUMBERS **

40017  40019  40020  40024  40029  40030  40032  40033  

+------------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   40017       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  TEXAS DEPARTMENT OF HEALTH           |NOTIFICATION DATE: 07/25/2003|
|LICENSEE:  MEMORIAL HERMANN HOSPITAL            |NOTIFICATION TIME: 11:03[EDT]|
|    CITY:  The Woodlands            REGION:  4  |EVENT DATE:        06/25/2003|
|  COUNTY:                            STATE:  TX |EVENT TIME:        12:00[CDT]|
|LICENSE#:  L03772                AGREEMENT:  Y  |LAST UPDATE DATE:  07/25/2003|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |TROY PRUETT          R4      |
|                                                |TRISH HOLAHAN        NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  HELEN WATKINS                |                             |
|  HQ OPS OFFICER:  JOHN MacKINNON               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|NAGR                     AGREEMENT STATE        |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| INCORRECT PATIENT GIVEN A DOSE                                               |
|                                                                              |
| "On June 25, 2003, a nuclear medicine technologist gave a 243 microcurie     |
| iodine-123 capsule to the wrong patient.  There were two patients with the   |
| same last name and middle initial but different first names in the           |
| outpatient waiting room.  The wrong patient responded when the technologist  |
| took the patient into the nuclear medicine department, explained the         |
| procedure, and had him fill out a thyroid questionnaire.  After the patient  |
| swallowed the capsule, he informed the technologist that he was not at the   |
| hospital for a thyroid study.  The patient was informed of the               |
| misadministration.  The licensee did not report whether the referring        |
| physician was informed.                                                      |
|                                                                              |
| "Cause: The technologist failed to fully identify the patient.               |
|                                                                              |
| "Corrective Action: The technologist was counseled. To prevent a recurrence, |
| the technologists will question the patient's full name and match their date |
| of birth in the future.  The technologist will also ask the patient what     |
| examination or procedure they are scheduled for before initiating any        |
| test."                                                                       |
|                                                                              |
| Texas Incident No.:  I-8042.                                                 |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   40019       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  CALIFORNIA RADIATION CONTROL PRGM    |NOTIFICATION DATE: 07/25/2003|
|LICENSEE:  DELLAVALLEY LABORATORIES             |NOTIFICATION TIME: 13:00[EDT]|
|    CITY:  SACRAMENTO               REGION:  4  |EVENT DATE:        07/25/2003|
|  COUNTY:                            STATE:  CA |EVENT TIME:        09:00[PDT]|
|LICENSE#:  3194-10               AGREEMENT:  Y  |LAST UPDATE DATE:  07/25/2003|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |TROY PRUETT          R4      |
|                                                |FRED BROWN           NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  KENT PREDERGAST              |                             |
|  HQ OPS OFFICER:  STEVE SANDIN                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|NAGR                     AGREEMENT STATE        |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| AGREEMENT STATE REPORT INVOLVING A STOLEN TROXLER GAUGE                      |
|                                                                              |
| "[The licensee] got in late from work, and failed to take the gauge to       |
| storage location but instead left the gauge in the back of his pickup and    |
| covered it.  The gauge was covered inside the camper shell.  Sometime        |
| between 11 PM on 7/24/03 and 1:00 AM on 7/25/03, the pickup was stolen from  |
| it's parking location.  The Sacramento Police were notified on 7/25/03 and   |
| the licensee will be placing an advertisement in the Sacramento Bee          |
| [newspaper], offering a reward for the stolen gauge.                         |
|                                                                              |
| "The Stolen gauge was a CPN 131, Model 503 DR, serial number H35126508       |
| containing 50 millicuries of Americium  241 Beryllium."                      |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   40020       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  NC DIV OF RADIATION PROTECTION       |NOTIFICATION DATE: 07/25/2003|
