Hardcopy Filing & Forms
Send all paper or non-electronic
official communications by mail or overnight
services to:
Kimberly D. Bose, Secretary
Nathaniel J. Davis, Sr., Deputy Secretary
Federal Energy Regulatory Commission
888 First Street, N.E.
Washington, DC 20426
Note: All communications regarding existing proceedings and cases should be identified by the name and docket number of the proceeding.
|
|
|
Click on the categories below to view additional Information. |
Forms |
|
|
Form No.
1-F: Annual Report of Non-major Electric Utility
Form No. 556: Certification of QF
Status for Small Power Production and Cogeneration
Facilities
Form No. 561: Interlocking Directorates
FERC-566: Twenty Largest Purchasers
FERC-580: Interrogatory on Fuel
and Energy Purchase Practices
FERC-730: Report of Transaction Investment Activity |
Form
No. 1-F - Annual Report of Non-major Electric Utility |
Summary |
Information |
Downloads & Links |
The Form No. 1-F is a comprehensive
financial and operating Report submitted by Non-major
Electric Utilities and Licensees. Non-major is defined
as having total annual sales of 10,000 megawatt-hours
or more in the previous calendar year and not classified
as Major. |
Chapter: 18 CFR Part 141.2
OMB #: 1902-0029, exp 02/28/2009
Filing Date: April 18
» 2006 file extension to May 18 |
|
Form
No. 556 - Certification of QF Status for Small
Power Production and Cogeneration Facilities |
Summary |
Information |
Downloads & Links |
On February 24, 1995, the Commission
instituted the FERC Form No. 556 filing requirement,
which should be included with any application for Commission
certification/recertification or notice of self-certification/self-recertification. |
Chapter: 18 C.F.R. § 131.80
OMB #: 1902-0075, exp 7/31/2011
Filing Date: As needed |
|
Form
No. 561 - Interlocking Directorates |
Summary |
Information |
Downloads & Links |
Annual report of information detailing
electric public utility officer and board of director
positions held both within and outside their affiliated
public utility. |
Chapter: 18 CFR Sec. 131.31 & Part
46
Rulemaking RM05-6
OMB #: 1902-0099, exp 7/31/2011
Filing Date: April 30, 2008 for 2007 data. |
|
FERC-566 - Twenty Largest Purchasers |
Summary |
Information |
Downloads & Links |
List customers and their business
addresses if they were one of the top twenty largest
purchasers of electric energy, measured in kilowatt hours
sold, for purposes other than resale, during any of three
preceding calendar years. |
Chapter: 18 CFR Sec. 46.3
OMB #: 1902-0114, exp 7/31/2011
Filing Date: January 31
*Any requests for privileged treatment of FERC-566 information will be denied per 18 CFR 46.3, Part 305 of the Federal Power Act and as approved by the Office of Management and Budget under 1902-0114. |
|
FERC-580 - Interrogatory on Fuel and Energy Purchase
Practices |
Summary |
Information |
Downloads & Links |
This biennial data collection gathers
information (under Docket IN79-6) on utility fuel supply
contracts and other costs recovered through wholesale
fuel adjustment clauses. |
Docket No. IN79-6 issued 04/26/79, Section 205(f)(2) of the Federal Power Act
OMB #: 1902-0137, exp 08/31/2010
Filing Date: Even numbered years on Sept 15 |
|
FERC-730 - Report of Transaction Investment Activity |
Summary |
Information |
Downloads & Links |
FERC-730 is used by the Commission to determine the effectiveness of its rules and to provide it with an accurate assessment of the state of transmission investment by public utilities. This annual report includes projections, information that details the level and status of transmission investment, and the reason for delay, if any. Public utilities that have been granted incentive based rate treatment for specific transmission projects under provisions of 18 CFR 35.35 must file FERC-730. The report must conform to the format prescribed in Order No. 679, Appendix A. Filers are strongly encouraged to submit the FERC-730 electronically via eFiling. |
Chapter: 18 CFR 35.35
OMB #: 1902-0239, exp 05/31/2010
Filing Date: Initial filing is on April 18th of the year following issuance of the incentive-based rate, and subsequent filings are due each April 18th thereafter |
|
Forms |
|
Form No.
537: Notice of Bypass
Form No. 537: Semi-annual Storage
Report
Form No. 549: Intrastate Pipeline
Annual Transportation Report
Form No. 549B: Capacity Report
Under Section 284.13
Form No. 567: System Flow Diagrams
Form No. 576: Report of Service
Interruptions |
Form
No. 537 - Notice of Bypass |
Summary |
Information |
In the event of a bypass
of a local distribution company (LDC), the pipeline must
file a statement with FERC that the pipeline has notified
the LDC and the LDC s regulatory agency in writing of
the bypass prior to commencement of service. |
Chapter: 18 CFR Sec. 284.106(a),
18 CFR Sec. 284.126(a), & 18 CFR Sec. 284.223(b)
OMB #: 1902-0060, exp 5/31/2010
Filing Date: 30 days after commencing
transportation |
Form
No. 537 - Semi-annual Storage Report |
Summary |
Information |
The pipelines must file
a summary of storage injection and withdrawal activities
over six month injection or withdrawal seasons for storage
activity provided under the authority of sections 284.102
or 284.223. |
Chapter: 18 CFR Sec.
