skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Design Certification Applications for New Reactors
Issued
ABWR
AP1000
Applications Under Review
AP1000 Amendment
ESBWR
U.S. EPR
US-APWR

Issued Design Certification -
Advanced Passive 1000 (AP1000), Rev. 15

AP1000, Rev. 15
Who:   Westinghouse Electric Company, LLC

What:   Application for a Standard Design Certification for the Advanced Passive 1000 (AP1000) Design, a 3,400 MWt evolutionary pressurized-water reactor with passive safety features

When:   Westinghouse submitted the Standard Design Certification Application on March 28, 2002. The U.S. Nuclear Regulatory Commission (NRC) issued a final rule certifying the design on January 27, 2006.

Where:   See our map showing locations of projected new nuclear power reactors.

On this page:

To top of page

Project Overview

The NRC certified the AP1000 design in January 2006. The AP1000 is a 3,400 MWt pressurized-water reactor (PWR) designed by Westinghouse Electric Company, LLC. It is an evolutionary design with passive safety features.

The NRC staff initiated its formal review of the application on March 28, 2002, when Westinghouse submitted its application for final design approval (FDA) and standard design certification for the AP1000 design. The staff issued the FDA, along with the "Final Safety Evaluation Report [FSER] Related to Certification of the AP1000 Standard Design"(NUREG-1793), on September 13, 2004. The proposed design certification rule (DCR) was published in the Federal Register on April 18, 2005 (70 FR 20062). Subsequently, Westinghouse submitted changes to the AP1000 design information in Revision 15 to the design control document (DCD). The NRC staff evaluated those changes in a supplement to the FSER (NUREG-1793, Supplement 1). The Executive Director for Operations (EDO) transmitted the final DCR to the Commission on December 14, 2005 (SECY-05-0227, "Final Rule — AP1000 Design Certification"). Then, on December 30, 2005, the Commission voted to approve the final DCR for the AP1000 standard plant design, and the Secretary of the Commission signed the final rule on January 23, 2006, after approval of the information collection requirements by the Office of Management and Budget. On January 27, 2006, the NRC issued the AP1000 final DCR in the Federal Register (71 FR 4464). Applicants or licensees intending to construct and operate a plant based on the AP1000 design may do so by referencing its DCR, as set forth in Appendix D to Title 10, Part 52, of the Code of Federal Regulations (10 CFR Part 52, Appendix D). On March 10, 2006, the NRC issued a revised FDA based on Revision 15 of the Westinghouse DCD.

To top of page

Applicant's Design Control Document

The following links provide access to document files submitted by the applicant in Adobe Portable Document Format (PDF). The NRC is making these files available on the agency's public Web site as a service to the public. Please note, however, that the NRC cannot guarantee the accuracy of the information provided, or the integrity of the links within and between these files. To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page.

Description
Tier 1 - Table of Contents
Tier 2 - Table of Contents
Tier 2 - Ch. 1 - Introduction and General Description of the Plant
Tier 2 - Ch. 2 - Site Characteristics
Tier 2 - Ch. 3 - Design of Structures, Components, Equipment and Systems
Tier 2 - Ch. 4 - Reactor
Tier 2 - Ch. 5 - Reactor Coolant System and Connected Systems
Tier 2 - Ch. 6 - Engineered Safety Features
Tier 2 - Ch. 7 - Instrumentation and Controls
Tier 2 - Ch. 8 - Electric Power
Tier 2 - Ch. 9 - Auxiliary Systems
Tier 2 - Ch. 10 - Steam and Power Conversion
Tier 2 - Ch. 11 - Radioactive Waste Management
Tier 2 - Ch. 12 - Radiation Protection
Tier 2 - Ch. 13 - Conduct of Operations
Tier 2 - Ch. 14 - Initial Test Program
Tier 2 - Ch. 15 - Accident Analyses
Tier 2 - Ch. 16 - Technical Specifications
Tier 2 - Ch. 17 - Quality Assurance
Tier 2 - Ch. 18 - Human Factors Engineering
Tier 2 - Ch. 19 - Probabilistic Risk Assessment

To top of page

NRC Safety Evaluation Report

  • NUREG-1793, "Final Safety Evaluation Report Related to Certification of the AP1000 Standard Design"

  • NUREG-1793, Supplement 1, "Final Safety Evaluation Report Related to Certification of the AP1000 Standard Design"

To top of page

Design Certification Rule for the AP1000 Design

To top of page

Contacts

For additional information regarding the AP1000 design certification, please Contact a Public Affairs Officer.

To top of page



Privacy Policy | Site Disclaimer
Friday, September 26, 2008