|LICENSEE:  REX HEALTHCARE                       |NOTIFICATION TIME: 13:09[EDT]|
|    CITY:  RALEIGH                  REGION:  2  |EVENT DATE:        07/14/2003|
|  COUNTY:                            STATE:  NC |EVENT TIME:             [EDT]|
|LICENSE#:  092-0160-1            AGREEMENT:  Y  |LAST UPDATE DATE:  07/25/2003|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |ANNE BOLAND          R2      |
|                                                |FRED BROWN           NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  SHARN M. JEFFRIES            |                             |
|  HQ OPS OFFICER:  STEVE SANDIN                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|NAGR                     AGREEMENT STATE        |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| AGREEMENT STATE REPORT INVOLVING MISSING IODINE-125 SEEDS                    |
|                                                                              |
| On 7/22/03 Rex Healthcare personnel discovered that five (5) I-125 seeds     |
| (activity 0.384 milliCuries/ea for a total of 1.9 milliCuries) were missing. |
| The licensee conducted a search of the area between 7/22 and 7/24/03 with    |
| negative results.                                                            |
|                                                                              |
| NC Incident No.:  03-32                                                      |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   40024       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: WESTINGHOUSE HEMATITE                |NOTIFICATION DATE: 07/28/2003|
|   RXTYPE: URANIUM FUEL FABRICATION             |NOTIFICATION TIME: 11:58[EDT]|
| COMMENTS: LEU CONVERSION (UF6 to UO2)          |EVENT DATE:        07/28/2003|
|           COMMERCIAL LWR FUEL                  |EVENT TIME:        07:30[CDT]|
|                                                |LAST UPDATE DATE:  07/28/2003|
|    CITY:  HEMATITE                 REGION:  3  +-----------------------------+
|  COUNTY:  JEFFERSON                 STATE:  MO |PERSON          ORGANIZATION |
|LICENSE#:  SNM-33                AGREEMENT:  N  |BRUCE BURGESS        R3      |
|  DOCKET:  07000036                             |TOM ESSIG            NMSS    |
+------------------------------------------------+CHRIS MILLER         R3      |
| NRC NOTIFIED BY:  KAREN CRAIG                  |JACK RAMSEY          IP      |
|  HQ OPS OFFICER:  STEVE SANDIN                 |JIM WHITNEY          IAT     |
+------------------------------------------------+JIM CREED            IAT     |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|PAAB 74.11(a)            LOST/STOLEN SNM        |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| SCRAP ZIRCONIUM RODS SHIPPED TO RECYCLER IN CANADA CONTAINING U-235 FUEL     |
| PELLETS                                                                      |
|                                                                              |
| Between 3-4 weeks ago Westinghouse Hematite shipped approximately 18,000     |
| scrap zirconium rods to Mississauga Metals and Alloys, Inc. in Brampton,     |
| Ontario, Canada for recycling.  Scrap zirconium rods require a 100% visual   |
| inspection prior to shipment offsite to ensure that they do not contain any  |
| fuel pellets.  Last Thursday on 7/24/03, the recycler discovered thirty-six  |
| (36) U-235 pellets (4.2 w/o) after processing about 25% of the scrap rods.   |
| The individual at Mississauga responsible for contacting Westinghouse did    |
| not return to work until Monday and, thus, Westinghouse was not informed     |
| until 0730 CDT on 7/28/03.  The pellets contain a total of six (6) grams     |
| U-235.  Westinghouse is dispatching staff to the recycling facility to       |
| assist in determining appropriate corrective actions.                        |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   40029       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PALO VERDE               REGION:  4  |NOTIFICATION DATE: 07/29/2003|
|    UNIT:  [] [] [3]                 STATE:  AZ |NOTIFICATION TIME: 01:42[EDT]|
|   RXTYPE: [1] CE,[2] CE,[3] CE                 |EVENT DATE:        07/28/2003|
+------------------------------------------------+EVENT TIME:        18:54[MST]|
| NRC NOTIFIED BY:  Dan Marks                    |LAST UPDATE DATE:  07/29/2003|
|  HQ OPS OFFICER:  ERIC THOMAS                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |MARK SHAFFER         R4      |
|10 CFR SECTION:                                 |                             |
|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |
|AESF 50.72(b)(3)(iv)(A)  VALID SPECIF SYS ACTUAT|                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|                                                   |                          |
