skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Event Notification Report for February 14, 2003



                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           02/13/2003 - 02/14/2003

                              ** EVENT NUMBERS **

37298  39575  39584  



+------------------------------------------------------------------------------+
|Other Nuclear Material                           |Event Number:   37298       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  SOUTHEAST MISSOURI STATE UNIVERSITY  |NOTIFICATION DATE: 09/07/2000|
|LICENSEE:  SOUTHEAST MISSOURI STATE UNIVERSITY  |NOTIFICATION TIME: 10:04[EDT]|
|    CITY:  CAPE GIRARDEAU           REGION:  3  |EVENT DATE:        06/12/2000|
|  COUNTY:  CAPE GIRARDEAU            STATE:  MO |EVENT TIME:             [CDT]|
|LICENSE#:                        AGREEMENT:  N  |LAST UPDATE DATE:  02/13/2003|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |GARY SHEAR           R3      |
|                                                |DON COOL             NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  CHRIS McGOWAN                |                             |
|  HQ OPS OFFICER:  LEIGH TROCINE                |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|BOV1 20.2202(a)(1)       PERS OVEREXPOSURE/TEDE |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| POTENTIAL PERSONNEL OVEREXPOSURE OF A CONTRACT EMPLOYEE AT SOUTHEAST         |
| MISSOURI STATE UNIVERSITY IN CAPE GIRARDEAU                                  |
|                                                                              |
| HOO NOTE:   Information regarding the same event was reported to the NRC     |
| Operations Center on 09/01/00 by Engelhardt & Associates.  (Refer to event   |
| #37282.)                                                                     |
|                                                                              |
| The licensee was advised by the NRC Region 3 Office to followup on the       |
| report made by Engelhardt & Associates because the work was performed on the |
| Southeast Missouri State University Campus.  The licensee is making this     |
| notification because they want to document that they are aware of this issue |
| and that they agree with the Engelhardt & Associates report.  Another reason |
| for the report is that there may be an issue of who the responsible party is |
| at this point in time.                                                       |
|                                                                              |
| As a result of an NRC visit in February, Southeast Missouri State University |
| discovered that a spill had occurred in the basement of Magill Hall.         |
| Accordingly, Engelhardt & Associates was contracted to perform several tasks |
| including cleanup of the spill.  At the time, the spill was thought to be    |
| minor, and the licensee has since found out that the spill was quite major.  |
| In addition to cleanup of the spill, Engelhardt & Associates was contracted  |
| to help the licensee get ready for a waste haul and help prepare a new       |
| Radiation Plan.  An Engelhardt & Associates representative arrived on        |
| 06/12/00, and he worked in (and out) the basement of Magill Hall for 5       |
| days.                                                                        |
|                                                                              |
| On 09/01/00, the NRC Region 3 Office (Kevin Null) notified the licensee that |
| the Engelhardt & Associates employee had received a dose of 9 REM CEDE.  As  |
| a result, the licensee is in the process of trying to arrange followup       |
| testing for the Engelhardt & Associates employee.  The licensee has also     |
| hired another firm (SAIC) to cleanup some areas of Magill Hall because of a  |
| secondary spill that occurred quite some time ago.  SAIC representatives     |
| have been on campus for a 1-week period already and are expected to return   |
| to the campus on 09/18/00.  SAIC will also be handling the licensee's dose   |
| assessment.                                                                  |
|                                                                              |
| Call the NRC operations officer for licensee contact information.            |
|                                                                              |
| * * * UPDATE ON 2/13/02 FROM WALT LILLY TO MIKE RIPLEY /HOWIE CROUCH * * *   |
|                                                                              |
| Final bioassays and lung counts from individuals exposed during the above    |
| incident  indicate that another individual had an intake of Am-241.  This    |
| individual received an estimated intake of 9.4 nanocuries with a final dose  |
| assigned of  76 REM CDE to bone surfaces and 4.2 REM CEDE.  The individual   |
| is undergoing chelation therapy at this time.                                |
+------------------------------------------------------------------------------+