18 CFR Sec. 284.126(c)
OMB #: 1902-0060, exp 5/31/2010
Filing Date: 30 days after completion
of each storage injection and withdrawal season |
Form
No. 549 - Intrastate Pipeline Annual Transportation
Report |
Summary |
Information |
Each intrastate pipeline
transporting natural gas under section 311(a)(2) must
submit an annual report of transportation transactions.
The report must provide the name of the shipper, the
type of transaction, the quantity shipped and the revenues
received. The Commission considers this to be public information. |
Chapter: 18 CFR Sec. 284.126(b)
OMB #: 1902-0086, exp 09/30/09
Filing Date: March 31
» Preferred Filing Format |
Form
No. 549B - Capacity Report Under Section 284.13 |
Summary |
Information |
A report by interstate
pipelines operating under a blanket certificate showing
the pipeline's peak day capacity and the estimated storage
capacity and maximum daily delivery capability of its
storage facilities. The report must also show the respective
assignments of that capacity to the various firm services
provided by the pipeline. |
Chapter: 18 CFR Sec. 284.13
OMB #: 1902-0169, exp 11/30/10
Filing Date: March 1 |
Form
No. 567 - System Flow Diagrams |
Summary |
Information |
A diagram or diagrams
reflecting operating conditions on a major interstate
pipeline's main transmission system. |
Chapter: 18 CFR Sec. 260.8
OMB #: 1902-0005, exp 06/30/09
Filing Date: June 1 |
Form
No. 576 - Report of Service Interruptions |
Summary |
Information |
A report by an interstate
natural gas pipeline of serious interruptions of service
to any wholesale customer involving facilities operated
under certificate authorization from FERC. A natural
gas pipeline company making a report of a service interruption
pursuant to section 260.9 of the Commission's regulations
may fax its report to 202-208-2853. |
Chapter: 18 CFR Sec. 260.9
OMB #: 1902-0004, exp 8/31/2009
Filing Date: Within 20 days of a reportable
interruption of service |
Forms |
|
Form No.
80: Licensed Hydropower Development Recreation
Report
Other Federal Agency Cost Submission Form |
Form No. 80 - Licensed Hydropower Development Recreation Report |
Summary |
Information |
Downloads & Links |
The Form No. 80 is used to gather
information necessary for the Commission and other agencies
to know what recreational facilities are located at licensed
projects, whether public recreational needs are being
accommodated by the facilities, and where additional
efforts could be made to meet future needs. |
Chapter: 18 CFR Sec. 8.11
OMB #: 1902-0106, exp 09/30/10
Filing Date: April 1 |
|
Other Federal Agency Cost Submission Form |
Summary |
Information |
Downloads & Links |
The Commission is required to determine
the reasonableness of costs incurred by other Federal
agencies (OFAs) related to the participation of those
agencies in the Commission's proceedings under Federal
Power Act (FPA) Part 12 when those agencies seek to include
such costs in the administrative annual charges licensees
must pay to reimburse the United States for the cost
of administering Part 1. |
Chapter: 18 CFR Part 11;
16 U.S.C. §§ 794-823b.
Contact: Anton
Porter
202-502-8728 |
|
Forms |
|
Form No. 73: Oil Pipeline Service Life Data |
Form No. 73 -
Oil Pipeline Service Life Data |
Summary |
Information |
Downloads & Links |
During an investigation of an oil pipeline company’s book depreciation rates, FERC requests service life data as a part of its data request. This service life data, which may be initial data or an update to previously existing data, is collected on FERC Form No. 73. The information collected on FERC Form No. 73 is used as an input to assist the Commission in the selection of appropriate oil pipeline company service lives and book depreciation rates. |
Chapter: 18 CFR Part 357.3
OMB #: 1920-0019, exp 7/31/2011
Filing Date: Only during a depreciation rate investigation
|
|
Forms |
|
FERC-61: Narrative Description of Service Company Functions |
FERC-61 – Narrative Description of Service Company Functions |
Summary |
Information |
Downloads & Links |
FERC-61 is a filing requirement for service companies in holding company systems (including special purpose companies) that are currently exempt or granted a waiver of Commission’s regulations and therefore would not have to file FERC Form 60. Instead, service companies will be required to file on an annual basis a narrative description of the service company’s functions during the prior calendar year. In complying with this section, a holding company may make a single filing on behalf of all of its service company subsidiaries. The report is considered to be a non-confidential public use filing. |
Chapter: 18 CFR 366.23
OMB #: 1902-0215, exp 02/28/2010