Search Options | ||||
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us |
Standard Review Plan for the Review of a Reclamation Plan for Mill Tailings Sites Under Title II of the Uranium Mill Tailings Radiation Control Act of 1978 (NUREG-1620, Final Rev. 1)ContentsDownload complete document The following links on this page are to documents in Adobe Portable Document Format (PDF). See our Plugins, Viewers, and Other Tools page for more information. For successful viewing of PDF documents on our site please be sure to use the latest version of Adobe. Publication InformationDate Completed: June 2003 Prepared by J. Lusher, NRC Project Manager Division of Fuel Cycle Safety and Safeguards AbstractA U.S. Nuclear Regulatory Commission source and byproduct materials license is required by 10 CFR Part 40 for the operation of uranium mills and the disposal of “tailings,” wastes produced by the extraction or concentration of source material from ores processed primarily for their source material content. Appendix A to Part 40 establishes technical and other criteria relating to siting, operation, decontamination, decommissioning, and reclamation of mills and of tailings at mill sites. The licensee’s site reclamation plan documents how the proposed activities demonstrate compliance with the criteria in Appendix A to Part 40 and the information needed to prepare the environmental assessment on the effects of the proposed reclamation activities on the health and safety of the public and on the environment. This standard review plan is prepared for the guidance of staff reviewers in the Office of Nuclear Material Safety and Safeguards in performing safety and environmental reviews of reclamation plans for uranium mill tailings sites covered by Title II of the Uranium Mill Tailings Radiation Control Act of 1978 as amended. It provides guidance for new reclamation plans, license renewals, and license amendments. The principal purpose of this standard review plan is to ensure the quality and uniformity of staff reviews and to present a well-defined base from which to evaluate changes in the scope and requirements of a review. This standard review plan is written to cover a variety of site conditions and reclamation plans. Each section contains a description of the areas of review, review procedures, acceptance criteria, and evaluation findings. Revision 1 also incorporates information to address new Commission policy on several issues related to uranium recovery. |
Privacy Policy |
Site Disclaimer |