For 2008 |
P08-III-1 |
Replacing Social Security Numbers with a Unique Identifier - MSHA Individual Identification Number (MIIN) |
P08-III-2 |
30 Code of Federal Regulations Part 100.5 Determination of penalty; special assessment, and Part 100.6(d); Referral of Citations/Orders for Assessment |
P08-III-3 |
Criteria for Issuance and Maintenance of Special Investigation Credentials |
P08-IV-1 |
Enforcement of Diesel Particulate Matter Final Limit at Metal and Nonmetal Underground Mines |
P08-V-1 |
Reissue of PPL No. P04-V-4; Repairs or Maintenance of Machinery, 30 CFR 75.1725(c)
|
P08-V-2 |
Approval of Communication and Tracking Devices Required by the Mine Improvement and New Emergency Response Act of 2006 (MINER Act) |
P08-V-3 |
Approval Plate for Caterpillar Model 3306 PCNA Diesel Engine |
P08-V-4 |
Water Sprinkler Fire Protection of Underground Belt Conveyors and Belt Takeup Storage Units |
P08-V-5 |
Interpretation of 30 CFR 75.1100-1 and 2 Regarding Water Delivery Capability of Coal Mine Waterlines When Fighting a Fire with a Firehose and Nozzle |
For 2006 |
P06-III-1 |
Part 41 Legal Identification Numbers for Auger and Highwall Miner Operators and Providing for MSHA Notification with the Relocation of These Portable Mining Operations |
P06-V-1 |
Safe Use of Welding Equipment on Longwall Mining Systems- Interpretation of 30 CFR 75.1725 (a) |
P06-V-2 |
Interpretation of 30 CFR 75.1100-1 and 2 Regarding Water Delivery Capability of Coal Mine Waterlines When Fighting a Fire with a Firehose and Nozzle |
P06-V-3 |
Application of 30 CFR Part 75.323(e) to Bleeder Systems |
P06-V-5 |
Water Sprinkler Fire Protection of Underground Belt Conveyors and Belt Takeup Storage Units |
P06-V-6 |
Slope and Shaft Construction |
P06-V-10 |
Reissue of PPL No. P06-V-9: Reissue of PPL No. P06-V-9: Implementation of Section 2 of the Mine Improvement and New Emergency Response Act of 2006 |
P06-V-11 |
Family Liaison and Primary Communicator: Implementation of Section 7 of the Mine Improvement and New Emergency
Response Act of 2006 |