Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback

Asset Management

System Management and Monitoring Construction and System Preservation Evaluation and Economic Investment Workshops and Conferences Staff Directory Resources and Related Sites About Asset Management

Printable version of this case study (.pdf, 0.4 mb)

Transporation Asset Management: The Ohio Experience

Case Study report cover

FRONT COVER PHOTO: The Maumee River Bridge is a cable-stayed structure built to replace an existing draw bridge on a busy Interstate freight corridor. This innovative signature structure incorporates an illuminated central pylon capable of displaying customizable themes that enhance the Toledo skyline.

Presented by

U.S. Department of Transportation Federal Highway Administration

FHWA-IF-07-029

    Next >>
PDF files can be viewed with the Acrobat® Reader®

Events

More Information

Contact

Francine Shaw-Whitson
Office of Asset Management
202-366-8028
E-mail Francine

 
 
This page last modified on 09/11/08
 

FHWA
United States Department of Transportation - Federal Highway Administration