|3     A/R        Y       98       Power Operation  |0        Hot Standby      |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| RPS ACTUATION, SPECIFIED SYSTEM ACTUATION                                    |
|                                                                              |
| "On July 28, 2003, at approximately 18:54 Mountain Standard Time (MST) Palo  |
| Verde Unit 3 experienced an automatic reactor trip on low DNBR [Departure    |
| from Nucleate Boiling Ratio] from approximately 98% rated thermal power due  |
| to reduced reactor coolant system flow when the main turbine tripped during  |
| a grid perturbation. Unit 3 was at normal temperature and pressure prior to  |
| the trip. All CEAs inserted fully into the reactor core. This was an         |
| uncomplicated reactor trip. No emergency classification was required per the |
| Emergency Plan. No automatic ESF actuations occurred and none were required. |
| The operators initiated a manual Main Steam Isolation System (MSIS)          |
| actuation, in accordance with the emergency operations procedures in         |
| response to the loss of forced reactor coolant system flow. Safety related   |
| buses remained energized during and following the reactor trip. The          |
| Emergency Diesel Generators did not start and were not required. The offsite |
| power grid is stable. No significant LCOs have been entered as a result of   |
| this event. No major equipment was inoperable prior to the event that        |
| contributed to the event.                                                    |
|                                                                              |
| "Unit 3 is stabilizing at approximately 520 degrees F and 2150 psia pressure |
| in Mode 3. The reactor coolant system remains in natural circulation with    |
| heat removal via the atmospheric dump valves and feedwater from the          |
| essential auxiliary feedwater system. The event did not result in any        |
| challenges to fission product barriers and there were no adverse safety      |
| consequences as a result of this event. The event did not adversely affect   |
| the safe operation of the plant or the health and safety of the public.      |
|                                                                              |
| "Palo Verde Units 1 and 2 also observed the grid perturbation, but are       |
| continuing to operate in Mode 1 at approximately 98% rated thermal power.    |
| The cause of the perturbation is believed to be associated with switching in |
| a nearby Hassayampa yard by Salt River Project. A fossil power plant in the  |
| vicinity also tripped off line during the grid perturbation event.           |
|                                                                              |
| "The [NRC] Senior Resident Inspector was informed of the Unit 3 reactor trip |
| and this notification. The Senior Resident Inspector has arrived on-site to  |
| observe response to the reactor trip."                                       |
|                                                                              |
| * * * UPDATE 1437 EDT ON 7/29/03 FROM RAY BUZARD TO S. SANDIN * * *          |
|                                                                              |
| The following information was provided as an update:                         |
|                                                                              |
| "This is a follow-up notification to the automatic reactor trip event        |
| reported on July 28, 2003 (ENS # 40029) for Palo Verde Unit 3. The plant     |
| remains stable in Mode 3 at approximately 585 degrees and 2250 psia. Reactor |
| coolant system (RCS) forced circulation has been restored with two reactor   |
| coolant pumps (RCP) in operation.  Heat removal remains via the atmospheric  |
| dump valves and the non-essential auxiliary feedwater pump is supplying      |
| steam generator feedwater. Off-site power has been restored and is supplying |
| non-class loads.                                                             |
|                                                                              |
| "An RCS leak of approximately 1.7 gallons per minute has been identified     |
| through the seal on RCP 2A. Vacuum has been restored to the main condenser   |
| and activities are in progress to cool the plant down to Mode 5, Cold        |
| Shutdown, using the steam bypass control system, to facilitate RCP 2A seal   |
| replacement. The date of restart has not been established.                   |
|                                                                              |
| "The Resident Inspector was informed of this notification."                  |
|                                                                              |
| Notified R4DO(Shaffer).                                                      |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   40030       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SALEM                    REGION:  1  |NOTIFICATION DATE: 07/29/2003|