+-----------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   39575       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  MA RADIATION CONTROL PROGRAM         |NOTIFICATION DATE: 02/10/2003|
|LICENSEE:  PERKINELMER LIFE SCIENCES            |NOTIFICATION TIME: 14:29[EST]|
|    CITY:  BOSTON                   REGION:  1  |EVENT DATE:        07/18/2002|
|  COUNTY:                            STATE:  MA |EVENT TIME:             [EST]|
|LICENSE#:  00-3200               AGREEMENT:  Y  |LAST UPDATE DATE:  02/10/2003|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |GLENN MEYER          R1      |
|                                                |DON COOL     EO      NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  CARPENITO                    |                             |
|  HQ OPS OFFICER:  CHAUNCEY GOULD               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|NAGR                     AGREEMENT STATE        |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| POTENTIALLY MISSING  PHOSPHORUS-32 SHIPPING PACKAGES                         |
|                                                                              |
| Single packages containing P-32 (~14 day half-life) were destined for four   |
| different out-of-state locations (in CA, KS, NY and TX). Intended shipping   |
| dates were July 18, August 5 and August 6, 2002. Carrier reported packages   |
| potentially missing within 2-3 days after intended shipping dates. The       |
| per-package activities ranged from 250 microcuries to 1 millicurie. All      |
| subject radioactive material contents are presently well past ten            |
| half-lives. After several months of shipper-carrier joint investigation, the |
| cause(s) remain undetermined. Actions have been taken by shipper and carrier |
| to prevent recurrence.                                                       |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39584       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: DIABLO CANYON            REGION:  4  |NOTIFICATION DATE: 02/13/2003|
|    UNIT:  [] [2] []                 STATE:  CA |NOTIFICATION TIME: 19:45[EST]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        02/13/2003|
+------------------------------------------------+EVENT TIME:        10:00[PST]|
| NRC NOTIFIED BY:  TONY CHITWOOD                |LAST UPDATE DATE:  02/13/2003|
|  HQ OPS OFFICER:  HOWIE CROUCH                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |CHARLES MARSCHALL    R4      |
|10 CFR SECTION:                                 |                             |
|ADEG 50.72(b)(3)(ii)(A)  DEGRADED CONDITION     |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     N          N       0        Refueling        |0        Refueling        |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| SIGNIFICANT INSERVICE INSPECTION FINDINGS FOR UNIT 2 STEAM GENERATOR TUBES   |
|                                                                              |
| The following information was obtained from the Licensee via facsimile:      |
|                                                                              |
| "On February 13, 2003, during the Unit 2 eleventh refueling outage (2R11),   |
| eddy current data on SG [Steam Generator] 2-4 indicated that greater than    |
| one percent of the total tubes inspected were defective.  Most of the        |
| pluggable indications are due to outside diameter stress corrosion cracking  |
| (ODSCC) at the tube support plate intersections.  Eddy current examination   |
| of these tubes indicated that the ODSCC crack growth rate at the tube        |
| support plate exceeded the program predicted growth rates.  Preliminary      |
| calculations indicated the TS 5.6.10.d.5 limit for probability of burst      |
| (POB) was exceeded.                                                          |
|                                                                              |
| "An additional defective tube in SG 2-4 row 5 tube bend has been identified  |
| that will be subject to additional insitu testing. PG&E has expanded the SG  |
| inspection scope and identified a team to prepare a root cause               |
| determination.                                                               |
|                                                                              |
| "An NRC teleconference in accordance with TS 5.6.10.d.5 was held on February |
| 13, 2003, at 1000 PST, to provide initial notification of significant        |
| findings.  Additional teleconferences have been scheduled to provide         |
| additional inservice inspection results as they become available.            |
|                                                                              |
| "The NRC Resident Inspector and an additional onsite Region IV inspector     |
| were part of the teleconference presentation cited above."                   |
+------------------------------------------------------------------------------+