|    UNIT:  [1] [] []                 STATE:  NJ |NOTIFICATION TIME: 14:48[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        07/29/2003|
+------------------------------------------------+EVENT TIME:        14:01[EDT]|
| NRC NOTIFIED BY:  NOEL KEMM                    |LAST UPDATE DATE:  07/29/2003|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          UNUSUAL EVENT         |JAMES NOGGLE         R1      |
|10 CFR SECTION:                                 |BOB DENNIG           NRR     |
|AAEC 50.72(a) (1) (i)    EMERGENCY DECLARED     |NADER MAMISH         IRO     |
|                                                |MIKE EACHES          FEMA    |
|                                                |ANDREA HEINTZELMAN   DHS     |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     A/R        Y       100      Power Operation  |0        Hot Standby      |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| UNIT 1 DECLARED AN UNUSUAL EVENT DUE TO THE LOSS OF 500KV OFFSITE POWER      |
|                                                                              |
| "Experienced breaker failure of 500 KV 1-5 breaker.  The protective function |
| of this took out 500 KV bus section 1.  All 4 KV vital buses deenergized and |
| were repowered by the emergency diesel generators.  Also 2 of 4 group buses  |
| deenergized.  Auxiliary feedwater pumps started on steam generator low       |
| levels.  This all resulted in a reactor trip.  The source of the failure has |
| yet to be determined.  Reactor coolant temperature is being controlled by    |
| turbine bypass valves."                                                      |
|                                                                              |
| The licensee informed state/local agencies and the NRC resident inspector.   |
|                                                                              |
| * * * UPDATE ON 7/29/03 AT 1803 EDT FROM NOEL KEMM TO BILL GOTT * * *        |
|                                                                              |
| "500 KV bus section one energized.  4KV vital bus 1B energized from offsite  |
| power by 13 station power transformer.  Restoration of 1A and 1C 4KV vital   |
| buses from offsite power in progress.  Initial problem appears to be a       |
| ground problem with 1-5 500 KV breaker and subsequent breaker failure relay  |
| scheme."                                                                     |
|                                                                              |
| The licensee has notified the NRC Resident Inspector and Region 1 IRC.       |
|                                                                              |
| * * * UPDATE ON 7/29/03 AT 2103 EDT FROM MARK FIOCCO TO GERRY WAIG * * *     |
|                                                                              |
| "Current Plant Status: 500 KV Bus section one energized . 4KV vital buses 1B |
| and 1C energized from offsite power by 13 station power transformer.         |
| Restoration of 1A 4KV vital bus from offsite power in progress."             |
|                                                                              |
| The licensee has not notified the NRC Resident Inspector. The HQ Operatiions |
| Officer notified NRC Region 1 IRC.                                           |
|                                                                              |
| * * * UPDATE ON 7/29/03 AT 2201 EDT FROM MARK FIOCCO TO GERRY WAIG * * *     |
|                                                                              |
| "Status Update: All 4KV vital buses energized from 13 station power          |
| transformer. Restoration of second source of offsite AC power is in          |
| progress. Making preparation to terminate Unusual Event." The licensee has   |
| notified the NRC Resident Inspector.                                         |
|                                                                              |
| * * * UPDATE ON 7/29/03 AT 2211 EDT FROM MARK FIOCCO TO GERRY WAIG * * *     |
|                                                                              |
| The Licensee terminated Notice of Unusual Event (NOUE) on 07/29/03 at 2211   |
| hours EDT. The licensee has notified the NRC Resident Inspector.             |
|                                                                              |
| The HQ Operatiions Officer notified FEMA (Butch Stiendurf) and DHS (Ed       |
| Welch) of the NOUE termination.                                              |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   40032       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: HARRIS                   REGION:  2  |NOTIFICATION DATE: 07/29/2003|
|    UNIT:  [1] [] []                 STATE:  NC |NOTIFICATION TIME: 20:59[EDT]|
|   RXTYPE: [1] W-3-LP                           |EVENT DATE:        07/29/2003|
+------------------------------------------------+EVENT TIME:        20:00[EDT]|
| NRC NOTIFIED BY:  ROBERT WORRELL               |LAST UPDATE DATE:  07/29/2003|
|  HQ OPS OFFICER:  BILL GOTT                    +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |JAMES MOORMAN        R2      |
|10 CFR SECTION:                                 |PHILIP BROCHMAN      NSIR    |
|BSUR 20.1906(d)(1)       SURFACE CONTAM LEVELS >|DANIEL GILLEN        NMSS    |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| SURFACE CONTAMINATION LEVELS ABOVE LIMITS                                    |
|                                                                              |
| "This report is generated due to finding smearable contamination on the      |
| spent fuel shipping cask.  Smearable contamination in excess of 10CFR71.87   |
| requires a one hour report.  Due to 10CFR21, we cannot disclose further      |
| information over non-secure communications."                                 |
|                                                                              |
| The licensee informed the NRC Resident Inspector.                            |
|                                                                              |
| Additional information can be obtained from the NRC Operations Center.       |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   40033       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PALO VERDE               REGION:  4  |NOTIFICATION DATE: 07/29/2003|
|    UNIT:  [] [2] []                 STATE:  AZ |NOTIFICATION TIME: 21:13[EDT]|
|   RXTYPE: [1] CE,[2] CE,[3] CE                 |EVENT DATE:        07/29/2003|
+------------------------------------------------+EVENT TIME:        15:16[MST]|
| NRC NOTIFIED BY:  DUANE KANITZ                 |LAST UPDATE DATE:  07/29/2003|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |CHUCK CAIN           R4      |
|10 CFR SECTION:                                 |PAT GWYNN            RA      |
|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|WILLIAM BECKNER      NRR     |
|AESF 50.72(b)(3)(iv)(A)  VALID SPECIF SYS ACTUAT|                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     M/R        Y       98       Power Operation  |0        Hot Standby      |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| UNIT 2 WAS MANUALLY TRIPPED AFTER  A STUCK OPEN SPRAY VALVE FAILED TO CLOSE  |
|                                                                              |
| "On July 29, 2003, at approximately 1518 Mountain Standard Time (MST) Palo   |
| Verde Unit 2 plant operators manually tripped the reactor from approximately |
| 98% rated thermal power due to reduced reactor coolant system pressure when  |
| a pressurizer spray valve opened and failed to close on operator demand.     |
| Unit 2 was at normal temperature and pressure prior to the trip. All CEAs    |
| inserted fully into the reactor core. This was an uncomplicated reactor      |
| trip. No emergency classification was required per the Emergency Plan.       |
| Containment Isolation and Safety Injection Actuation Signals were received   |
| following the manual reactor trip per design. Safety related buses remained  |
| energized during and following the reactor trip. No significant LCOs have    |
| been entered as a result of this event. The pressurizer spray valve that     |
| initiated the event was being placed in service following maintenance.       |
|                                                                              |
| "Unit 2 is stabilized in Mode 3 at approximately 564 degrees F and 2200      |
| psia. The reactor coolant system remains in natural circulation with heat    |
| removal via Steam Bypass Control to the main condenser. The event did not    |
| result in any challenges to fission product barriers and there were no       |
| adverse safety consequences as a result of this event. The event did not     |
| adversely affect the safe operation of the plant or the health and safety of |
| the public.                                                                  |
|                                                                              |
| "The Resident Inspector was informed of the Unit 2 reactor trip and this     |
| notification. The Resident Inspector is onsite to observe response to the    |
| reactor trip.                                                                |
|                                                                              |
| "The reactor coolant pumps were secured after the trip to stop continued     |
| spray flow and depressurization per the alarm response procedure.  The       |
| offsite electrical power grid is stable."                                    |
+------------------------------------------------------------------------------+